Managing the Costs of New Developments Initial Proposals on Transmission System Operator Internal Costs from 1 st April 2007 Update from National Grid.

Slides:



Advertisements
Similar presentations
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Advertisements

Review of industry code governance 26 March 2010.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Recommendation for Board approval of updated nodal fee filing Steve Byone Overview –Historical summary –Highlights from approved interim Nodal Surcharge.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
2 nd National Energy Efficiency Strategy Review EELN Consultation Workshop 24 April
Code Administrator's Working Group Duncan Burt CUSC and Grid Code.
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Total xoserve income £(a)m (ASA services – includes element for transporter funded changet) Transporter funded change budget built into service charge.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Environmental Standing Group. 2 Background  Ofgem issued an open letter on 15 th April 2008 to consider issues associated with carbon assessment for.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Proposal on Revised Mechanism of Selecting Applications for Approval Presentation by Secretariat of Council for the AIDS Trust Fund in Sharing Session.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Project Nexus : Funding Arrangements Joel Martin - 30 April 2009.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Credit Cover Seminar The Proposed Way Forward Peter Bucks 25 April 2003.
Network Flexibility Mike Wassell Transmission workstream, January
Transitional Exit Capacity Proposals -Update Offtake Agreement Workstream, 30 Nov 05 Dave Adlam.
Industry Dialogue on xoserve Services 14 th September 2007.
Presentations by local experts on some issues identified in the local finance analysis Issues identified in Municipalities of Shkodra, Lezha and Durrës.
European Developments Transmission Workgroup 3 rd May 2012.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
7 December 2006 Ritchard Hewitt
CUSC Panel – 19th July 2016 Binoy dharsi
CMP277 ‘Special License Condition 4J’ CMP278 ‘BSIS 2017 Housekeeping’
Modification Proposal 0283 Update
Grid Code What is the Standard Modification Process? Panel
Code Governance Review UNC Modification Proposals
RIIO-GD1:network charging volatility
SO Incentives Consultation
Transmission Workgroup 4th October 2012
Transmission Planning Code
SO Incentives from April 2010
CAP190: Workgroup Report CUSC Modifications Panel, 26th August 2011
UNC Trader User – Licence obligations
Gas SO Incentives from April 2010
Indicative PRIDe Project Plan
MIS Development – DSC Change Management Committee update
NTS Entry Charging Review Update
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
Discussion on Mod262 and next steps
PARCA Security and Termination Amounts
Exit Capacity Substitution and Revision
Rebecca Hailes For 15 March 2018
Development of Entry Capacity Substitution
Draft Mod: Update of default System Marginal Prices
UNC Transmission Workstream 7th December 2006
Transmission Workstream 2nd December 2010
Mark Freeman 29th January 2007
Ofgem presentation to Gas Transmission Workstream
Incremental Entry Capacity Release Methodology Statement
Gas Customer Forum 28 July 2008
Presentation transcript:

Managing the Costs of New Developments Initial Proposals on Transmission System Operator Internal Costs from 1 st April 2007 Update from National Grid – Transmission (17 December 2006)

Managing the costs of New Developments  Ofgem’s Initial Proposals for NGG (transmission) and NGET System Operator Incentives from 1 st April 2007 were published on 5 th December  these include proposed allowances for Transmission System Operator Internal Costs  the allowances are based on Ofgem’s review of National Grid’s business plan, provided as part of the Transmission Price Control Review (TPCR)  The consultation (question 14 in both sections 2 & 3) also seeks views on  whether to handle new industry development costs via National Grid’s proposal or  via the existing Income Adjusting Event (IAE) provisions The deadline for responses is 16 th January 2007

Why have National Grid proposed a new mechanism?  Significant industry developments are anticipated over the next transmission price control period (2007/08 to 2011/12) which will impact on National Grid’s processes  some changes are known but un-scoped,  many are not yet even envisaged, and  their overall implementation cost is unknown at this time  We have not included these costs in our baseline expenditure plans and allowances because  this approach does not properly align to the industries interest to efficiently develop the commercial framework  the uncertainty would have required us to include a large risk margin  We believe that improved assurance of efficiency in development costs can be provided through  enhanced, regular cost and progress reporting  use of Industry Panel expertise  building a regular, systematic process for the review and recovery of necessary costs

What does it involve?  National Grid will continue to provide forecasts of its costs to implement modification proposals but clearly identifying the incremental costs beyond our base allowance  These forecasts will be taken into account by the relevant working group or panel in developing its recommendations  We will report the forecast costs regularly and then report final actual costs on completion of work  Subject to approval, and materiality tests, we would recover the incremental costs incurred via a term in our internal incentives  The costs, and working group or panel assessment of them, can be factored into Ofgem’s efficiency assessment at the next price review

What does it involve?  The baseline SO allowances include £0.25m for electricity and £0.25m for gas  Our reporting will monitor the cumulative spend for electricity and gas each year, including approved changes and those being assessed  This will help the industry working groups and panels to monitor how much market-driven change is being progressed and proposed.  If the spend exceeds any baseline allowance, then this will be fed into the incentive charges for the following year.

We think that adoption of this proposal is essential to our continued positive contribution to industry development. It will provide improved transparency of National Grid’s expenditure on behalf of the industry clearer accountability for and to industry panels and working groups flexibility to fund, and plan for, industry development We believe continued industry development is foreseeable and so the costs should be managed through a regular systematic process Income Adjusting Events are a means of catering for exceptional events and thus it is not the most appropriate way of dealing with this issue – we should be implementing a simple new process focussed on routine industry decision making. Next Steps  The Transmission System Operator Initial Proposal consultation closes on 16 th January 2007 and we would urge you to consider our proposal and respond positively to the consultation  National Grid’s response will follow these lines If you have any comments or want more information contact National Grid’s panel representative or Kevin Broadbent ( )