Statistical Process Control Dr. Mohamed Riyazh Khan DoMS.

Slides:



Advertisements
Similar presentations
Control Charts for Variables
Advertisements

Operations Management Statistical Process Control Supplement 6
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Process.
Chapter 9A. Process Capability & Statistical Quality Control
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 15 Statistical Quality Control.
1 DSCI 3123 Statistical Process Control Take periodic samples from a process Plot the sample points on a control chart Determine if the process is within.
Statistical Process Control Processes that are not in a state of statistical control show excessive variations or exhibit variations that change with time.
Statistical Process Control Used to determine whether the output of a process conforms to product or service specifications. We use control charts to detect.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Process.
BMM 3633 Industrial Engineering
Statistical Process Control Operations Management - 5 th Edition Chapter 4 Roberta Russell & Bernard W. Taylor, III.
Statistical Process Control. 4-2 Lecture Outline  Basics of Statistical Process Control  Control Charts  Control Charts for Attributes  Control Charts.
Quality Control Pertemuan 12 Mata kuliah: J Manajemen Operasional Tahun: 2010.
BPT2423 – STATISTICAL PROCESS CONTROL
Statistical Process Control. Overview Variation Control charts – R charts – X-bar charts – P charts.
Adeyl Khan, Faculty, BBA, NSU Quality Control Adeyl Khan, Faculty, BBA, NSU Phases of Quality Assurance 10-2 Figure 10.1 Acceptance sampling Process.
Agenda Review homework Lecture/discussion Week 10 assignment
Chapter 10 Quality Control McGraw-Hill/Irwin
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.
Statistical Process Control A. A. Elimam A. A. Elimam.
J0444 OPERATION MANAGEMENT SPC Pert 11 Universitas Bina Nusantara.
1 © The McGraw-Hill Companies, Inc., 2004 Technical Note 7 Process Capability and Statistical Quality Control.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Quality Control.
8-1 Quality Improvement and Statistics Definitions of Quality Quality means fitness for use - quality of design - quality of conformance Quality is.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Statistical Process Control OPIM.
MIM 558 Comparative Operations Management Dr. Alan Raedels, C.P.M.
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
Control Charts are tools for tracking variation based on the principles of probability and statistics SPC: Statistical Process Control.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e KR: Chapter 7 Statistical Process Control.
/k Variation thinking 2WS02 Industrial Statistics A. Di Bucchianico.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 6 th Edition.
Quality Control.
Quality and Education Business has made progress toward quality over the past several years. But I don’t believe we can truly make quality a way of life.
Statistical Quality Control/Statistical Process Control
10-1Quality Control William J. Stevenson Operations Management 8 th edition.
Statistical Process Control
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 17-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 17.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 IES 303 Chapter 5: Process Performance and Quality Objectives: Understand.
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 8 Process Capability and Statistical Quality Control.
Statistical Process Control Chapters A B C D E F G H.
© 2003 Prentice-Hall, Inc.Chap 13-1 Business Statistics: A First Course (3 rd Edition) Chapter 13 Statistical Applications in Quality and Productivity.
Business Processes Sales Order Management Aggregate Planning Master Scheduling Production Activity Control Quality Control Distribution Mngt. © 2001 Victor.
To accompany Quantitative Analysis for Management, 9e by Render/Stair/Hanna 17-1 © 2006 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 17.
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Statistical Process Control (SPC)
Operations Management
Managing Quality CHAPTER SIX McGraw-Hill/Irwin Statistical Process control.
Statistical Process Control
Statistical Quality Control/Statistical Process Control
Copyright 2009, John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.
Statistical Quality Control
Statistical Process Control Chapter 4. Chapter Outline Foundations of quality control Product launch and quality control activities Quality measures and.
Statistical Process Control. Overview Variation Control charts – R charts – X-bar charts – P charts.
1 © The McGraw-Hill Companies, Inc., Technical Note 7 Process Capability and Statistical Quality Control.
CHAPTER 7 STATISTICAL PROCESS CONTROL. THE CONCEPT The application of statistical techniques to determine whether the output of a process conforms to.
1 SMU EMIS 7364 NTU TO-570-N Control Charts Basic Concepts and Mathematical Basis Updated: 3/2/04 Statistical Quality Control Dr. Jerrell T. Stracener,
Quality Control Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Process Capability and Statistical Quality Control.
MOS 3330 Operations Management Professor Burjaw Fall/Winter
Unit-3 Control chart Presented by N.vigneshwari. Today’s topic  Control chart.
Statistical Process Control (SPC)
Statistics for Managers Using Microsoft Excel 3rd Edition
10 Quality Control.
Agenda Review homework Lecture/discussion Week 10 assignment
Statistical Process Control
Process Capability.
Statistical Quality Control
Presentation transcript:

Statistical Process Control Dr. Mohamed Riyazh Khan DoMS

SQC S.Q.C. means planned collection and effective use of data for studying causes of variations in quality either as between processes, procedures, materials, machines, etc., or over periods of time. The main purpose of Statistical Quality control is to determine statistical techniques which would help us in separating the assignable causes from the chance causes, thus enabling us to take immediate remedial action whenever assignable causes are present A production process is said to be in a state of statistical control, if it is governed by chance causes alone, in the absence of assignable causes of variation.

Two Primary Topics in Statistical Quality Control Statistical process control (SPC) is a statistical method using control charts to check a production process - prevent poor quality. In TQM all workers are trained in SPC methods.

Two Primary Topics in Statistical Quality Control Acceptance Sampling involves inspecting a sample of product. If sample fails reject the entire product - identifies the products to throw away or rework. Contradicts the philosophy of TQM. Why ?

Inspection Traditional Role: at the beginning and end of the production process n Relieves Operator from the responsibility of detecting defectives & quality problems n It was the inspection's job In TQM, inspection is part of the process & it is the operator’s job Customers may require independent inspections

How Much to Inspect? Complete or 100 % Inspection. – Viable for products that can cause safety problems – Does not guarantee catching all defectives – Too expensive for most cases Inspection by Sampling – Sample size : representative – A must in destructive testing (e.g... Tasting food)

Where To Inspect ? In TQM, inspection occurs throughout the production process IN TQM, the operator is the inspector Locate inspection where it has the most effect (e.g.... prior to costly or irreversible operation) Early detection avoids waste of more resources

Quality Testing Destructive Testing – Product cannot be used after testing (e.g.. taste or breaking item) – Sample testing – Could be costly Non-Destructive Testing – Product is usable after testing – 100% or sampling

Quality Measures:Attributes – Attribute is a qualitative measure – Product characteristics such as color, taste, smell or surface texture – Simple and can be evaluated with a discrete response (good/bad, yes/no) – Large sample size (100’s)

Quality Measures:Variables – A quantitative measure of a product characteristic such as weight, length, etc. – Small sample size (2-20) – Requires skilled workers

Variation & Process Control Charts Variation always exists Two Types of Variation – Causal: can be attributed to a cause. If we know the cause we can eliminate it. – Random: Cannot be explained by a cause. An act of nature - need to accept it. Process control charts are designed to detect causal variations

Variation in the quality of manufactured product in the repetitive process in industry is inevitable. The variations may be classified as being due to two causes: Chance Causes Assignable causes

Chance Causes Some “stable pattern of variation” or “ a constant cause system” is inherent in any particular scheme of production and inspection. The variation due to these causes is beyond the circumstances.

Assignable Causes This type of variation is attributed to any production process is due to non-random or assignable causes and is termed as preventive variation.. These causes may be the result of multiplicity of factors such as defective or substandard raw material, new operation, improper setting and wrong handling of machine, mechanical defects etc. These causes can be identified and eliminated and are to be discovered in a production process before it goes wrong.

Advantages of quality control in industry Planned collection of data, analysis and interpretation Improvement in quality Reduction in cost per unit Reduction in scrap Saving in excess use of materials Removing production bottlenecks Reduction in inspection Evaluation of scientific tolerances Maintenance of operating efficiency Quality consciousness Greater customer satisfaction Enhanced productivity

Control Charts: Definition & Types A control chart is a graph that builds the control limits of a process Control limits are the upper and lower bands of a control chart Types of Charts: – Measurement by Variables: X-bar and R charts – Measurement by Attributes: p and c

Control Chart Control Chart for Variables Control Chart for Attributes

Control Chart for Variables For a characteristic which can be measured quantitatively. Many quality characteristics of a product are measurable and can be expressed in specific units of measurement such as diameter of a screw, tensile strength of steel pipe, specific resistance of a wire, life of an electric bulb, etc.

Control Chart for Variables Chart for X and σ (S.D) Charts for X (Mean) and R (Range)

Control Chart for Attributes Control Chart for Number of Defects (c– chart) Control Chart for Fraction Defective (p – chart)

Process Control Chart & Control Criteria 1. No sample points outside control limits. 2. Most points near the process average. 3. Approximately equal No. of points above & below center. 4. Points appear to be randomly distributed around the center line. 5. No extreme jumps. 6. Cannot detect trend.

Basis of Control Charts Specification Control Charts – Target Specification: Process Average – Tolerances define the specified upper and lower control limits – Used for new products (historical measurements are not available) Historical Data Control Charts – Process Average, upper & lower control limits: based on historical measurements – Often used in well established processes

Common Causes 425 Grams

Assignable Causes (a) Location Grams Average

Assignable Causes (b) Spread Grams Average

Assignable Causes (b) Spread Grams Average

Assignable Causes (c) Shape Grams Average

Effects of Assignable Causes on Process ControlAssignable causes present

Effects of Assignable Causes on Process ControlNo assignable causes

Sample Means and the Process Distribution 425 Grams Mean Process distribution Distribution of sample means

The Normal Distribution -3  -2  -1  +1  +2  +3  Mean 68.26% 95.44% 99.97%  = Standard deviation

Control Charts UCL Nominal LCL Assignable causes likely Samples

Using Control Charts for Process Improvement  Measure the process  When problems are indicated, find the assignable cause  Eliminate problems, incorporate improvements  Repeat the cycle

Control Chart Examples Nominal UCL LCL Sample number (a) Variations

Control Chart Examples Nominal UCL LCL Sample number (b) Variations

Control Chart Examples Nominal UCL LCL Sample number (c) Variations

Control Chart Examples Nominal UCL LCL Sample number (d) Variations

Control Chart Examples Nominal UCL LCL Sample number (e) Variations

The Normal Distribution Measures of Variability: Most accurate measure  = Standard Deviation Approximate Measure - Simpler to compute R = Range Range is less accurate as the sample size gets larger Average  = Average R when n = 2

Control Limits and Errors LCL Process average UCL (a) Three-sigma limits Type I error: Probability of searching for a cause when none exists

Control Limits and Errors Type I error: Probability of searching for a cause when none exists UCL LCL Process average (b) Two-sigma limits

Type II error: Probability of concluding that nothing has changed Control Limits and Errors UCL Shift in process average LCL Process average (a) Three-sigma limits

Type II error: Probability of concluding that nothing has changed Control Limits and Errors UCL Shift in process average LCL Process average (b) Two-sigma limits

Control Charts for Variables Mandara Industries

Control Charts for Variables Sample Number1234RangeMean Special Metal Screw

Control Charts for Variables Sample Number1234RangeMean = Special Metal Screw

Control Charts for Variables Sample Number1234RangeMean = Special Metal Screw

Control Charts for Variables Sample Number1234RangeMean = ( )/4= )/4= Special Metal Screw

Control Charts for Variables Sample Number1234RangeMean = ( )/4= )/4= Special Metal Screw

Control Charts for Variables Sample Number1234RangeMean R = x = Special Metal Screw

Control Charts for Variables Control Charts - Special Metal Screw R - Charts R = UCL R = D 4 R LCL R = D 3 R

Control Charts for Variables Control Charts - Special Metal Screw R - Charts R = D 4 = Control Chart Factors Control Chart Factors Factor for UCLFactor forFactor Size ofand LCL forLCL forUCL for Samplex-ChartsR-ChartsR-Charts (n)(A 2 )(D 3 )(D 4 )

Control Charts for Variables Control Charts - Special Metal Screw R - Charts R = D 4 = D 3 = 0 UCL R = (0.0020) = in. LCL R = 0 (0.0020) = 0 in. UCL R = D 4 R LCL R = D 3 R

Range (in.) Sample number UCL R = LCL R = 0 R = Range Chart - Special Metal Screw

Control Charts for Variables Control Charts - Special Metal Screw R = x = x - Charts UCL x = x + A 2 R LCL x = x - A 2 R Control Chart Factors Control Chart Factors Factor for UCLFactor forFactor Size ofand LCL forLCL forUCL for Samplex-ChartsR-ChartsR-Charts (n)(A 2 )(D 3 )(D 4 )

Control Charts for Variables Control Charts - Special Metal Screw R = A 2 = x = x - Charts UCL x = x + A 2 R LCL x = x - A 2 R UCL x = (0.0020) = in.

Control Charts for Variables Control Charts - Special Metal Screw R = A 2 = x = x - Charts UCL x = x + A 2 R LCL x = x - A 2 R UCL x = (0.0020) = in. LCL x = (0.0020) = in.

Average (in.) Sample number x = UCL x = LCL x = Average Chart - Special Metal Screw

Average (in.) x = UCL x = LCL x = Sample number  Measure the process  Find the assignable cause  Eliminate the problem  Repeat the cycle Average Chart - Special Metal Screw

Control Charts for Attributes MANDARA Bank UCL p = p + z  p LCL p = p - z  p  p = p (1 - p )/ n

MANDARA Bank UCL p = p + z  p LCL p = p - z  p  p = p (1 - p )/ n SampleWrongProportion NumberAccount NumberDefective Total147 p = n = 2500 Control Charts for Attributes

Control Charts for Attributes MANDARA Bank UCL p = p + z  p LCL p = p - z  p  p = ( )/2500 n = 2500 p =

Control Charts for Attributes MANDARA Bank UCL p = p + z  p LCL p = p - z  p  p = n = 2500 p =

Control Charts for Attributes MANDARA Bank UCL p = (0.0014) LCL p = (0.0014)  p = n = 2500 p =

Control Charts for Attributes MANDARA Bank UCL p = LCL p =  p = n = 2500 p =

Sample number UCL p LCL Proportion defective in sample p -Chart Wrong Account Numbers

Sample number UCL p LCL Proportion defective in sample p -Chart Wrong Account Numbers  Measure the process  Find the assignable cause  Eliminate the problem  Repeat the cycle

Process Capability Nominal value Hours Upper specification Lower specification Process distribution (a) Process is capable

Process Capability Nominal value Hours Upper specification Lower specification Process distribution (b) Process is not capable

Process Capability Lower specification Mean Upper specification Two sigma

Process Capability Lower specification Mean Upper specification Four sigma Two sigma

Process Capability Lower specification Mean Upper specification Six sigma Four sigma Two sigma

Upper specification = 120 hours Lower specification = 80 hours Average life = 90 hours s = 4.8 hours Process Capability Light-bulb Production C p = Upper specification - Lower specification 6s Process Capability Ratio

Process Capability Light-bulb Production Upper specification = 120 hours Lower specification = 80 hours Average life = 90 hours s = 4.8 hours C p = (4.8) Process Capability Ratio

Process Capability Light-bulb Production Upper specification = 120 hours Lower specification = 80 hours Average life = 90 hours s = 4.8 hours C p = 1.39 Process Capability Ratio

Process Capability Light-bulb Production Upper specification = 120 hours Lower specification = 80 hours Average life = 90 hours s = 4.8 hours C p = 1.39 C pk = Minimum of Upper specification - x 3s x - Lower specification 3sProcessCapabilityIndex,

Process Capability Light-bulb Production Upper specification = 120 hours Lower specification = 80 hours Average life = 90 hours s = 4.8 hours C p = 1.39 C pk = Minimum of (4.8) (4.8) ProcessCapabilityIndex,

Process Capability Light-bulb Production Upper specification = 120 hours Lower specification = 80 hours Average life = 90 hours s = 4.8 hours C p = 1.39 C pk = Minimum of [ 0.69, 2.08 ] ProcessCapabilityIndex

Process Capability Light-bulb Production Upper specification = 120 hours Lower specification = 80 hours Average life = 90 hours s = 4.8 hours C p = 1.39C pk = 0.69 ProcessCapabilityIndexProcessCapabilityRatio