M. Battistin, J. Botelho – 20 October 2011EN/CV/DC Detector Cooling Project V Thermosiphon Workshop - Cost and Planning Michele Battistin Jose Botelho.

Slides:



Advertisements
Similar presentations
1 Chapter 2: Product Development Process and Organization Introduction Importance of human resources: Most companies have similar technology resources.
Advertisements

ACS 567: Software Project Management Spring 2009 Instructor: Dr. John Tanik.
Condenser supply contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
Journyx Projectlink™ Timesheet™ integration with Microsoft Project ® ENTER.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st October 2009 ATLAS cooling Group - Thermosiphon solution for ATLAS ID cooling.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
Pierre Bonneau EN/CV/DC
Infrastructure for LHCb Upgrade workshop CAD integration EDMS: February 2015.
Detector Cooling Project Thermosiphon Project Status Report
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire 1CERN - 4th November 2011 Experience from Construction.
Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES CHILLED WATER & COMPR. AIR PIPING Thomas F. Joos, P.E. Lead Civil/Structural Engineer CFAC Review November 9-10, 2009.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini & Michel Obrecht TE-EPC / EN-CV TEEPC.
LIGO-G M Planning and Implementation Strategy for Advanced LIGO Gary Sanders LSC Meeting Hanford, August 14, 2001.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
19 th November 2010EN/CV/DC Thermosiphon project IV review - Overall cost estimation and planning Michele Battistin Elena Perez Rodriguez 19 th November.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Infrastructure Improvements 2010 – November 4 th – Hepix – Ithaca (NY)
WINDOWS 8.1 WINDOWS 8.1 RT INTERNET EXPLORER 11 Is this the time for me?
Thermosiphon Project - Condenser repair CERN – Geneva January 8 th, 2014 M. Battistin & all TS team ATLAS + EN/CV.
Corporate Technical Infrastructure Management From MP5 to a Corporate Technical Infrastructure Management System.
JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
Project Management Methodology
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st September 2009 ATLAS Working Group Thermo-siphon review - Low temperature condensation.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
Thermosiphon quality management and documentation EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
Full Scale Thermosyphon Design Parameters and Technical Description Jose Botelho Direito EN/CV/DC 19 November, th Thermosyphon Workshop.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Jurgen De Jonghe CERN/IT-AIS Administrative Information Services Cost Estimate Tool For CLIC Jurgen De Jonghe CERN / IT-AIS
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
Cooling System Solutions
Thermosiphon project management and quality assurance EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
Michele Battistin Elena Perez Rodriguez 10 November 2010
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
EVM: 28 th June, Jurgen De Jonghe Collaborative Project Progress Tracking and Earned Value Management Jurgen De Jonghe IT-AIS
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Gas system for NA62 Straw detector Roberto Guida On behalf of Gas Service Team NA62 Straw working meeting, March 26, 2012 Outline: P&I Drawing Schedule.
17 th November 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 – November 17 th 2006 Michele Battistin (TS/CV/DC) TS/CV Detector Cooling On call and.
Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.
CERN GS Department CH-1211 Genève 23 Switzerland cern.ch/gs-dep Internet Services GS AIS General Services Department GS Advanced Information Services EVM.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
M. Battistin –6 th July 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 6 th July 2009 DCP WP3 First thermo-siphon workshop - Low temperature condensation.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
M. Battistin –17 th d June 2009 DC Project 1 M. Battistin 17 th June 2009 Detector Cooling Project - WP3 Advancement status.
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
1M. Battistin M. Battistin CERN EN/CV/DC 9 th July 2009 CO2 kick-off NIKHEF - Cooling activities organization at CERN 9 th July 2009.
East Area Renovation Project Team meeting # 2 – EDMS News
Cabling for LHCb Upgrade
LIU – EVM status and next steps
M. Battistin CERN EN/CV/DC 9th July 2009
ATLAS Thermosiphon Electrical Distribution and Run Modes
EN-CV: P8 systems and Detector Cooling
Low temperature chiller Market Survey
Benoît DAUDIN (GS-AIS-PM – CERN) 22-March-2012
Large Scale Structures
East Hall under construction
Presentation transcript:

M. Battistin, J. Botelho – 20 October 2011EN/CV/DC Detector Cooling Project V Thermosiphon Workshop - Cost and Planning Michele Battistin Jose Botelho 20 th October 2011

M. Battistin, J. Botelho – 20 October 2011EN/CV/DC EVM Project management This project is tracked using the Earned Value Management (EVM) technique Conceptual design report Definition Project breakdown structure Equipment coding convention PBS Work breakdown structure List of working units WBS & WU’s Resource responsibility matrix RRM Work units dictionary WU Planning Project coordination schedule 2

M. Battistin, J. Botelho – 20 October 2011EN/CV/DC Project Breakdown Structure (EDMS ) 3 Water Chiller Brine Condenser Piping USA15 Civil eng. Instrume ntation Control

M. Battistin, J. Botelho – 20 October 2011EN/CV/DC4 Work Breakdown Structure: 205 work units have been defined 27 resources (persons, companies, etc.) have been involved The responsibility and resource matrix has been defined EVM excel file have been published

M. Battistin, J. Botelho – 20 October 2011EN/CV/DC5 Thanks to the support of the Project Support Office we are integrating the EVM tool in a dedicated web interface. The beta version is available on _ _(1759).html EVM Project on the web

M. Battistin, J. Botelho – 20 October 2011EN/CV/DC Planning Time Autumn 2011 Winter 2011/2012 Spring 2012Summer 2012Autumn 2012 Winter 2012/2013 Design and integration Complete detailed design and integration Chiller system Manufacture Supply and installation Brine circuit IntegrationTenderingInstallationconnection Tank/conden ser Contract signature Manufacture Supply and installation C3F8 piping Design and Supports installation Installation of the pipes By-pass Detailed design Purchase of material Construction USA15 installati on Instrumentati on and control Functional analysis Purchase of hardware ProgrammingProgram tuning Electricity and Pneumatic installations Study the requirements Cupboards construction and installation Commissioni ng Tests with by-pass Tests with detector 6 Extended Technical Stop interference

M. Battistin, J. Botelho – 20 October 2011EN/CV/DC Cost tracking 7 Cost rise from Last budget estimation has been presented to ATLAS management on August Chiller N2 is not accounted. Cost are constantly tracked on EVM. The project has negative cost variance The project has negative schedule variance

M. Battistin, J. Botelho – 20 October 2011EN/CV/DC Conclusions The TS detailed design is well advanced The equipment integration is still an important open issue and needs your contribution. We shall start and operate the 2 kW to obtain insight for the functional analysis. Chiller construction is under-control. In general the project is late and need extra-resources to allow us to get the target date (Dec 2012). One member of ATLAS ID collaboration will be welcome to join the team. We required the support of a polish team for the assembly of the hydraulic part. We look forward to have your feedback! 8

M. Battistin, J. Botelho – 20 October 2011EN/CV/DC Thank you for your attention 9 Any questions ? Any questions ?