Engineering Economics, Ejaz Gul, FUIEMS, 2009 Engineering Economics Lecture # 8 MARR, Analysis of Alternatives.

Slides:



Advertisements
Similar presentations
Lecture 7 Evaluating a Single Project PW, FW, AW IRR
Advertisements

© Pearson Education Limited 2008 MANAGEMENT ACCOUNTING Cheryl S. McWatters, Jerold L. Zimmerman, Dale C. Morse Cheryl S. McWatters, Jerold L. Zimmerman,
Lecture No. 23 Chapter 7 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
13-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 13 Breakeven and Payback Analysis © 2012 by McGraw-Hill.
Evaluating Business and Engineering Assets Payback Period.
MANAGERIAL ACCOUNTING
9-0 Chapter 9: Outline Net Present Value The Payback Rule The Discounted Payback The Average Accounting Return The Internal Rate of Return The Profitability.
Capital Budgeting Decisions
Capital Investments Chapter 12. Capital Budgeting How managers plan significant outlays on projects that have long-term implications such as the purchase.
B280F Introduction to Financial Management
CAPITAL BUDGETING TECHNIQUES
Chapter 8 Capital Budgeting Techniques © 2005 Thomson/South-Western.
APPLICATIONS OF MONEY-TIME RELATIONSHIPS
11-1 Lecture 8: Capital Budgeting Decisions Chapter 12 in Brewer.
EGR Evaluation Alternatives Present Worth Analysis Companies constantly evaluate whether or not to pursue projects. Mutually Exclusive Projects.
INVESTMENT APPRAISAL.
Net Present Value and Other Investment Criteria
Net Present Value and Other Investment Criteria
0 Net Present Value and Other Investment Criteria.
Chapter 5: Evaluating a Single Project and Comparing Alternatives
Chapter 5: Evaluating a Single Project
8-1 Chapter 8: Capital Budgeting Techniques. 8-2 n The process of planning and evaluating expenditures on assets whose cash flows are expected to extend.
Chapter 6 Capital Budgeting Techniques © 2005 Thomson/South-Western.
Capital Budgeting and Cost Analysis
Capital Budgeting Evaluation Technique Pertemuan 7-10 Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
McGraw-Hill /Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. May 31 Capital Budgeting Decisions.
8/25/04 Valerie Tardiff and Paul Jensen Operations Research Models and Methods Copyright All rights reserved Economic Decision Making Decisions.
Contemporary Engineering Economics, 4 th edition, © 2007 Variations of Present Worth Analysis Lecture No.17 Chapter 5 Contemporary Engineering Economics.
P.V. VISWANATH FOR A FIRST COURSE IN FINANCE 1. 2 Decision Criteria NPV IRR The Payback Rule EVA Mutually Exclusive Projects The case of multiple IRRs.
Copyright © 2012 Pearson Prentice Hall. All rights reserved. Chapter 10 Capital Budgeting Techniques.
Flash back before we compare mutually exclusive alternatives.
Present Worth Analysis Lecture No.15 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Good Decision Criteria
FOOD ENGINEERING DESIGN AND ECONOMICS
Introduction ► This slide deck provides a suggested framework for the financial evaluation of an investment project. When evaluating any such project,
Chapter 12 The Capital Budgeting Decision. McGraw-Hill/Irwin © 2005 The McGraw-Hill Companies, Inc., All Rights Reserved. PPT 12-1 FIGURE 12-1 Capital.
Engineering Economics
Chapter 21 Capital Budgeting and Cost Analysis. Project and Time Dimensions of Capital Budgeting.
Typical Capital Budgeting Decisions Plant expansion Equipment selection Equipment replacementLease or buy Cost reduction 12-1.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Rate of Return Analysis Lecture No.
Present Worth Analysis Chapter 5 Types of Economic Alternatives Mutually Exclusive Alternatives: –Only one of the viable projects can be selected. –The.
The Capital Budgeting Decision Chapter 12. Chapter 12 - Outline What is Capital Budgeting? 3 Methods of Evaluating Investment Proposals Payback IRR NPV.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 5-1 Developed.
Evaluating a Single Project
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Discounted Cash Flow Analysis Lecture.
Basics of Capital Budgeting. An Overview of Capital Budgeting.
CHAPTER 9 Net Present Value and Other Investment Criteria.
Capital Budgeting. Typical Capital Budgeting Decisions Capital budgeting tends to fall into two broad categories...  Screening decisions. Does a proposed.
Investment Appraisal. Investment appraisal This refers to a series of analytical techniques designed to answer the question - should we go ahead with.
Needles Powers Crosson Financial and Managerial Accounting 10e Capital Investment Analysis 24 C H A P T E R © human/iStockphoto ©2014 Cengage Learning.
Chapter 5 Present-Worth Analysis. 2 Loan versus Project Cash Flows Initial Project Screening Methods Present-Worth Analysis Methods to Compare Mutually.
Chapter 5: Evaluating a Single Project
APPLICATIONS OF MONEY-TIME RELATIONSHIPS
Rate of Return Analysis
Chapter 5: Evaluating a Single Project
Investment Appraisal - Is it worth it?
Chapter 5: Evaluating a Single Project
Evaluation Alternatives Present Worth Analysis
Discounted Cash Flow Analysis
Chapter 5: Evaluating a Single Project
Evaluation Alternatives Present Worth Analysis
Chapter 7 Present Worth Analysis
Evaluation Alternatives Present Worth Analysis
Chapter 5: Evaluating a Single Project
Capital Budgeting Techniques
Chapter 5: Evaluating a Single Project
Chapter 5: Evaluating a Single Project
Presentation transcript:

Engineering Economics, Ejaz Gul, FUIEMS, 2009 Engineering Economics Lecture # 8 MARR, Analysis of Alternatives

Engineering Economics, Ejaz Gul, FUIEMS, 2009 Methods of Analysis Present worthPresent worth Future worthFuture worth Annual Worth - Finding the annual equivalent cost for each alternativeAnnual Worth - Finding the annual equivalent cost for each alternative Capitalized costCapitalized cost Study periodStudy period Pay back PeriodPay back Period Internal rate of return (IRR)Internal rate of return (IRR) Project balance (PB)Project balance (PB) Cost – benefit analysisCost – benefit analysis

Engineering Economics, Ejaz Gul, FUIEMS, 2009 Minimum Acceptable Rate of Return (MARR) The interest rate or rate of return, RR, expected on an investment would normally include a reasonable profit. MARR is the Rate of return or rate of interest for analysis of alternative The expected rate of return should be equal to or greater than MARR for a alternative to economically viable ROR  MARR > cost The MARR (Minimum Acceptable or Attractive Rate of Return) is the minimum limit of rate of return that an investor having in mind while investing funds in a project

Engineering Economics, Ejaz Gul, FUIEMS, 2009 MARR When a project has been proposed, it must first go through a preliminary analysis in order to determine whether or not it has a positive net present value using the MARR as the discount rate When a project has been proposed, it must first go through a preliminary analysis in order to determine whether or not it has a positive net present value using the MARR as the discount ratenet present valuenet present value The MARR is the target rate for evaluation of the project investment The MARR is the target rate for evaluation of the project investment The MARR generally increases with increased risk The MARR generally increases with increased risk

Engineering Economics, Ejaz Gul, FUIEMS, 2009 Present Worth Analysis  In present worth analysis, the P value, now called PW, is calculated at the MARR for each alternative  This method is popular because it easy to determine the economic advantage of one alternative over another  The PW comparison of alternatives is straightforward  A PW analysis requires a MARR for use as the “i” value in all PW relations.  The alternatives must be compared over the be compared over the same number of years!

Engineering Economics, Ejaz Gul, FUIEMS, 2009 PW should be equal to or greater than zero

Engineering Economics, Ejaz Gul, FUIEMS, 2009 Present worth - Investment Three purchase plans are available for a new car. Plan A: $5,000 cash immediately Plan B: $1,500 down and 36 monthly payments of $ Plan C: $1,000 down and 48 monthly payments of $ If a customer expects to keep the car five years and her minimum attractive rate of return (MARR) is 18% yearly, which payment plan should she choose? i = 18%/12 = 1½% PWCA = $5,000 PWCB = 1, (P/A) = $4,715,59 PWCC = 1, (P/A ) = $5, Therefore Plan B is best

Engineering Economics, Ejaz Gul, FUIEMS, 2009 I will always mention in the question whether it is investment alternative or revenue alternative Note

Engineering Economics, Ejaz Gul, FUIEMS, 2009 Future Worth Analysis  The future worth analysis (FW) of an alternative may be determined directly from the cash flows by determining the future worth value, or by multiplying the PW value by the F/P factor, at established MARR  Therefore, FWA is an extension of PW Analysis  FW values is especially applicable to large capital investment decisions when a prime goal is to maximize the future wealth of a corporation’s stockholders  It is often utilized if the assets might be sold at some time after its start-up, but before the expected life is reached  Also FW can be used for the projects that will not come online until the end of the investment period,e.g. electric generation facilities, roads, can be analyzed using the FW value of investment made during construction

Engineering Economics, Ejaz Gul, FUIEMS, 2009 Capitalized Cost (CC)   Capitalized cost (CC) is the present worth of an alternative that will last “for ever”   Public sector projects such as bridges, dams, irrigation systems, and rail roads fall into this category   The alternative with the smaller capitalized cost will represent the more economical one   PW (CC) = A / i

Engineering Economics, Ejaz Gul, FUIEMS, 2009 Study Period Approach  A study period analysis is necessary if the the length of time, the alternatives are needed, cannot be made  A time horizon is chosen over which the economic analysis is conducted, and only those cash flows, which occur during that time period, are considered relevant to the analysis  All cash flows occurring beyond the study period are ignored

Engineering Economics, Ejaz Gul, FUIEMS, 2009 Payback Period Analysis  Also called the payout analysis, is another extension of the present worth method.  The payback period is the estimated time, usually in years, it will take for the estimated revenues and other economic benefits to recover the initial investment and a stated rate of return  The payback period should never be used as the primary measure of worth to select an alternative. Rather, it should be determined in order to provide initial screening or supplemental information with an analysis performed using present worth or another method

Engineering Economics, Ejaz Gul, FUIEMS, 2009 Internal Rate of Return Definition: Rate of return (ROR) is the interest rate, i*, at which the net present worth of a project is zero. The internal rate of return is the rate of return promised by an investment over its useful life. It is some time referred to simply as yield on project. The internal rate of return is computed by finding the discount rate that equates the present value of a project's cash out flow with the present value of its cash inflow. In other words, the internal rate of return is that discount rate that will cause the net present value of a project to be equal to zero.

Engineering Economics, Ejaz Gul, FUIEMS, 2009 Calculating Rate of Return The IRR is the interest rate at which the benefits equal the costs.The IRR is the interest rate at which the benefits equal the costs. Find IRR (= i*) such that:Find IRR (= i*) such that: –PW Benefit - PW Cost = 0 –PW Benefit/PW Cost = 1 –PW Benefit = PW Cost –NPW = 0

Engineering Economics, Ejaz Gul, FUIEMS, 2009 IRR Calculation i*% 10%15% NPW NPW=+10.2 NPW=-4.02 i* = 13.5% X=? Y=1.6% X=3.5%

Engineering Economics, Ejaz Gul, FUIEMS, 2009 Project Balance Time profile chart of cash flow Present worth at each point of time over the life of a project Represented by PB Represents the loss or profit associated with the cash flow at any moment of the project life At Risk At Profit

Engineering Economics, Ejaz Gul, FUIEMS, 2009 Assignment # 2