“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.

Slides:



Advertisements
Similar presentations
Overview of CAISO Stakeholder Process for FERC Order 764 Compliance Implementation of 15 minute scheduling and settlement Jim Price, CAISO Presentation.
Advertisements

Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
1 Regulatory Developments and Impacts Involving Electricity Storage in Texas Elizabeth Drews 31 st USAEE/IAEE North American Conference Austin TX, November.
©2012 | Commercial in Confidence | Proprietary to Ventyx, An ABB Company NYISO Real-time Market Presentation to ERCOT METF – April 26, 2012 Confidential.
Electricity Markets Overview Lo-Cal seminar, 09/21/2010.
SAWG Update to WMS February 4 th, 2015 Brandon Whittle.
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
1 Nodal Stabilization Market Call December 28, 2010.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
Lead from the front Texas Nodal Version EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Storage Integration – Look Ahead SCED Issues for ETWG CAES Perspectives Brandon Whittle ETWG Storage Workshop.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Market Evolution Program Day Ahead Market Project How the DSO Calculates Nodal Prices DAMWG October 20, 2003.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
1 Electricity System and Energy Market Basics David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
Regulation Energy Management Overview CPUC Energy Storage Workshop March 9, 2011.
ERCOT Public 1 Real-Time Co-optimization of Energy & Ancillary Services Operational Issues.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
1 Cutover Market Call December 01, :30 AM.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Photovoltaic and Storage Integration Workshop “Operational Issues” Kenneth Ragsdale October 15, 2012 ERCOT.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
Protocol Revision Subcommittee Sandy Morris December 1, 2011.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
March 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 1, 2014 TAC Update to RMS 1.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Lead from the front Texas Nodal 1 Texas Nodal EDS 3 Early Delivery System Plan TPTF April 02, 2007.
©2003 PJM North American Markets Status APEx Seoul, Korea October 29-31, 2006 Kenneth W. Laughlin.
ERCOT Public 1 Overview of ERCOT Concept Paper on Real-Time Co-optimization of Energy & Ancillary Services & Multi-Interval Real-Time Market.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
Cutover Update NATF 2 November Today’s Agenda Reminders Program Status 24 Hour LFC Test Update Cutover Update Soft Launch 2 November 2010NATF.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1 Nodal Stabilization Market Call December 27, 2010.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
CAISO Market Design Initiatives Update Donald Tretheway Senior Market Design and Policy Specialist CPUC Storage Proceeding January 14, 2013.
1 A Conversation about MISO Paul Spicer November 8, 2007.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
Real-Time Co-optimization of Energy & Ancillary Services
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
31st USAEE/IAEE North American Conference
30 Minute Reserves EPFSTF January 4,
Presentation transcript:

“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT

2 Presentation Outline December 2, 2011ERCOT Energy Storage Workshop Current Protocol Language. (Registration, Generic Caps, 1 hour test requirements …) [Projects initiated or identified]. Possible PUCT rule changes related to “Charging Energy”. (SPP and Meter Price calculations, wholesale transaction vs. retail transaction, exemption from Load allocated charges and AS Obligations). System Upgrades (Look-Ahead SCED). Pilot Programs. Next Steps.

3 Where We Are Today: December 2, 2011ERCOT Energy Storage Workshop Obligated to follow current Protocol language until changed. Near Term Registration: Decompose Storage Resource into a Load Resource and Generation Resource. Existing Generic Caps (Start-Up, Min Energy, EOC Caps for Make-Whole Calculations) [May need to submit Verifiable Costs]. Need Protocol changes and projects initiated. (Define Resource Categories in the Protocols and their Generic Values).

4 PUCT Rule Changes Under Consideration December 2, 2011ERCOT Energy Storage Workshop Possible PUCT rule changes related to “Charging Energy”. Potentially impacts SPP and Meter Price calculations, wholesale transaction vs. retail transaction, exemption from Load allocated charges and AS Obligations. Likely there will need to be protocol changes and system changes.

5 ERCOT Energy Storage Workshop December 2, 2011 FEATUREPJMMISONEISONYISOSPPCAISOERCOT Ancillary Service Co- Optimization Yes Both IT SCED and RT SCED Yes LOC/no AS offers Yes Both RTC and RTD Yes in RTUC No Ancillary Service Substitution Yes NoYes No Ancillary Service Ramping Limits Yes single values Yes single values Yes single values Yes single values Yes single values Yes single values No Ramp Rate Sharing Yes Partial and separate ASO YesNo Yes Partial/ Configurable Yes Partial/ configurable Yes Partial En/Reg Transmission Constraints Yes Zonal Yes Nodal Yes Zonal(?) Yes Nodal Yes Nodal Yes Nodal Yes Nodal Demand Response Yes Energy and reserve Price Responsive Demand bids Yes Energy and reserve Yes Energy and reserve Yes Energy and reserve Yes Energy and reserve Yes energy and reserve No Storage ResourcesYes DLR Regulation Yes DLR Regulation Yes DLR Regulation Yes DLR Regulation and Pump Storage Hydro Yes DLR Regulation Yes DLR Regulation and Pump Storage Hydro No Comparison of Real-Time Market Features

6 Main Components of “Look-Ahead SCED” December 2, The main components of “Look Ahead SCED” are: Real-Time Commitment (RTC) Application Real-Time Dispatch (RTD) Application 2.The Real-Time Commitment (RTC) Application executes every 15 minutes with a rolling window for up to two hours study period that is comprised of up to 7 time intervals of 15 minutes each. The outputs of RTC are: Commitment Instructions for Generation, Load and Energy Storage Resources. AS Awards and MCPC. (Note: If a decision is made that Non-Spin is ONLY from OFFLINE Resources, AS Co-optimization can be moved to RTD). 3.The Real-Time Dispatch (RTD) Application executes every 5 minutes with a rolling one hour window study period that is comprised of 12 time intervals of 5 minutes each. The outputs of RTD are: Dispatch Instructions (Energy MW Base points) for Generation, Load and Energy Storage Resources. LMP at all Settlement Points and Electrical Buses. ERCOT Energy Storage Workshop

7 Storage Functionality in “Look-Ahead SCED” December 2, 2011 See section 2.2 of the Look-Ahead SCED White Paper version 1.2 This can be found at: ookAheadSced_1128workshop.zip Storage Resource Participation a) Operational Characteristics b) Resource Registration c) Market Submission ERCOT Energy Storage Workshop

8 Moving Forward on “Look Ahead SCED” December 2, 2011 ERCOT Energy Storage Workshop PhaseTimelineFeature ImplementedComment Phase -1Summer 2012 Short-Term future Advisory/Indicative Base Points and LMPs using basic version of RTD. Will initially run in Open- Loop i.e outputs (Base Points, LMPs) are Advisory/Indicative. i.e. non-binding. Phase-2Summer 2013 Commitment for QSGR and Load Resources with intra-hour temporal constraints using basic version of RTC. Will initially run in Open- Loop i.e. outputs (Commitment instructions) are Advisory/Indicative. i.e. non-binding. Phase-3Spring 2014 Real-Time Ancillary Service and Energy Co-optimization using RTC. Phase-4Fall 2015Transmission constraints for future intervals

9 Moving Forward on “Look Ahead SCED” December 2, 2011 ERCOT Energy Storage Workshop

10 Pilot Programs December 2, 2011ERCOT Energy Storage Workshop PUCT rule is needed before a Pilot Program could begin. Considering a “technology neutral” Pilot Program for a new Ancillary Service (fast responding regulation service). Reviewing the FERC Final Rule (issued October 20, 2011) on “Frequency Regulation Compensation in the Organized Wholesale Power Markets. ( meet/2011/102011/E-28.pdf) meet/2011/102011/E-28.pdf Considering potentially compensating frequency regulation resources based on actual service provided and quantity of service provided. Pilot Programs “To Be Determined”.

11 Next Steps December 2, 2011ERCOT Energy Storage Workshop Write NPRRs to address Resource Categories and Generic Caps. Write NPRRs to reflect upcoming PUCT rules on “Charging Energy”. Provide input to Look-Ahead SCED development and associated NPRRs. (Jan 2012 through September 2012) Continue to investigate costs and benefits of potential Pilot Programs.

12 Questions December 2, 2011ERCOT Energy Storage Workshop