Model load frequency Discussion John Adams January 5, 2010 Nodal Advisory Task Force.

Slides:



Advertisements
Similar presentations
Overview of ERCOT Outage Coordination Woody Rickerson Director Grid Coordination January 2015.
Advertisements

11/08/2005 Ken Donohoo How Does NMMS meet the Nodal Protocol Requirements John Adams 3/23/2006.
1Texas Nodal Texas Nodal CRR Annual Model Discussion DRAFT By John Moseley, ERCOT.
January 8, 2009 TAC Texas Nodal Program Implementation: P rogram Update Ron Hinsley.
9/14/2015 IEEE Presentation Time-Based Management of Large Scale Network Models John Moseley P.E. Lead Network Model Engineer.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
03/22/07 TPTF meeting ICCP Quality Codes Bill Blevins/Frank Kendall.
Lead from the front Texas Nodal 1 Resource Entity Owned Transmission Asset Data Collection Feb 27, 2009 Kick Off Meeting.
NPRR 365 Change in Resource Outage Approvals from 8 to 45 or 90 Days Woody Rickerson Director Grid Coordination
ROS Feb 2006 The Model Curtis Crews Network Model Engineering Supervisor
1 Single Entry Model (SEM) Go-Live Update ROS Update July 16, 2009.
Lead from the front Texas Nodal 1 External Web Services Update Nodal Implementation Team Presentation July 7, 2009.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
1Texas Nodal Texas Nodal Market Trials and Data Verification ROS Meeting By Steve Grendel, ERCOT Thursday, 01/11/2007.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
SIMPLE TRANSMISSION OUTAGE. Nodal Protocol Definition 2.26 Simple Transmission Outage A Planned Outage or Maintenance Outage of any Transmission Element.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
Texas Nodal March Texas Nodal NMMS Requirements By John Adams ERCOT.
TPTF CIM Health Check Raj Chudgar Program Director for Market Redesign.
March 11, 2008 Texas Nodal Market Redesign Program Commercial Operations Subcommittee.
1Texas Nodal Market Trials Update. 2Texas Nodal LFC Testing Review Review of materials presented at TAC Changes in Market Trials schedule and activities.
January 15, 2008 Monthly Board of Directors Meeting Texas Nodal Market Implementation Program Update Jerry Sullivan.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
MIG TF Voting Items Market Participant Notification Period (Transmission outage) – =1 Year Interconnection Date for Protocol Considerations – First Interconnection.
1 Market Trials Update NATF June 1, 2010.
Reconfiguring Nodal Stakeholder Participation Presentation to the ERCOT Technical Advisory Committee Texas Nodal Transition Planning Task Force February.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
Network Model Management System (NMMS)
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
1Texas Nodal Texas Nodal NMMS/RARF Data Discussion By John Moseley, ERCOT, Network Modeling Group.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
Congestion Revenue Rights 1 Texas Nodal Market Implementation Program CRR Requirements Updates CRR Project Team – Presented by Beth.
1 Market Trials Outage Scheduling Weekly Update August 20, 2010.
TPTF CIM Health Check Raj Chudgar Program Director for Market Redesign.
CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1.
ERCOT Guideline for Interim Updates to the Network Operations Model Excerpted from the “Modeling Expectations” whitepaper D.W. Rickerson.
Stability Limit Management Chad Thompson Manager, Operations Support Planning Working Group Meeting ERCOT Public January 20, 2016.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
Scheduling and Operating Transmission Devices in the Nodal Environment.
Nodal Readiness Plan Update Ron Hinsley Update for TAC November 3, 2005.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
Lead from the front Texas Nodal 1 Texas Nodal EDS Market Trials Approach Wednesday, November 29, 2006.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Retail Workshop ERCOT Nodal Update October 06, 2010.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Network Operations Model Go-Live Decision Kenneth Ragsdale TAC July 1, 2010.
Text reason for Deviation from Defined High Sustained Limit/Low Sustained Limit John Adams January 5, 2010 Nodal Advisory Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
June 5, 2008 TAC Texas Nodal Market Implementation Program Update Jerry Sullivan.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
1 Market Trials Update NATF January 5, 2010.
6/21/2007 TPTF: Baselines 1&2 WP and CI Baselines 1 and 2 White Papers and Change Items Diran Obadina.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
August 11, 2008 TPTF Early Delivery Systems Status Daryl Cote.
The Texas Nodal Market Trip Doggett ERCOT Interim President and Chief Executive Officer Mike Cleary ERCOT Chief Technology Officer Executive Briefing 28.
TAC Update Kyle Patrick. 2 Nodal ERCOT Program Update –Nodal Market Go-Live (Vote)- vote passed in which TAC certified full nodal systems for Dec 1, 2010.
EDS 2 Early Delivery Systems Approach March 2007.
Nodal Planning Go Live Austin, TX February 3, 2011
ME 3.0 to ME 5.0 ME3.0 review scheduled during the Joint NDSWG/NATF meeting in July. There were approximately 180 comments on the ME3.0 paper. Deadline.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Nodal RTM Settlement Timeline Snapshot Timing for Load and Gen Data (Follow-Up) Mandy Bauld COPS November 10, 2009.
Protocol Revision Subcommittee
2011 Prioritization Update to Market Subcommittees
Load Distribution Factor Calculation for Market Applications and Studies a Presentation for NATF 9/21/ NATF 1 Texas Nodal.
Transmission Outage Coordination
September Protocol Transition Plan
CEO Report Thomas F. Schrader ERCOT Board of Directors May 17, 2005
Time-Based Management of Large Scale Network Models
Presentation transcript:

Model load frequency Discussion John Adams January 5, 2010 Nodal Advisory Task Force

2 What issues are we trying to address? Risks –Visits to CAISO and MISO have revealed that they believe ERCOT has underestimated the difficulties of supporting a Nodal Network model change because of its impact upon markets. Each of these markets load their market database once/quarter. –In the past, there was much less financial risk due to model errors, because prices were only influenced around 4 interfaces. W-N, N-S, N-H, S-H. –With Nodal; a model error anywhere in the system financially affects CRR holders, participants in the DAM, and participants in the Real time market. –Historically; ERCOT has encountered errors in network model loads, even after testing. Nodal Advisory Task ForceJanuary 5, 2010 ERCOT had considered supporting daily database loads in its Nodal design, and can support CIM case production at this periodicity. However, downstream acceptance of database loads at this interval is proving problematic.

3 What issues are we trying to address? Process challenges: –In the past (zonal) it has taken ERCOT ~3 days to validate and load a database. –With nodal; ERCOT needs to add additional processes to examine market impacts of database loads. –Additional time between database loads adds complexity and risk to TSP’s processes. Program constraints: –Supporting daily database loads, combined with multi-day validation, may require multiple parallel validation and load infrastructures. The nodal program has not planned, specified or built such infrastructure. –ERCOT has not yet achieved a 3 day validation/load process in nodal Nodal Advisory Task ForceJanuary 5, 2010

4 What issue are we trying to address? Protocol Requirements Timeline for Network Operations Model Change Requests (1)ERCOT shall perform periodic updates to the ERCOT Network Operations Model. Market Participants may provide Network Operations Model updates to ERCOT to implement planned transmission and Resource construction one year before the required submittal date below. TSPs and Resource Entities must timely submit Network Operations Model changes pursuant to the schedule in this Section to be included in the updates... 3)TSPs and Resource Entities shall submit Network Operations Model updates at least three months prior to the physical equipment change. ERCOT shall update the Network Operations Model according to the following table: Nodal Advisory Task ForceJanuary 5, 2010

5 Nodal Advisory Task Force Difficulties imposed on Transmission Operators by infrequent database changes If models are loaded only 10 times/year; the ability of TSP’s to model changes on the day they expect them to be energized will be limited. –TSP’s may schedule energization of new equipment to match ERCOT’s schedule or –TSP’s may submit Network Operations Model Change Requests (NOMCR’s) to install equipment early, and simultaneously enter outage schedules to take this equipment out of service. –Under some circumstances, when equipment is re-used for different topology; it will be impossible to model outages on the equipment during the construction process without interfering with accurate representation of interim topology. In these cases the absence of frequent model loads could require the introduction of non-existent switches to the model to produce accurate results. Management of these Pseudo switches is difficult. January 5, 2010

6 Nodal Advisory Task ForceJanuary 5, 2010 What should drive this decision At this point; ERCOT does not fully understand the relationship between complexity, effort, days between loads, and data integrity

7 Nodal Advisory Task Force ERCOT trying to achieve a Nodal market load schedule of 2 database loads/month in our test program. This is a compromise between the Nodal protocol requirement of 10 Database loads/year; and the original proposal of daily. ERCOT will develop further experience during 2010 with our model load process; and will report upon our progress in improving that process. In the absence of daily model loads; ERCOT is proposing we discuss rules specifying the following: 1.How we will model/manage Pseudo devices if needed (Current protocols only allow TSP’s to create pseudo devices) 2.If TSPs will provide telemetry for Pseudo devices. (Current protocols required all switching devices to be telemetered) 3.How pseudo devices shall be managed for CRR, DAM, etc. 4.Modifying the restrictions on Remedial Switching Actions to make it like the current Equipment Status Change January 5, 2010 Current Status

8 Next Steps ERCOT –Continue to report to the market on the progress and support of the database load and timing process. –Propose business processes and timing for participant discussion. Market Participants –Facilitate feedback from Market Participants via NATF regarding development of a database load business process which minimizes risk and complexity for the entire participant base. Nodal Advisory Task ForceJanuary 5, 2010