Assignment of NTS Entry Capacity – Questions relating to High level Business Rules Assignment Workstream, 7th April 2009.

Slides:



Advertisements
Similar presentations
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 July 2010.
Advertisements

Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Mod 485: CMP-LTUIOLI Progress Update 3 April 2014.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
GRI NW Investment Workshop Chris Logue, European Policy Manager, 4 th June 2010 The Hague.
Transfer & Trades Special Transmission Workstream
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Credit Arrangements During a Prolonged Emergency Mark Cockayne and Jayne McGlone 11 December 2006 Whilst all reasonable efforts have been made to verify.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Ofgem Open Letter – Next Steps Transmission Workstream
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Mod Clarifications Transmission Workstream 6 August 2009.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Moving the QSEC and AMSEC Auctions Update. 2  Presented proposal at October Workstream  Questions / suggestions received, mainly around  Over & Under.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
Assignment of NTS Entry Capacity Transmission Workstream 02 July 2009.
Supply Assumptions for Investment Planning Transmission Planning Code Workshop 1 3rd April 2008.
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Proposal to adjust investment lead times Transmission Workstream 4 th May 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity transfers in the constrained period Transmission Workstream 5 th October 2006.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
Initial Thoughts on Timeline for Entry Capacity Substitution Draft for discussion purposes only.
Assignment of NTS Entry Capacity Review Group 221, 10th December 2008.
Force Majeure Existing FM situation: Up to 200GWh/d capacity shortfall due to the rejection of NG’s planning application for a PRI in Corse / Tirley area.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
Shipper Termination Rules
Transmission Workstream, 6 August
Removal of a Users ability to allow Quarterly NTS Entry Capacity to lapse Chris Shanley.
Capacity Methodology Statements: Impact of Mod 452
Assignment Workshop 2 16th September 09, Solihull.
0332 – Impact of combining the Entry and Exit Capacity credit processes Chris Shanley.
Assignment of NTS Entry Capacity – Background and UNC Obligations
UNC Modification Proposal 0201 National Grid Distribution
QSEC auction timetable
MOD Deemed applications – User pays initial thoughts.
Transmission Workstream – Partial Assignment
Review of Trade and Transfer Winter 09/10
Mod 230: QSEC and AMSEC Timings
Information Provision for Transitional Exit Capacity
Review: Entry Capacity Transfer and Trade Methodology Statement
Incremental Entry Capacity Release Methodology Statement
Review Group Action November 2008.
Assignment of NTS Entry Capacity – Work currently being Undertaken
Assignment of NTS Entry Capacity – Previous Work Undertaken
Exit Overruns in the Enduring Regime
Gemini Contingency Guidelines
Transmission Workstream 05 November 2009
Presentation transcript:

Assignment of NTS Entry Capacity – Questions relating to High level Business Rules Assignment Workstream, 7th April 2009

2 Questions to consider re High Level Business Rules National Grid NTS has a number of questions that it believes the Industry will need to consider to move Assignment forward, primarily :  whether applies only to QSEC only or is to also include AMSEC?  whether NTS Entry Capacity can assigned to multiple parties?  whether the duration of the NTS Entry Capacity assigned is on an enduring basis or is to be driven by the assigning User?  at what level should the notice period be set at i.e. 10 business days, 1 month etc

3 Issues to be considered There are also a number of issues that National Grid NTS believes should be considered by the Industry:  how will NTS Entry Capacity Trades, Options, Forwards etc be managed i.e. will they be included as part of an assignment?  what will be the implications for Credit Management?  how frequently will an NTS entry Capacity Assignment process be used?  what are the priorities i.e. complexity, frequency of use, cost etc