CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Construction Engineering 221
Roles & Responsibilities in Construction Management
Managing Construction Risks
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Construction Cost Estimating Class #2: Contract Documents Prof. Ralph V. Locurcio, PE.
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
CONSTRUCTION ADMINISTRATION Preconstruction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
14.21 Contract Closeout Procedure Update Notice of Completion, Release of Retention and Punchlist Resolution December 8, 2005.
OCR Payment Process Training 01/17/2012. Article 9 – Compensation and Payment General Conditions – Article 9 – 9.1 Preconstruction Stage Compensation.
CTC-470 Construction Administration Project Management Concepts.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
Conditions of the Contract for Construction
ESTIMATING By Laith Jacob.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
Construction Management: At Risk. PROJECT MANAGEMENT STRUCTURE: Contractual Relationships Owner Architect/Engineer General Contractor Sub Construction.
Standards of Practice Course
CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.
CEM 520 Construction Contracting Dr S. Almohawis Course Content.
CONSTRUCTION MANAGEMENT CONSTRUCTION ENGINEERING & MANAGEMENT DEPT
CVE 4070 Construction Engineering Project Closeout Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Test-2 & Review Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Disaster Recovery Prof. Ralph V. Locurcio, PE.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
CON CVE 4070 Construction Engineering Course Introduction Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Shop Drawings Quality Control
CVE 4070 Construction Engineering Contract Documents Prof. Ralph V. Locurcio, PE.
CON 2001-CVE 4070 Construction Engineering Project Organization & Stakeholders Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Value Engineering Prof. Ralph V. Locurcio, PE.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Procurement Authority Representative Roles and Responsibilities Amanda Price, Program Development Coordinator, Planning and Programming, Transportation.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
CVE 4070 Construction Methods & Engineering Preconstruction Operations Resume Information Prof. Ralph V. Locurcio, PE.
Agency Construction Management :CM NOT AT-RISK
You passed the Bond or secured some funds What do we do now? 2014.
CON 2001 CVE 4070 Construction Engineering Disaster Recovery Prof. Ralph V. Locurcio, PE.
Construction Eng 221 Project Management and Administration.
CON 2001 CVE 4070 Construction Methods/Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Risk Management Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Quality Control Value Engineering
CVE 4070 Construction Engineering Construction Estimating Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Project Closeout & Pyramid Solution
CVE 4070 Construction Engineering Course Review Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Project Organization Test #1 review Prof. Ralph V. Locurcio, PE.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
University of Calgary Continuing Education Construction Contract Law and Documents Week 12 Changes Delays Claims Contract Documentation.
CVE 4070 Construction Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering HW #6 review Test-2 & Review Prof. Ralph V. Locurcio, PE.
An Overview Of The MBP CM Leadership Manual Presented by: Robert J. Carter, CCM Robert M. Pfeiffer, CCM.
Collaboration of Entitlement and Cost Efforts in Claims Analysis Rubino & McGeehin Consulting Group June 27, 2005.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
1 Today’s pegboard Drawings & Specd due 11/21. 2 Today’s pegboard Cirrious Tightpinch.
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Resident Engineer Training
CONTRACT DOCUMENTS & CONSTRUCTION
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Construction Contracts
Directed Change Constructive Change
Presentation transcript:

CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE

Course Wrap-up (new) 11/22FIT Holiday – Thanksgiving 11/27 26Construction Leadership & Ethics Ethics Paper, Kerzner Ch /28 27Course Wrap-up; review & critiqueNotebook turn-in 11/29 28Final Test & Critique 12/04 29 Study Day

Course review - I  Project delivery process Pyramid analysis  Responsibilities of parties  Tour ongoing construction Conduct of operations Complexity of coordinating trades Impact of externalities  Preconstruction operations Contract documents & order of precedence Specs & Drawings; use of standard specs Contract bid & award process Bonds

Preconstruction Operations  Project delivery system  Organization for construction… flow of activities Idea for project, hire designer, design concept, final design, cost estimate, contract documents, bidding process, select contractor, notice to proceed, pre- construction meeting, inspection of work, project turnover to owner.  Roles of individuals… owner, designer, builder, PM, CM, owner’s rep  Who has responsibility for quality control on a project? What is QA and what is QC.  How do you verify that construction conforms to the design?  Typical types of projects, traditional, design-build. Who hires the designer in each?

Course review - II  Contract Administration Inspection process & Inspection Manual Submittal process Quality Control & Assurance Role of the resident engineer  Contract scheduling Types of schedules & when used Use of MS Project Pyramid Schedule  Disaster Recovery Construction Differs from normal Types of contracts used Skills you will need

Contract Documents  Contract documents… drawings, specs, contract agreement  Construction estimates what are the two types; conceptual & detailed.. when are they used and what is the accuracy of each  What is the order of precedence of CDs  If conflict between drawings & specs, which is followed.  What are standard specifications and why should you use them

Contract Types & Uses  Contracts – what are the types typically found – fixed price & cost plus  When are these contracts used… what situations.  Bidding process - what are the key activities in the process and what is the order  How do you maintain equity in bidding  Legal aspects of contracts, evidence  Negotiations & disputes, how settled  Risk and risk management, how allocated  Bonds and insurance, types and use

Contracting…  Letter contracts  Cost plus contracts  Unit price contracts  Indefinite quantity contracts  Design-build contracts  Design contracts  Fixed price contracts

Course review - III  Construction operations… Scheduling – types & when used Use of MS Project – Pyramid schedule Construction operations Quality control Measurement & Payments Estimating Changes & Disputes Negotiating Laws & legal issues Value engineering Project closeout

Pyramid Construction…

Pyramid Schedule…

Construction Operations  Site safety of construction… control of the site. Who can issue a stop work order.  Shop drawings what are they and how used  The inspection process  Non-conforming work; how handled  What are differing site conditions  What is a change order  Change order process  What is the one-to-one concept of authority on a construction project  Construction schedules what are the types…  Project inspection; what is the process  Value engineering; how used, where are savings

Contract inspection & supervision…  Verify quantity & time of operations Manpower & equipment use Material quality & quantity  Engineering sufficiency of work  Quality of work  Deviations from damage survey  Negotiate claims for additional work  Certification for occupancy

CVE 4070 Review for Test 3  Preconstruction Operations – Bidding Process  Contract Documents  Contract Types & Uses  Construction Operations Scheduling Payments & Retention Estimating concepts & calculations  Conceptual vs Detailed  Methods  Adjustments for time, location  Escalation Value engineering  Law for Engineers

Test #3… things to consider-1  Construction operations… Cost control Performance control Charting cost & performance  Contracts & payments What is a contract Types of contracts… pros & cons, when used Progress payment process Problems with payments

Test #3… things to consider-2  Estimating… Definition Accuracy vs level of design Types of estimates – how calculated Time & location adjustments Scope, constructability, risk Estimating process Elements of cost  Changes & extra work What is a change & claim Types of changes Change order process

Test #3… things to consider-3  Claims & disputes… What is a claim or protest What are owners responses What are contractor’s responses What are compensable or non-compensable claims What is acceleration, when used, who pays What methods are available to resolve disputes Contract termination

Test #3… things to consider-4  Law for Engineers… Basis for Laws Differences between engineering judgment & legal judgments Civilian Law vs. Public Law Torts & Contracts Damages & Compensation