Midwest Geotechnical Conference Indianapolis, Indiana September 22, 2015 Bob Arndorfer.

Slides:



Advertisements
Similar presentations
Metro Muncipal Agreement Program
Advertisements

HMA Warranties Seminar for CALTRANS Lee Gallivan FHWA Indiana Division April 3 rd, 2003.
TRAFFIC MANAGEMENT Tender and Construction Phase
Transition from Q1- 8th to Q1- 9th edition
DIVISION 5 SUBCOMMITTEE OCT 2014 Update. The Washington Chapter is one of 67 local chapters in the US and Canada which make up the American Public Works.
Design and Construction Guidelines for Thermally Insulated Concrete Pavements Lev Khazanovich, UM John Harvey, UCD Joe Mahoney, UW September 12, 2007.
Alternate Bidding: The West Virginia Experience 2011Virginia Concrete Conference March 3, 2011 Richmond, VA Bob Long Executive Director ACPA Mid-Atlantic.
Joe White (608) Wayne Chase (608) WisDOT Materials Management Section 1.
Asphalt Specification Changes July 2005 Contractor Asphalt Training Rich Hewitt, PE District Bituminous Engineer District Five Materials & Research.
Recruitment of the New LTPP SPS-10: Warm Mix Asphalt Experiment Gabe Cimini LTPP NCRSC Project Manager.
Perpetual Pavements Concept and History Iowa Open House
Mark Lindemann NDOR Geotechnical Engineer.  Background on previous field testing  Research – Non-nuclear field testing  Cost Savings of Going Non-Nuclear.
Construction of LLP HMA Pavements Pre-bid Meeting Solano 80; 04-4A0104 District 4 Oakland, CA September 14, 2012 Bob Humer.
Tranlation: EASL’s Average Daily Traffic Time or Traffic Pavement Condition Index Pavement Performance Pavement Condition High Performance Intersections.
MICHIGAN RIDES ON US 2015 Local Roads Workshop Gaylord March 12, 2015.
Alternate Bidding in Missouri Transportation Estimators Association Annual Conference November 2-4, 2005 – Daytona Beach, FL Interstate 44 … South-Central.
Uniform Paving Platform A Contractor’s Perspective J. Brent Moore Regional Manager Branscome, Inc. - Richmond.
Proctor Compaction Test for Maximum Dry Density
Intelligent Compaction Research & Development and QA Activities Richard B. Duval, P.E. Construction Research Engineer Infrastructure Research & Development.
1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State.
TRB AFK10 Committee on General Issues in Asphalt Technology Update on NCAT Test Track and Other Research Results April 24-26, 2006.
Warm Mix for a Cold Climate Colorado DOT’s 2007 WMA Project.
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
1 Overview CQC Asphalt Specifications.  Payment based on Contractor’s Quality Control tests.  FDOT runs verification tests at a lesser frequency. 
Asphalt Quality Assurance Program
Module 2-5 Field Sampling and Testing.  Identify reasons for conducting field sampling and lab testing  Describe typical field sampling and testing.
Construction Methods Lecture 9 Compacting Lecture 9.
PERFORMANCE-BASED PROCEDURES FOR IN-PLACE SOIL TESTING 2013 LTAP-TTAP National Conference Boise, Idaho July 24, 2013.
 Quality Management Program (QMP) Review  HTCP Program  IRI News.
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
1 8/29/2015WisDOT BTS MMS.  MIT – Materials Information Tracking (Field Version) Used by WisDOT/Consultant/& Municipal staff in the field to enter a.
11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 1 QMP Specifications QMP base aggregate QMP base aggregate Review and comment.
Florida Department of Transportation 1 Overview of CQC Asphalt Specifications.
Nondestructive Testing and Data Analysis Module 2-3.
FUEL AND ASPHALT COST ADJUSTMENT PROVISIONS. Use of Cost Adjustment Provisions FHWA Technical Advisory Dec 10, 1980 –“Price volatility of construction.
15 h ROAD PAVEMENTS FORUM East London May 2008 HMA Task Group.
Developing a Mixture-Based Specification for Flexible Base.
WisDOT Bureau of Technical Sevices Spring 2014 QMP Training Base Compaction SPV’s and Project Design Guidance.
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
 Have an approved mix design before paving.  The department has eliminated the use of PG -22 Asphaltic Material and replaced it with PG -28.  Tack.
2014 NCR Construction Conference Materials Presentation John Brophy Jeff Michalski
Guidelines for Use of Highway Specifications for Airport Pavements
Session #3 Asphalt 103- Materials: Basics of RAP, Usage and Specifications.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
1 Hot-Mix Asphalt and Flexible Pavement Design: the MEPDG Kevin D. Hall, Ph.D., P.E. Professor and Head, Dept. of Civil Engineering University of Arkansas.
Paving the way for over 60 years Presentation at the January 10, 2007 NCAUPG Technical Conference By Dusty Ordorff Bituminous Roadways, Inc.
 The objective of this task is to develop a mix design procedure for the various types of FDR  Determine what works and what does not work  Each.
WisDOT Bureau of Technical Sevices Spring 2014 QMP Training Base Compaction SPV’s and Project Design Guidance.
Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Implementing a Model Based Approach to Design at Wisconsin.
Analysis of Variations of Pavement Subgrade Soil Water Content 1 Andrew G. Heydinger, Ph.D., P.E. and 2 B.O.A. Davies 1 Professor and 2 Former Graduate.
By Terry Treutel Ride Quality Consultant Former WisDOT Ride Spec Coordinator.
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
IQE.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
Using Reflective Crack Interlayer-
HMA Warranties The Wisconsin Experience Presentation to the California Department of Transportation.
John Donahue, P.E. Missouri DOT 5 th Annual Building Green with Concrete Workshop June 21, 2012.
Extending the Life of Asphalt Mixes David Lee, P.E. - ARAC Chair, Salem District Materials Kevin McGhee, P.E. – ARAC Secretary, VCTIR.
CMRA WEBINAR ON NEW SPECIFICATIONS AND IMPLEMENTATION JUNE 15 TH, 2010 Recycled Asphalt Shingles in HMA Implementation: A Perspective from Wisconsin.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
Russian Engineers Training March 2011
Construction and Performance Evaluation of Roller Compacted Concrete under Accelerated Pavement Testing TRB Paper No: Moinul Mahdi Zhong Wu, PhD.,
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
Uniform Paving Platform A Contractor’s Perspective
QC Document Update Todd Shields, INDOT.
Alabama Asphalt Pavement Association
Quality Assurance for Emulsified Asphalt Surface Treatments
Restoration of Tribal Homelands & Tribal Control of Critical Land Management Activities: Tribal Administration of Resource Appraisal Services Candice Skenandore,
Prime Factors for Successful Preservation Treatments
Presentation transcript:

Midwest Geotechnical Conference Indianapolis, Indiana September 22, 2015 Bob Arndorfer

 Historical Practice  Research Study/Findings  Goals/Benefits  Development and Highlights of New Specification  Pilot Projects  Issues/Modifications Necessary  Moving Forward 2

 Where we were 3 years ago  Observational Method  Compact “until there is no appreciable displacement either laterally or longitudinally, under the compaction equipment.”  Somewhat Vague  Have Been Attempts to Reduce Subjectivity – Limited Success 3

 Subjective – No Consistent Method of Acceptance  No Documentation During Construction  Non-uniform Compaction Results  Issues Raised by Paving Contractors  Other States Using More Advanced Means 4

 Department Goal - Move to Performance Specs For Material Acceptance  Qual Mgmt Program (QMP) - Contractor tests/monitor  Reduces Departmental oversight and staff time  Give contractor more control of their operations Ultimate Goal: Increase Pvmt. Performance  Based on all this – Department Decided to Have Some Research Done on This Topic 5

 Many National Studies Using Different Devices  Dynamic Cone Penetrometer (DCP)  Lightweight Deflectometer (LWD)  Intelligent Compaction  Geogauge  Nuclear Gauge  Sand Cone  Other 6

 Investigate the Effectiveness of Our Current Methods, Survey Other States, Layout Future  Titled: ‘Feasibility Analysis of Base Compaction Specification’  Completed in 2012 by University of Wisconsin- Milwaukee (PI was Professor Hani Titi)  Investigated 11 Existing, and 10 New, HMA Pavement Projects  Look at Current, and Long-term, Base Performance 7

 Projects Located in Various Geographic and Geologic Regions of the State  ME Sensitivity Analysis Using DARWin-ME  Investigate Density-based and Modulus-based Methods  Look at Cost Implications of Differing Compaction Methods 8

 Investigate Project Material Records  Investigative Methods on Existing Projects  FWD  Visual Pavement Distress Surveys  Investigative Methods on Current Projects  Lightweight Deflectometer  Dynamic Cone Penetrometer  Sand Cone  Geogauge  Lab Tests including Resilient Modulus 9

 Out of 49 States and 13 Canadian Ministries, Only 4 Use Subjective Observation Methods for Acceptance – WI Was One of Four  Over 90% of the 63 Contacted Highway Agencies Used Density-Based Methods for Quality Control of Aggregate Bases 10

 71% of Highway Agencies Follow ASTM or AASHTO Test Methods  63% Use Nuclear Density Test Measurements  44% Use Standard Proctor for Max Density - Target Density: %  27% Use Modified Proctor for Max Density - Target Density: % 11

 High Variability of WI Bases Being Placed  Field Density  Moisture  HMA Pavement Performance Was Related to Spatial Variability and Non-uniform Density of Base Course  Well Performing HMA Pavements Exhibited Low Levels of Spatial Variability and Good Uniformity in Aggregate Base Courses 12

 The Uniformity of Base Density Appears to be More Critical Than Level of Compaction  Mechanistic-Empirical (ME) Sensitivity Analysis Showed Reduced Life (Increased distress levels) in Pavements With Lower Base Modulii  Base Density Work on 63% of Projects Had No Significant Impact on Project Schedules  53% of Responding Agencies Reported Density Implementation Has No Cost Impacts on Projects . 13

 42% of Highway Agencies are Looking for New Methodologies to Replace/Complement Their Current Density-Based Specifications  Recommend Quantitative Method of Acceptance Based on Testing  Suggest Investigating Continuous Compaction Control Techniques  Recommend Transitioning to Modulus-based Testing (More research needed to fully implement this.) 14

 Better Bases Facilitate Better HMA Compaction, Resulting in Longer Pavement Life  Measurements Will Increase Consistency of Base Placement Operations and Results  Measurement Will Provide Consistent/Defined Method of Base Acceptance – Not Subjective  Reduce Long-term HMA Pavement Maintenance Costs 15

 Reduce Contractor Risk at Time of Bidding and Provide More Equity  Provide Project Documentation of Compactive Levels Achieved  Any Construction Cost Increases Will Still Result in Reduced LCCA Costs  Move WisDOT/Contractor to QMP – Allow Contractor More Control of Their Operations  Transition From Method Spec. to Performance Specification 16

 Based on Study Results – Need New Spec  Aggregate Responsibility at WisDOT - ??  WisDOT and Industry Meetings  Application Issues to Address  What Types of Projects  Define Size of Projects  Where Used on Projects  Base Compaction Methods Already Being Used for WisDOT Airport Construction 17

 Developed Two Specifications/Test Methods  Milled/Pulverized and Overlay  Base Aggregate – Different testing based on percentage of RAP/RCA (Cut-off at 20% RAP/RCA)  Contractor to Provide QMP Plan  Required Certified Testers  QC and QV Requirements Set  Dispute Resolution – Third-party Lab (Vague)  How to Address Failures – Contractor to Take Corrective Actions Until Spec is Met 18

 Target Density Limit: 95% T-180 Modified Proctor  Additional Proctor if Gradation Varies ≥ 10% on Any One Sieve  Departmental QV Testing at Frequency of 30% of Contractor QC Testing  Payment Based on Ton or SY Basis 19

 Base Aggregate  Density Testing Frequency – Every 1000 tons  Gradation and Proctor – Every 3000 tons  Payment based on Tons  Mill/Pulverize and Overlay  Density Testing Frequency – Every 3000 SY  Gradation – Every 9000 SY  Additional Proctor if AC content changes by ≥ 1.5% by visual observation  Payment based on SY 20

 WisDOT Generally Works Closely With Industry When Developing Specifications  Different Perceptions  Paving industries in favor of it  Grading industry less enthused  Aggregate producers opposed  WI Transportation Builders Association has concerns  FHWA – Supports Movement to Density  Department – Favors Measurement 21

 Difficult to Bid - Unknowns  Increased Contractor Workload  Perceived Increased Contractor Risk  Potential For Project Delays if Issues  May Require More Compactive Effort by Contractor  Subgrade (Lower Layers) May Not Have Required Density 22

 Multiple Sources May be Used - Complications  Frequency of Testing – How Much?  Consider a Density Incentive?  Concerns Over Failed Tests and Remediation  Potential Project Delays Due to Required Testing  Concern Over Timing of Base Acceptance – (Delays in acceptance or Changes due to environmental conditions.) 23

 HMA Projects Only – Pvmt. Design Process  Travel Lanes and Shoulders Only  Pay Quantity Based on Total Material (Ton/SY)  Include Payment for Compaction Water  Base Aggregate 1¼”  Quantity ≥ 30,000 tons  Subgrade Improvement or QMP Subgrade, or Both  Mill/Pulverize and Relay  Quantity ≥ 40,000 SY 24

 Final Specification Language Developed  Various Geographic and Geologic Areas  Different Contractors  Density Results Used In One of Two Ways  Project Control  For Information Only 25

 Pilot Specification Used on 11 Projects  8 Base Aggregate  3 Mill/Pulverize and Relay  Generally Went Well, Some Issues Meeting Density Requirements  At End of Construction Season - Department Met With Industry to Discuss Improvements and Implement Revisions 26

2013 Project Results 27

 95% of T180 Difficult to Consistently Achieve  Issues With Density Measurements When RAP/RCA >20%  More Definition Needed on Corrective Actions and Acceptance Methods for Material Not Meeting Density  Findings of 2013 Projects Used to Modify Spec for 2014 Pilot Projects 28

 Pilot Specification Used on 9 Projects  8 Projects Base Aggregate, 1 Project Mill  576k tons Base Agg, 41k SY Mill/Relayed HMA  Revised Specifications  Base - Require 93% T180  Base - Testing frequency increased to 1500 tons  Base - In addition to dry density, can determine target density by wet density or control strip method (>20%)  Mill/Overlay – Only use control strip for target density  Corrective Actions Clarified 29

30

 Variation of QC and QV Proctor Values  Issues With Proctor Test Requirement When Gradation Changes by ≥ 10% on Any Sieve  Desire to Use Family of Curves  Timing of Density Testing and Acceptance  Need For Pre-placement Meeting  Need to Establish Dry-back Moisture Test Frequency 31

 Use QC Proctor Value for All Testing Once Verified by QV Tests (Require ≤3 pcf difference)  New Proctor Necessary When Moving Average of Four Gradation Tests Differs by ≥10% on Any Sieve  QC Can Use Family of Proctor Curves  Dry-back Moisture Content Required Every 9000 tons Base 32

 Contractor to Provide Description of Placement Methods, Staging, Equipment, Etc. in QMP  Require Pre-placement Meeting  Clarification on Retesting and Documentation of Corrected Lots 33

 Will be Standard Special Provision for 2016 Construction Season  Apply to all HMA Projects That Meet Criteria  Monitor to See if Additional Updates Necessary  Incorporate Into PCC Pavement ?  Lead to Water Bid Item on All Base Projects ?  Contractors Not Complaining Much - Improving  Contractors Realizing Importance of Water for Compaction 34

 Base Agg. Research Report Can Be Found At: pavements pavements  Questions? 35