Update on TCTP heating H. Day, B. Salvant Acknowledgments: L. Gentini and the EN-MME team.

Slides:



Advertisements
Similar presentations
ENEN RF-induced heating on TCTP ferrite: comparison between different support materials F. Carra, A. Bertarelli, A. Dallocchio, M. Garlasche’,
Advertisements

Helmholtz International Center for Oliver Boine-Frankenheim GSI mbH and TU Darmstadt/TEMF FAIR accelerator theory (FAIR-AT) division Helmholtz International.
Impedance of SPS travelling wave cavities (200 MHz) A. Grudiev, E. Métral, B. Salvant, E. Shaposhnikova, B. Spataro Acknowledgments: Erk Jensen, Eric Montesinos,
Update on SPS BPM impedance B. Salvant for the 2008 impedance team.
Pre-isolator Update 18 th MDI Meeting F. Ramos, A. Gaddi, H. Gerwig, N. Siegrist December 17, 2010.
Simulations and measurements of the pre-isolator test set-up WG5 Meeting F. Ramos, A. Gaddi, H. Gerwig, N. Siegrist November 9, 2010.
Impedance of new ALICE beam pipe Benoit Salvant, Rainer Wanzenberg and Olga Zagorodnova Acknowledgments: Elias Metral, Nicolas Mounet, Mark Gallilee, Arturo.
Engineering Department ENEN Choice of the material for TCTP ferrite supports Collimation Working Group F. Carra, G. Cattenoz, A. Bertarelli,
Particle Studio simulations of the resistive wall impedance of copper cylindrical and rectangular beam pipes C. Zannini E. Metral, G. Rumolo, B. Salvant.
TDI longitudinal impedance simulation with CST PS A.Grudiev 20/03/2012.
RFQ Thermal Analysis Scott Lawrie. Vacuum Pump Flange Vacuum Flange Coolant Manifold Cooling Pockets Milled Into Vanes Potentially Bolted Together Tuner.
Impedance aspects of Crab cavities R. Calaga, N. Mounet, B. Salvant, E. Shaposhnikova Many thanks to F. Galleazzi, E. Metral, A. Mc Pherson, C. Zannini.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
Acknowledgements F. Caspers, H. Damerau, M. Hourican, S.Gilardoni, M. Giovannozzi, E. Métral, M. Migliorati, B. Salvant Dummy septum impedance measurements.
Studies of impedance effects for a composite beam pipe for the experimental areas Request from M. Galilee, G. Schneider (TE/VSC)
704MHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL July 8, 2015 LEReC Warm Cavity Review Meeting  July 8, 2015.
Update of the SPS transverse impedance model Benoit for the impedance team.
Update on BGV impedance studies Alexej Grudiev, Berengere Luthi, Benoit Salvant for the impedance team Many thanks to Bernd Dehning, Massimiliano Ferro-Luzzi,
Electron Model for a 3-10 GeV, NFFAG Proton Driver G H Rees, RAL.
Update on wire scanner impedance studies
Simulation of trapped modes in LHC collimator A.Grudiev.
Review 09/2010 page RF System for Electron Collider Ring Haipeng Wang for the team of R. Rimmer and F. Marhauser, SRF Institute and Y. Zhang, G. Krafft.
First results of calculation of wakefields for the LHCb experimental chamber. Rainer Wanzenberg, Olga Zagorodnova Desy Hamburg February 2, 2015.
Trapped Modes in LHC Collimator (II) Liling Xiao Advanced Computations Department SLAC National Accelerator Laboratory.
News and hot topics Impedance meeting 14/04/2014.
Update on new triplet beam screen impedance B. Salvant, N. Wang, C. Zannini 7 th December 2015 Acknowledgments: N. Biancacci, R. de Maria, E. Métral, N.
TESLA DAMPING RING RF DEFLECTORS DESIGN F.Marcellini & D. Alesini.
August 21st 2013 BE-ABP Bérengère Lüthi – Summer Student 2013
Longitudinal impedance of new RF fingers O. Berrig, C. Garion, B. Salvant.
Reminder on longitudinal modes of the SPS BPMs and ZS pumping ports Benoit Salvant for the impedance team.
200 MHz option for HL-LHC: e-cloud considerations (heat load aspects) G. Iadarola and G. Rumolo HLLHC WP2 meeting 03/05/2016 Many thanks to: K. Li, J.
Update on the TDI impedance simulations and RF heating for HL- LHC beams Alexej Grudiev on behalf of the impedance team TDI re-design meeting 30/10/2012.
Impedance of current TCP compared to new TCP with button.
General – mode matching for transverse impedance being compared with CST and infinitely long pipes (Nicolo) – Carlo found a way to disentangle direct space.
Geometric Impedance of LHC Collimators O. Frasciello, S. Tomassini, M. Zobov LNF-INFN Frascati, Italy With contributions and help of N.Mounet (CERN), A.Grudiev.
High Bandwidth Damper System: kicker impedance
F. Caspers, A. Grudiev, E. Métral, B. Salvant
Interpretation of resonant wire measurements on the TCSPM
Outcome of recent impedance bench measurements on collimators
Finemet cavity impedance studies
A 2.3 GHz BANDWIDTH STRUCTURE FOR CLIC_DDS
Update on HL-LHC triplet fingers
Benoit Salvant, Kyrre Sjobak, Christine Vollinger, Na Wang
Update on the impedance studies of the SPS wirescanners
HOM power in FCC-ee cavities
CST simulations of VMTSA
Impedance working group update
Dummy septum impedance measurements
E. Métral, N. Mounet and B. Salvant
TCTP the CST side F. Caspers, H. Day, A. Grudiev, E. Metral, B. Salvant Acknowledgments: R. Assmann, A. Dallocchio, L. Gentini, C. Zannini Impedance Meeting.
News Request to install SLAC collimator in SPS
¼ meshed models for Omega3P calculations
Simulation of trapped modes in LHC collimator
NEWS ABOUT COLLIMATOR IMPEDANCE
Impedance working group update 21st August 2013
TCLIA/TCTV broad band transverse impedance
CEPC Main Ring Cavity Design with HOM Couplers
Longitudinal Impedance Studies of VMTSA
Simulations and RF Measurements of SPS Beam Position Monitors (BPV and BPH) G. Arduini, C. Boccard, R. Calaga, F. Caspers, A. Grudiev, E. Metral, F. Roncarolo,
HBP impedance calculations
Collimator design with BPMs (TCTP)
Status of the EM simulations and modeling of ferrite loaded kickers
Multiphysics simulations of impedance effects in accelerators
TCLIA/TCTV transverse BB impedance versus gap size
Impedance working group update 07th August 2013
EM Simulation of wakes in BSRT beampipe with extraction mirror
Update of the heating of ALFA detector in 2011
Origin of TCLIA/TCTV transverse BB impedance
Two beam coupling impedance simulations
TCLIA/TCTV transverse BB impedance versus gap size
Presentation transcript:

Update on TCTP heating H. Day, B. Salvant Acknowledgments: L. Gentini and the EN-MME team

Context Presentation at the collimation working group in March 2012 Long-standing action for the impedance team, needed to wait for: – the eigenmode solver with dispersive material – Indication that the simulations are relevant (very important for a complicated geometry such as the TCTP)

PhD thesis of Hugo Day (2013) Ferrite considered was 8C11 at the time

Simulations of longitudinal impedance Very heavy simplifications from the initial CATIA file from Luca Gentini In particular, RF fingers at entry and exit needed to be replaced by a sheet, and was anyway badly meshed. Angle of the RF fingers adapted to the jaw position in order to keep contact, however can be different for the real collimator 1.7 M mesh cells All materials perfect conductors, except the ferrite, in order to get rid of the resistive wall losses from the jaw Of course, there is uncertainty on ferrite parameters Half gap scanned between 1mm and 10 mm

Additional assumptions Impedance which will heat the ferrite should be broadband Need to suppress the losses from the resistive wall  use perfect conductor everywhere except for ferrite and assume that superposition is possible.

Simulations of longitudinal impedance Frequency in GHz Longitudinal Impedance in Ohm 1 mm 10 mm Half gap= 1mm Half gap= 10mm  Opening the gap leads to an increase of the amplitude of broad modes  More heating to ferrrite with gap open  Of course, this is not true for resistive wall heating to the jaws

Superposition of beam spectrum with impedance (50 ns beam) Power contribution in W Frequency in Hz  Main contribution from the broad peaks around 500 MHz, peaks beyond 1 GHz only significant for the Gaussian distribution

Superposition of beam spectrum with impedance (25 ns beam) Power contribution in W Frequency in Hz

Power loss (post-LS1, 25 ns, bunch length = 7.5 cm)  50% to 100% of this heat load goes to the two lines of ferrite

Power loss (post-LS1, 25 ns, bunch length = 9 cm)  50% to 100% of this heat load goes to the two lines of ferrite

Power loss vs gap (post-LS1, 50 ns)  50% to 100% of this heat load goes to the two lines of ferrite

Power loss vs gap (HL-LHC, 50 ns)  50% to 100% of this heat load goes to the two lines of ferrite

Power loss vs gap (HL-LHC, 25 ns)  50% to 100% of this heat load goes to the two lines of ferrite

Summary Heat load to the ferrite can reach of the order of 5 W per side Opening the gap increases the heat load After LS1, with standard bunch length of 9 cm, we expect on the order of 1 W in the ferrite per side