Mark McKinnon NSF Mid-Project Review May 11-12, 2006 1 EVLA Advisory Committee Reports Mark McKinnon Project Manager.

Slides:



Advertisements
Similar presentations
National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
Advertisements

DECam Community Pipeline Review Closeout Presentation DES Council of Directors’ Review August 30-31, 2010 NCSA, Urbana IL.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, 2007 Progress on 2006 Committee Recommendations Mark McKinnon Project Manager.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, 2007 Project Management Mark McKinnon Project Manager.
Planning. SDLC Planning Analysis Design Implementation.
Jim UlvestadEVLA Mid-Project Review May 11-12, EVLA Operations Jim Ulvestad Array Science Center Concept (Requirements) Staffing and Cost Plans.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
SIUE Injury Tracking System Project Plan. Team Members: Robbie Marsh Robbie Marsh –Project Manager/Webmaster Ken Metcalf Ken Metcalf –Lead Programmer.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
McMullinEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Data Post-processing: SSG (AIPS++/CASA) Development J. McMullin.
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Mark McKinnon NSF Mid-Project Review May 11-12, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Doug Tody E2E Perspective EVLA Advisory Committee Meeting December 14-15, 2004 EVLA Software E2E Perspective.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
Response to ASAC Report of May 2004 Response to ASAC The Atacama Large Millimeter Array Tom Wilson and Al Wootten Science IPT.
2007Sep06 EAC Butler - Software Overview 1 Software Overview Bryan Butler.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
RupenEVLA Advisory Committee Meeting May 8-9, Scientific Oversight and Testing of Software Michael P. Rupen EVLA Project Scientist for Software.
Post-processing Overview Bryan Butler, for Joe McMullin.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
EVLA Computing Software Overview. Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, Contents History Organization and staffing Staffing.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Mark McKinnon NSF Mid-Project Review May 11-12, EVLA Advisory Committee Reports Mark McKinnon Project Manager.
Bryan ButlerEAC meeting 2003-Sep-091 Computing Issues: Scientific Requirements Bryan Butler EVLA Project Scientist for Software (starting 2003-Oct-01)
RupenEVLA Advisory Committee Meeting May 8-9, Software Requirements Michael P. Rupen EVLA Project Scientist for Software rev. 3may06.
Atacama Large Millimeter/ submillimeter Array - ALMA ASAC Charges For Oct 31 ASAC Report to ALMA Board Al Wootten JAO Interim Project Scientist.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, Project Overview Mark McKinnon Project Manager.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Rick PerleyEVLA Advisory Committee Meeting December 14 – 15, EVLA `Descoping’ Options Rick Perley.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
Computing Introduction Gareth Hunt EVLA System PDR 2001 December 04.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Overall Data Processing Architecture EVLA timeline and priorities.
Jim UlvestadEVLA Advisory Committee Meeting May 8-9, EVLA Operations Jim Ulvestad Array Science Center Concept Requirements Staffing and Cost Plans.
S.T.MyersEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Data Post-processing Overview Steven T. Myers AIPS++ Project Scientist.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Management Plan Peter Napier Project Organization Schedule Budget.
Fall 2006P7305: Freshman Practicum AM Receiver P7305: Learning Module for EE Freshman Practicum Chris Urban: Lead Engineer Hans-Christian Rotmann: Project.
BSA 376 Competitive Success/snaptutorial.com
BSA 376 Education for Service/snaptutorial.com
EVLA Computing Software Overview.
Budget, Schedule, Contingency
Software Requirements
EVLA M/C Software PDR, 14 May 2002
Scientific Oversight and Testing of Software
VLA to EVLA Transition Plan
EVLA Computing Reorganization
EVLA Advisory Committee Meeting
Software Requirements
Gustaaf van Moorsel September 9, 2003
Mark McKinnon EVLA Project Manager
Background Information P.Napier
EVLA Advisory Committee Meeting, March 19-20, 2009
Observatory Science Operations
EVLA Operations Jim Ulvestad
Observatory Science Operations
EVLA Construction Status
Presentation transcript:

Mark McKinnon NSF Mid-Project Review May 11-12, EVLA Advisory Committee Reports Mark McKinnon Project Manager

Mark McKinnon NSF Mid-Project Review May 11-12, Outline Panel membership Meetings Responses/Actions on Recommendations

Mark McKinnon NSF Mid-Project Review May 11-12, Panel Membership Tony Beasley (ALMA) – management, science Sean Dougherty (NRC) – science John Dreher (SETI) – systems engineering, electronics, science Marco de Vos (NFRA) – science Glenn Miller (STScI) – software Gianni Raffi (ESO) – software Mark Reid (CfA) – science Luis Rogriguez (UNAM) – science Alan Rogers (Haystack) – electronics Stephen Scott (CalTech) – science, software Tom Soifer (CalTech) – science, management Steve Thorsett (UCSC) – science Jacqueline van Gorkom (Columbia) – science Sander Weinreb (JPL) – electronics, systems engineering

Mark McKinnon NSF Mid-Project Review May 11-12, EAC Meetings May 8-9, 2006 December 14-15, 2004 September 8-9, 2003 June 10-11, 2002

Mark McKinnon NSF Mid-Project Review May 11-12, Actions on 2004 EAC Recommendations - 1 Overrun in contributed effort from the operations budget to the EVLA project –$2.1M charged to the project Inadequate resources for EVLA e2e effort –10 FTE years ($1M ) provided by the project. –e2e Operations Division created for entire Observatory –Redirection of Observatory resources to e2e –Additional resources from AUI under consideration Complete refinement of L-band OMT design –Test results presented at recent FE CDR

Mark McKinnon NSF Mid-Project Review May 11-12, Actions on 2004 EAC Recommendations - 2 Conduct a careful scientific trade-off study of descope options –Scientific study of descope options will be undertaken in FY07. Bring younger NRAO staff into debugging and commissioning activities. –Additional, younger staff actively engaged. –Additional staff to be hired in FY07.

Mark McKinnon NSF Mid-Project Review May 11-12, Actions on 2004 EAC Recommendations - 3 For system tests, two sets of antenna electronics need to operate simultaneously in the electronics lab –Excellent suggestion. Can currently simulate 2 central reference sources and 2 LO fiber links in the lab. Scope of the M&C system, its science requirements, and interfaces are not clearly defined –M&C design document is nearing completion. Includes internal interface definition. –Software development plan completed (identifies code description, developer, and timeline). –Completed report characterizing information distributed in M&C system.

Mark McKinnon NSF Mid-Project Review May 11-12, Actions on 2004 EAC Recommendations - 4 No standards for M&C design and coding. –Biweekly code reviews. –CVS used for source and version control. –Maven for build environment. Standard nightly code builds. No M&C test and integration (T&I) plan –In transition from VLA to EVLA, EVLA antennas work must work with existing M&C system –Longstanding T&I procedure in place and being used –Will develop formal T&I plan for correlator in the final M&C system.

Mark McKinnon NSF Mid-Project Review May 11-12, Actions on 2004 EAC Recommendations - 5 Adequate design of the e2e system is lacking. –More resources assigned to e2e, and High Level Architecture (HLA) team has started the e2e design. Identify and prioritize EVLA-specific requirements for CASA so that required resources can be identified –Post-processing requirements common and unique to ALMA and EVLA are being identified (e.g. wide-field imaging and calibration).

Mark McKinnon NSF Mid-Project Review May 11-12, Actions on 2003 EAC Recommendations - 1 Study options that will lead to completion of the low frequency upgrade –Technical solution not sufficiently well developed to warrant a proposal for funding –Low frequency upgrade removed from EVLA 2 proposal Submit the EVLA 2 proposal –Submitted April 2004 Investigate lowering receiver noise temperature by installing polarization-forming hybrid after the LNAs. –Investigated. Difficult to meet polarization requirements

Mark McKinnon NSF Mid-Project Review May 11-12, Actions on 2003 EAC Recommendations - 2 Interferometry Software Division has responsibilities to many projects. Ensure that EVLA project needs are met. –Majority of post-processing software is common to ALMA and EVLA. Coordinated effort makes sense. –EVLA has representation in all areas of post-processing development. –Plan developed to define deliverables, acceptance criteria, and schedule for reviews Improve interferometer algorithm development, with attention to RFI issues. –Ongoing effort of Project Scientist tests concepts of post- correlation RFI excision –Foster communication between groups at other observatories –Formally outside the scope of the project

Mark McKinnon NSF Mid-Project Review May 11-12, Actions on 2003 EAC Recommendations - 3 Develop contingency plan to mitigate correlator risk –Test and verification plan implemented for pre-production behavioral simulation of correlator chip –Additional computer tools used to ensure that digital implementation of the chip is the same as the behavioral simulation. Better define the interface between M&C and the correlator –M&C requirements and functional specifications for the correlator backend developed –Ongoing meetings conducted with Canadian partners to specify and develop the M&C/correlator interface

Mark McKinnon NSF Mid-Project Review May 11-12, Actions on 2002 EAC Recommendations - 1 Use project contingency to build EVLA 2’s low frequency system or E-array –Not enough funds in contingency Submit EVLA 2 proposal as soon as possible. –Proposal submitted in April 2004 Consider RFI from complete systems point of view –Divided L-band amplifier into two gain blocks so that a filter can be inserted to suppress DME signals and avoid amplifier compression –Conducted intermodulation assessment to maintain high dynamic range –Developed post-correlation scheme for RFI mitigation (EVLA Memo 86)

Mark McKinnon NSF Mid-Project Review May 11-12, Actions on 2002 EAC Recommendations - 2 Use of surface-mount and chip microwave integrated circuits (MMICs) is highly- recommended to reduce costs. –Surface-mount components and MMICS have been used as suggested. Costs reduced Project lacks overall M&C design and software engineering approach –Overall M&C design is underway –Engineering approach adopted to gather requirements, create a design, and proceed to implementation.

Mark McKinnon NSF Mid-Project Review May 11-12, Actions on 2002 EAC Recommendations - 3 e2e program is too general, lacks presence of active radio astronomers, and doesn’t require deliverables on a regular basis. –AIPS++ and e2e reorganized to give projects (EVLA and ALMA) more direct control of the work –e2e and AIPS++ project scientists appointed –Scientific and software requirements documents written. Milestones derived from requirements. –Active users group (NAUG) meets regularly to set programmer priorities