Canadian Light Source Commissioning Progress CLS Annual Users Meeting – 2003-11-15.

Slides:



Advertisements
Similar presentations
2002 November 16 CLS PROJECT STATUS M.S. de Jong Project Leader November 16, 2002 Annual Users’ Meeting.
Advertisements

CESR as Light Source David L. Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
Necessity of Moving from Green Book to White Book M. Hadi Hadizadeh Yazdi International Scientific Meetings Office Iran October 26, 2002 Amman, Jordan.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Injection System with a Booster in Separate Tunnel T. Shaftan for the NSLS-II team.
SSRF Light Source Complex Zhao Zhentang for the SSRF Project Team Shanghai Symposium on Intermediate Energy Light Sources Shanghai China, September 24-26,2001.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
Damping Rings Discussion Session: Implications and Impact of the Central Injector Configuration and Other Layout Issues ILCDR07 Workshop.
Design and Performance Expectation of ALPHA accelerator S.Y. Lee, IU 2/26/ Introduction 2. Possible CIS re-build and parameters 3. Issues in the.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
CESR-c Status CESR Layout - Pretzel, Wigglers, solenoid compensation Performance to date Design parameters Our understanding of shortfall Plans for remediation.
Prepare DORIS for particle physics again F.Brinker, DESY, March 31 st 2008 Injector chain to Doris and Petra Situation at the IP-region Beam optic Work.
Beam Dynamics Tutorial, L. Rivkin, EPFL & PSI, Prague, September 2014 Synchrotron radiation in LHC: spectrum and dynamics The Large Hadron Collider (LHC)
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
G.N. Kulipanov, N.A.Mezentsev, A.V. Philipchenko, K.V. Zolotarev
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Conventional Facilities Advisory Committee May 8 - 9, 2007 Satoshi Ozaki Director,
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Update of 3.2 km ILC DR design (DMC3) Dou Wang, Jie Gao, Gang Xu, Yiwei Wang (IHEP) IWLC2010 Monday 18 October - Friday 22 October 2010 Geneva, Switzerland.
Vacuum Issues from the Beam Dynamics Point of View Marc Muñoz.
Simulation and Experimental Results of SSRF Top-up Operation Haohu Li, Manzhou Zhang SSRF Top-up Workshop, Melbourne
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
Gwo-Huei Luo on behalf of Keng Liang and TPS Design Team NSRRC, Hsinchu, Taiwan XBPM and Beam Stability Workshop, Sept. 11, 2008 Status of TLS and Taiwan.
SiriusUVX LNLS – National Synchrotron Light Laboratory CNPEM – Brazilian Center for Research on Energy and Materials A R Rodrigues, M Lisboa, R Madacki.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
February 2010 ALBA Synchrotron Light Source Francis Perez.
ELECTRON MOVING AT CONSTANT VELOCITY
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
Automatic Machine Review Dec 2015 MAX IV Storage Rings Automation Pedro F. Tavares.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
PETRA III, A New High Brilliant Light Source At DESY
CEPC Booster Zhang Chuang, Cui Xiaohao September 11,2015.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
FCC-ee booster: preliminary design study Dmitry Shwartz BINP
Damping Ring Specifications S. Guiducci ALCPG11, 20 March 2011.
Low Emittance Rings 2014 Workshop INFN-LNF, 18. September 2014 Low Emittance Studies at 3 GeV at PETRA III Joachim Keil DESY.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
FCC-ee injector complex including Booster Yannis Papaphilippou, CERN Thanks to: M.Aiba (PSI), Ö.Etisken (Ankara Un.), K.Oide (KEK), L.Rinolfi (ESI-JUAS),
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
Operation Status of the RF Systems and Taiwan Photon Source
MACHINE OPERATION AT ALBA Montse Pont, CELLS-ALBA 16-18/12/2013.
Montse Pont ARW 2013 Operation and Reliability at ALBA Montse Pont.
PETRA III, Status and Upgrade
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Bocheng Jiang SSRF AP group
Low Emittance Rings 2014 Workshop
An overview the ASTRID2 storage ring and its RF system
Machine Operation and Progresses in SSRF
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
CEPC Injector Damping Ring
Cui Xiaohao, Bian Tianjian, Zhang Chuang 2017/11/07
LHC (SSC) Byung Yunn CASA.
ILC 3.2 km DR design based on FODO lattice (DMC3)
Специализированный источник синхротронного излучения Anka Характеристики и экспериментальные возможности.
ILC 3.2 km DR design based on FODO lattice (DMC3)
Overview LINAC BOOSTER STORAGE RING 100 Mev Commissioned in 2008
Status of the ASTRID2 RF systems
Parameters Changed in New MEIC Design
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
MEIC Alternative Design Part V
3.2 km FODO lattice for 10 Hz operation (DMC4)
Presentation transcript:

Canadian Light Source Commissioning Progress CLS Annual Users Meeting –

22003 November 15 Facility Layout

32003 November 15 Booster Commissioning Blue: Dipole Field Yellow: PCT average current – 8 mA Green: FCTpeak current – 40 mA injected, 20 mA extracted

42003 November 15 CLS Storage Ring 2.9 GeV DBA lattice with 12-fold period m circumference Nominal Tune: x = y = 3.26 E loss per turn: > MeV Bend magnet radiation: c = 1.6 Å E c = 7.6 keV  x (natural damped) = 18.1 nmrad Damping times:  x = 2.4 ms,  y = 3.8 ms,  E = 2.7 ms ~10 mm bunch length

52003 November 15 Typical Storage Ring Sector

62003 November 15 Split Sector Magnets

72003 November 15 Sector Vacuum Chamber

82003 November 15 Vacuum Bake-out

92003 November 15 Superconducting RF Cavity

November 15 Storage Ring Injection & RF

November 15 Storage Ring Sector

November 15 Storage Ring

November 15 Storage Ring Straight

November 15 Commissioning Plan 4-week Runs: 2 installation + 2 run –Started 2003 September –Initial sequence: First turn Stored beam Stacked beam Vacuum conditioning Radiation survey for licensing –Goal: 100 mA > 6 hour lifetime Good reliability and stability

November 15 Storage Ring Commissioning – Run 1 Yellow: Storage Ring current at injection septum Measured on

November 15 Storage Ring Commissioning – Run 2 Green: Storage ring current Measured

November 15 Storage Ring Commissioning – Run 3 Green: Booster beam Pink: SR1 beam loss measured by CBLM Measured

November 15 Plan for 2004 Q1: –SGM/PGM front-ends, POE and IDs –Optical chicanes for IR lines –Start of day-time operation Q2: –SM and PX front-ends, POEs and IDs –XAFS front-end and POE Q3: –XAFS wiggler –Tentative start of 24-hour operation Q4: –Increase current to 200 mA and lifetime to ~10 h

November 15 Future Projects Modifications for top-up operation Fast transverse feedback Linac modifications/upgrade Come to Sunday session to discuss other long range possibilities