Beam intensity profile measurements with the RHIC (AGS) C-CNI polarimeters. Polarization profile measurements. Polarimeter target mechanisms upgrades.

Slides:



Advertisements
Similar presentations
AGS Status and Plans RHIC Spin Collaboration Meeting 2/4/11.
Advertisements

FNAL Emittance Devices Flying Wires (FW) Sync Lite Ion Profile Monitors (IPM) aah,6/20/2000.
APEX Report April 28-29, 2009 May 4, 2009 Fulvia Pilat Time Meeting, May
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
RHIC/AGS Polarimeter Study May 1, 2009 H. Huang, A. Zelesnki, B. Morozov.
The 2nd Tevatron Electron Lens and tests of a new electron gun in the framework of Beam-Beam Compensation project Yu. Alexahin, V. Kamerdzhiev, G. Kuznetsov,
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
11/18/2003Haixin Huang1 RHIC Polarimeter Status All targets and Si detectors have been installed at the end of October. The targets survived the vacuum.
IPBSM status and plan ATF project meeting M.Oroku.
Polarimetry of Proton Beams at RHIC A.Bazilevsky Summer Students Lectures June 17, 2010.
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
AGS/Booster PP Setup Plan Jan. 11, 2013 RSC Meeting Haixin Huang.
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
Systematic Errors Studies in the RHIC/AGS Proton-Carbon CNI Polarimeters Andrei Poblaguev Brookhaven National Laboratory The RHIC/AGS Polarimetry Group:
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Polarized beam in RHIC in Run Polarimetry at RHIC A.Zelenski, BNL PSTP 2011, September 13, St.Petersburg.
Relative Polarization Measurements of Proton Beams Using Thin Carbon Targets at RHIC Grant Webb Brookhaven National Laboratory Sept 14, 2015PSTP20151 for.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
Plan in summer shutdown Magnet -SF1FF -Swap of QEA magnet - Multipole field of Final Doublet IP-BSM improvement.
OPPIS performances in Run-6. First 4 weeks. RSC meeting, February 10, 2006.
APEX Report: February 26-27, 2008 Fulvia Pilat Time Meeting, March 4, 2008.
» RHIC Polarimetry « Oleg Eyser for the RHIC Polarimetry Group 2014 RHIC Retreat, August 14.
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
A. Zelenski a, G. Atoian a *, A. Bogdanov b, D.Raparia a, M.Runtso b, D. Steski a, V. Zajic a a Brookhaven National Laboratory, Upton, NY, 11973, USA b.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
The RHIC C-CNI polarimeter upgrade for 2009 Run. RSC Meeting, December 16, 2008 Anatoli Zelenski for polarimeter upgrade group. T.Russo, T.Curcio, D.Lehn,
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
Run6 CNI Analysis: Concluding Remarks and Summary of Systematic Uncertainties A.Bazilevsky For RHIC CNI group RHIC Spin Collaboration Meeting November.
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
Status of Hybrid target R&D at KEK-LINAC T.Takahashi Hiroshima University March 2011 ALPG11 Eugene Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,
RHIC CNI Polarimeter status RHIC CNI Group February 26, 2008.
Polarized source upgrade RSC, January 11, OPPIS LINAC Booster AGS RHIC ( ) ∙10 11 p/bunch 0.6mA x 300us→11∙10 11 polarized H - /pulse. ( )
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Developments and Beam Studies for the Injectors APEX Workshop 2Nov06 ahrens.
P-Carbon CNI polarimeter upgrades. Vacuum system. Target drives. Targets. Polarimetry Workshop, July 31, 2009 A.Zelenski for polarimetry group.
10/5/2005 jrz1 Not quite “All” you want to know about Flying Wires At Fermilab Jim Zagel 10/5/2005.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Proton Polarimetry Proton polarimeter reactions RHIC polarimeters.
Absolute Polarization Measurement at RHIC in the Coulomb Nuclear Interference Region September 30, 2006 RHIC Spin Collaboration Meeting RIKEN, Wako, Japan.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
RHIC 250 GeV Polarized Proton Run 2009 Mei Bai RUN website: 12/16/2008RHIC Spin Collaboration Meeting.
RHIC pC polarimeter what has been achieved and what needs to be done Osamu Jinnouchi RBRC 2/10/05 RSC meeting.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
RHIC pC Polarimeters in Run9: Performance and Issues A.Bazilevsky for the RHIC CNI Group Polarimetry Worshop BNL, July 31, 2009.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
CNI polarizations in Run09: Summary A.Bazilevsky For the RHIC CNI Group March 26, 2010 RSC meeting.
AGS FY11 Summary RHIC Spin Collaboration Meeting 5/6/11.
Injector Status Feb. 9, 2016 Time Meeting Haixin Huang.
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
APEX Status and Plan Phil’s Meeting, March 20, 2012 M. Bai.
RHIC pC Polarimeter status A.Bazilevsky For RHIC CNI Group February 26, 2008.
APEX RUN-11 APEX Schedule Planned Feb. 23, pm ~ 3 ramps 8am 12x12 store Physics store Beta* unsqueeze +s* adjustment GRD+team 6x6 store AC dipole.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
LHC Wire Scanner Calibration
Mechanical Design Review February 25, 2008 Université de Montréal
Mechanical Design Review February 25, 2008 Université de Montréal
LHC Emittance Measurements and Preservation
Alice solenoid – orbit distortion
Run5 Analysis of RHIC-pC Polarimeter
Presentation transcript:

Beam intensity profile measurements with the RHIC (AGS) C-CNI polarimeters. Polarization profile measurements. Polarimeter target mechanisms upgrades. RSC meeting, January 15, 2008

Yellow polarimeter target motion upgrade

In 2007 the BLUE target motion mechanisms were upgraded again. New precision rotary motion feedthroughs were installed. No backlash, high reproducibility, smooth motion.

P-Carbon CNI polarimeter target. Target speed 200 steps/sec → 25 mm/sec linear speed. ~ 100 mm RHIC beam 180 mm 10 mm Scattering angle ~0.5 deg ~1.6 mm

P-CNI polarimeter as a wire scanner: Very thin target, practically non-destructive. Very high rate. Very good signal/noise ratio. Delayed C-ion detection. Single bunch measurements. Problems so far : Target alignment. Carbon strips are not straight. Target mechanism positioning accuracy was not satisfactory (positioning to the detector plane, large backlash, target vibrations). Broken rotational feed through. P-CNI polarimeter can be an ideal wire-scanner. Deutron beam horizontal profile

Deutron beam horizontal profile measurement, Jan

Large emittances with the wrong ATR beamline tune.

Measurement after the ATR tune was corrected. Feb.6

Measurements at Store, Feb. 7

Large emittances at store Feb10, 9:50

Horiz. Emittances at injection, consistent with numbers measured in AGS and ATR.

Blue horiz profile measurement with Target #1, Febr.15

Polarization profile measurement with Target #1

Blue.horiz. at store, Target #5, Febr.15.08

Yellow polarization profile,Target #1, Febr.15

Run 06.

Emittance mode measurement, Run06

Emittance scan measurement, Febr.15

IPM measurements, Febr pi 15 pi16 pi

IPM measurements

Horizontal profile measurements in AGS.

Emittance measurement in AGS, single pulse at flattop. Sigma 0.96 mm~15 pi Horiz emittance

Target mechanism upgrades. A new target holder and jig for accurate target positioning. New rotational feedthroughs with direct step-motor coupling, larger (3/8” diam) rod and extended bearing support at the end. A new feedthrough support with provision for precision alignment of the target motion axis and translational motion stages. A new target mechanism attachment plates. No need for mechanism realignment. 4-targets (horizontal) for vertical beam profile scans and 6-targets (vertical) for horizontal profile scans. The target ladder can be moved under the beam. All six vertical targets can be used in the same fill. We plan to install one 20um target and one 40 um target in addition to regular (5-10 um) targets to study the systematic error to polarization measurements at different target thickness. Thicker (hopefully straighter) targets will be used for the beam profile measurements.

May 28, 18:37, injection

April 21, 14:53, at store

Summary. The rotational feedthroughs do not provide accurate positioning (even after all upgrades) and have to be replaced. The target thickness for the profile measurements (and polarization measurements ) have to be optimized. Targets mounting on the ladder has to be improved and tested. The CNI polarimeter is an amazing device. It worked in spite of all the above mentioned problems. I hope it will also survive all the improvements we have made with the very best intentions.

Emittance measurements in RHIC.