Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.

Slides:



Advertisements
Similar presentations
Heat load due to e-cloud in the HL-LHC triplets G. Iadarola, G. Rumolo 19th HiLumi WP2 Task Leader Meeting - 18 October 2013 Many thanks to: H.Bartosik,
Advertisements

LONGITUDINAL (IN)STABILITY WITH BATCH INJECTION T. Argyropoulos, P. Baudrenghien, C. Bhat, J. E. Muller, T. Mastoridis, G. Papotti, E. Shaposhnikova,
Summary of the two-stream instability session G. Rumolo, R. Cimino Based on input from the presentations of G. Iadarola, H. Bartosik, R. Nagaoka, N. Wang,
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
R. Cimino COULOMB’05, Senigallia, Sept 15, Surface related properties as an essential ingredient to e-cloud simulations. The problem of input parameters:
Vacuum, Surfaces & Coatings Group Technology Department 04/12/2014 R. Salemme – COLDEX results during SPS Scrubbing Run I Electron Cloud Meeting #18,
SPS scrubbing run in 2014 H. Bartosik, G. Iadarola, G. Rumolo LHC Performance Workshop (Chamonix 2014), 22/9/2014 Many thanks to: G. Arduini, T. Argyropoulos,
Vacuum and Cryogenics observations for different bunch spacing J.M. Jimenez On behalf of CRG and VSC Groups with the contributions of G. Arduini, V. Baglin,
E-CLOUD VACUUM OBSERVATIONS AND FORECAST IN THE LHC Vacuum Surfaces Coatings Group 03/07/2011 G. Bregliozzi On behalf of VSC Group with the contributions.
1 Electron Cloud in LHC V. Baglin CERN AT-VAC, Geneva 1. Mecanism and Recipies 2. LHC Vacuum Chambers 3. Diagnostics 4. Conclusions Vincent Baglin Electron.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Giovanni Rumolo, G. Iadarola and O. Dominguez in LHC Beam Operation workshop - Evian 2011, 13 December 2011 For all LHC data shown (or referred to) in.
Electron Cloud Studies for Tevatron and Main Injector Xiaolong Zhang AD/Tevatron, Fermilab.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
LHC Scrubbing Runs Overview H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, M. Schenk, G. Arduini ABP information meeting 03/09/2015.
G. Rumolo, G. Iadarola, H. Bartosik, G. Arduini for CMAC#6, 16 August 2012 Many thanks to: V. Baglin, G. Bregliozzi, S. Claudet, O. Dominguez, J. Esteban-
Preliminary Simulation on Electron Cloud Build-up in SppC Liu Yu Dong.
07-JUL-2003LEADE / JW1 Satellite bunches in the LHC Satellite “definition” Satellite luminosity Satellite detection & tolerances J. Wenninger AB/OP.
SPS Scrubbing Runs 2014 week 45 and week 50 (part I) H. Bartosik, G. Iadarola, K. Li, L. Mether, G. Rumolo, M. Schenk Thanks to: SPS OP crew, G. Arduini,
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Simulations of fast-ion instability in ILC damping ring 12 April ECLOUD 07 workshop Eun-San Kim (KNU) Kazuhito Ohmi (KEK)
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
Improved electron cloud build-up simulations with PyECLOUD G. Iadarola (1),(2), G. Rumolo (1) (1) CERN, Geneva, Switzerland, (2) Università di Napoli “Federico.
LHC Scrubbing Runs J.M. Jimenez On behalf of the Electron Cloud Study Team, a Collaboration between AT and AB Departments.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
CERN, LIU-SPS ZS Review, 20/02/ Brief review on electron cloud simulations for the SPS electrostatic septum (ZS) G. Rumolo and G. Iadarola in LIU-SPS.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
Simulation of multipacting thresholds G. Iadarola and A. Romano on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, 8 September, 2015.
Vacuum Devices for accelerator studies Bernard HENRIST CERN TE dept. – Technology Department VSC group – Vacuum Surfaces and Coatings OLAV III Oak Ridge.
Electron cloud in the LHC: lessons learnt from 2015 experience with 25 ns beams G. Iadarola, H. Bartosik, K. Li, L. Mether, A.Romano, G. Rumolo, M. Schenk.
Heat load analysis for Inner Triplet and Stand Alone Modules H. Bartosik, J. Hulsmann, G. Iadarola and G. Rumolo LBOC meeting 28 October 2014 Based on.
Summary of the CERN-GSI Workshop on Electron Cloud G. Rumolo in ABP-ICE Meeting 16/03/2011.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
J.M. Jowett, S. Maury, PANIC05 HI Satellite meeting, 23/11/ LHC as a Heavy-Ion Collider An update John M. Jowett, Stephan Maury I-LHC Project CERN.
FCC-hh: First simulations of electron cloud build-up L. Mether, G. Iadarola, G. Rumolo FCC Design meeting.
Saturday 9 th April 10:24 Finally « 600 » bunches 14:30 Dump the 600 x :00 Loss maps Green light for 800 bunches 18:40 Fill for 800 bunches 20:48.
LIU-SPS e-cloud contribution to TDR Electron cloud meeting, 17/02/20141 o First draft by end of February Between 5 to 10 max pages per chapter, refer.
AEC’09 Session 1 Motivation, e-cloud Beam Observations & Simulations, Coating Requirements SPS ugrade plan, Elena Shaposhnikova Which SPS parts to be coated?
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 ELECTRON CLOUDS AND VACUUM EFFECTS IN THE SPS Experimental Program for 2004 J.M. Jimenez Thanks.
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
1 Electron clouds and vacuum pressure rise in RHIC Wolfram Fischer Thanks to M. Blaskiewicz, H. Huang, H.C. Hseuh, U. Iriso, S. Peggs, G. Rumolo, D. Trbojevic,
Comparison of stainless steel and enamel clearing electrodes E. Mahner, F. Caspers, T. Kroyer Acknowledgements to G. Arduini, H. Damerau, S. Hancock, B.
Simulation of the new PS EC detector: implementation and results A. Romano, G. Iadarola, G. Rumolo LIU-PS Student Day 20 April 2015.
Main Activities and News from LHC e-Cloud Simulations Frank Zimmermann ICE Meeting 8 June 2011.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
LHC Scrubbing Run 1 Day 3 (27/06/2015) Scrubbing team 28/06/2015.
200 MHz option for HL-LHC: e-cloud considerations (heat load aspects) G. Iadarola and G. Rumolo HLLHC WP2 meeting 03/05/2016 Many thanks to: K. Li, J.
Electron Cloud Studies at DAFNE Theo Demma INFN-LNF Frascati.
Progress and Plans for Main Injector beam Pipe Coatings Dave Capista Linda Valerio Project X Collabration Meeting WG3 MI/Recycler September 8, 2010.
Benchmarking Headtail with e-cloud observations with LHC 25ns beam H. Bartosik, W. Höfle, G. Iadarola, Y. Papaphilippou, G. Rumolo.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Vacuum Cleaning / Scrubbing measurements in the LHC J.M. Jimenez on behalf of G. Arduini, V. Baglin, G. Bregliozzi, P. Chiggiato, G. Lanza, OP.
Juan F. Esteban Müller P. Baudrenghien, T. Mastoridis, E. Shaposhnikova, D. Valuch IPAC’14 – Acknowledgements: T. Bohl, G. Iadarola, G. Rumolo,
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
Electron Cloud Effects
Beam Instability in High Energy Hadron Accelerators and its Challenge for SPPC Liu Yu Dong.
Joint LIU / HLLHC day -15 October 2015
Machine Coordinators: G. Arduini, J. Wenninger
Longitudinal beam parameters and stability
Electron cloud & vacuum pressure observations: 2011 proton run
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Scrubbing progress - 10/12/2012
Monday 24 October hours of 25ns MD
CINVESTAV – Campus Mérida Electron Cloud Effects in the LHC
Scrubbing progress - 08/12/2012
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Presentation transcript:

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists in doing things worst than what their can be, it uses to be much more efficient to find alternative solutions than trying suppressing the source… …Since the train already left the station… …How do we avoid the clouds ?

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 SPS shall be available for LHC injection but also for the CNGS (Neutrino) –After shutdowns, SPS will be operational after 5 days of beam conditioning –No signal in the field-free regions (long straight sections) –In the arcs (dipole field), electron cloud still “visible” –Strong vacuum cleaning (factor 100 in 4 days) –After periods without LHC-Type beams, upward drift of the SEY is not an issue since measurements confirmed that SEY recovered its initial value after 4 hours of operation with LHC beams –Beam conditioning efficiency limited to the parameters used during the scrubbing  will not be effective if running conditions become more favourable  SPS shall be used to improve the understanding of the electron cloud build up and induced instabilities and help in the benchmarking of the simulations  Keep operational the “Electron Cloud Bench”  Simulations shall be kept under pressure Future Needs and Future Directions Case of the SPS as the LHC Injector

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Case of the LHC (1) What is the maximum luminosity achievable at 75 ns / 25 ns bunch spacing assuming the cryogenic limitations ? Build up in dipole, quadrupole and field free regions  Why RHIC behave differently ? Are e - induced heat loads the only 1 st order limitations ? What about emittance growth and e-p instabilities since they limit PSR, KEKB and PEPII Beam conditioning efficiency on the cold surfaces in field free and dipole field  Dose effect required Beam conditioning time will increase in presence of: –Emittance growth and e-p instabilities –Pressure rises at collimators –Higher radiation levels and background unacceptable for Experiments Influence of the reduced bunch length in LHC versus SPS? –Detrimental effect of the ramp in energy Filling scheme modification more efficient than the decrease of the bunch intensity (displacement of the lateral strips in the dipoles) Simul.Simul. & Experim.Experim.Other Colours tell you the type of actions required: Simulations, Experiments, others

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Introduction SPS Running with LHC-type beams Decrease observed 4 th batch no captured correctly

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Main Results at 25 ns Bunch Spacing Detrimental effect of the ramp in Energy Pressure Variations Decrease observed RF adjustment

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Case of the LHC (2) …How reliable are the extrapolations from the SPS to the LHC ? –NEG coating behavior with seeding of electrons (photoelectrons) –Edge effects in the SPS when studying the beam conditioning (limited length) –Unexpected electron cloud enhancement or triggering in the LHC ? Consequences of the collimators halo –Are the electron build-up thresholds the same as for SPS ? –Bunch length Effect (0.25 instead of 1.7 ns rms at injection) –Filling pattern of the LHC Can Electron survive the LHC gaps (injection and dump kickers rise time 1-3  s) ? How to play with the filling pattern ? Simul.Simul. & Experim.Experim.Other