M.P. RupenCorrelator Connectivity Scheme Review 31 July 2007 1 Scientific Impact Michael P. Rupen.

Slides:



Advertisements
Similar presentations
Thirteenth Synthesis Imaging Workshop 2012 May 29– June 5 Planning VLA Observations: Tutorial Michael P. Rupen NRAO/Socorro.
Advertisements

Digital FX Correlator Nimish Sane Center for Solar-Terrestrial Research New Jersey Institute of Technology, Newark, NJ EOVSA Technical Design Meeting.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 9/25/2012Prototype Review Meeting.
Bandpass Sigma-Delta Modulator Michael Vincent Brian McKinney ECEN5007.
Prototype SKA Technologies at Molonglo: 3. Beamformer and Correlator J.D. Bunton Telecommunications and Industrial Physics, CSIRO. Australia. Correlator.
Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Cross Correlators Walter Brisken.
Solar dynamic spectra C. Vocks and G. Mann 1. Spectrum of the quiet Sun: First results 2. How to obtain spectra: Beamformed data 3. Single station spectra.
The Prototype Correlator Sonja Vrcic Socorro, 5. December, 2006.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Backend electronics for radioastronomy G. Comoretto.
Eleventh Synthesis Imaging Workshop Socorro, June 10-17, 2008 Cross Correlators & New Correlators Michael P. Rupen NRAO/Socorro.
EVLA Correlator P. Dewdney Dominion Radio Astrophysical Observatory Herzberg Institute of Astrophysics National Research Council Canada.
From Idea to ALMA Project James Di Francesco Herzberg Institute of Astrophysics North American ALMA Science Center (thanks to Mike Rupen, Gianni Comoretto.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
Technology and Functionality of the EVLA Correlator (Next Corr Workshop, June 27, 2006)
EVLA Overall System Specifications Rick Perley EVLA Project Scientist.
Stability of Maximum S/N Beams CSIRO ASTRONOMY AND SPACE SCIENCE Aidan Hotan | ASKAP Deputy Project Scientist 4 th March 2014 SKA Workshop on Calibration.
Cycle-3 Capabilities and the OT Andy Biggs ALMA Regional Centre, ESO.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
TelCal Phasing Engine description Draft Robert Lucas
April 19, 2007 EVLA Update1 The EVLA Project An Update Rick Perley National Radio Astronomy Observatory.
Digital Packaging Processor Gordon Hurford Jim McTiernan EOVSA PDR 15-March-2012.
XNTD/SKAMP/LFD Correlator 4th RadioNet Engineering Forum Workshop Next Generation Correlators for Radio Astronomy and Geodesy June 2006, Groningen,
Scheduling Blocks: a generic description Andy Biggs (ESO, Garching)
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
ASKAP Capabilities John Reynolds on behalf of the SEIC and ASKAP team.
Observing Modes from a Software viewpoint Robert Lucas and Philippe Salomé (SSR)
Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Correlator.
Tenth Synthesis Imaging Summer School UNM, June 13-20, 2006 Cross Correlators Walter Brisken.
1 SAGE Committee Meeting – December 19 & 20, 2008 National Radio Astronomy Observatory Correlator Status and Growth of Capabilities Michael P. Rupen Project.
Configuration Mapper Sonja Vrcic Socorro,
Rick Perley 2 Nov 2001 EVLA Correlator Conceptual Design Review 1 Science Drivers for the EVLA Correlator Rick Perley EVLA Project Scientist 2 Nov 2001.
M.P. RupenCorrelator Face-to-Face Meeting 31 Oct 2006 Output Formats Part II Michael P. Rupen.
A real-time software backend for the GMRT : towards hybrid backends CASPER meeting Capetown 30th September 2009 Collaborators : Jayanta Roy (NCRA) Yashwant.
Philippe Picard 2 nd SKADS Workshop October 2007 Station Processing Philippe Picard Observatoire de Paris Meudon, 11th October 2007.
ATCA GPU Correlator Strawman Design ASTRONOMY AND SPACE SCIENCE Chris Phillips | LBA Lead Scientist 17 November 2015.
Rick PerleyEVLA Advisory Committee Meeting September 6-7, 2007 Some Illustrative Use Cases Rick Perley.
Overview of New Connectivity Scheme for the EVLA Correlator B. Carlson July 31, 2007.
M.P. RupenEVLA Advisory Committee Meeting September 6-7, Correlator Test Plan Michael P. Rupen.
M.P. RupenCorrelator Connectivity Scheme Review 31 July Correlator Specifications Michael P. Rupen.
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
Brent WilloughbyEVLA Front-End CDR – WVR Option 24 April EVLA Front-End CDR Water Vapor Radiometer Option.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
M.P. Rupen, Synthesis Imaging Summer School, 18 June Cross Correlators Michael P. Rupen NRAO/Socorro.
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array ALMA Correlator.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.
Imaging issues Full beam, full bandwidth, full Stokes noise limited imaging Algorithmic Requirements: –PB corrections: Rotation, Freq. & Poln. dependence,
JIVE UniBoard Correlator External Review
Surveying Cosmic Time with the WIDAR Correlator
EVLA Availability - or - When Can I Use It?
VLA/VLBA INTEGRATION With appropriate outfitting, the VLA+NMA+VLBA could be one integrated instrument covering all resolutions from arcminutes to well.
JIVE UniBoard Correlator (JUC) Firmware
Correlator – Backend System Overview
EVLA Correlator F2F Meeting Dec , 2007
EVLA Correlator New Connectivity Scheme Software Impact Sonja Vrcic
Rick Perley National Radio Astronomy Observatory
Telecommunications Engineering Topic 2: Modulation and FDMA
Shared Risk Observing Claire Chandler EVLA SSS Review, June 5, 2009
Some Illustrative Use Cases
Gustaaf van Moorsel September 9, 2003
Prototype Correlator Testing
Shared Risk Science with the EVLA
EVLA Advisory Committee Meeting, March 19-20, 2009
Prototype Correlator Tests on the Critical Path
Correlator Growth Path
VLA EXPANSION PROJECT Correlator Issues.
EVLA Advisory Panel Mtg. System Overview
SKAMP Square Kilometre Array Molonglo Prototype
Presentation transcript:

M.P. RupenCorrelator Connectivity Scheme Review 31 July Scientific Impact Michael P. Rupen

M.P. RupenCorrelator Connectivity Scheme Review 31 July It’s still WIDAR 32 stations, scaleable in 8-station increments; up to 256 allowed 8 x 2 GHz “basebands”, each comprised of 16 tunable sub- bands 16,384 channels per max. BW 4 million channels per baseline, w/ recirculation High spectral dynamic range 1, 2, 3, 4, or 8-bit initial quantization; 4- or 7-bit after sub- band filter RFI excision Flexibility

M.P. RupenCorrelator Connectivity Scheme Review 31 July Conceptually much simpler “Baseband” quadrants, each handling one BB pair  vs. previous sub-band correlators Each sub-band pair is independent of all others Full recirculation for all sub-bands  Full flexibility in bandwidth and channelization Much easier to understand Much easier to explain -- huge benefit for a national facility! Exception: autocorrelations

M.P. RupenCorrelator Connectivity Scheme Review 31 July Conceptually much simpler Incremental buildup of correlator makes more sense Could either add a few antennas with full BW, or more antennas with lesser BW (might depend on board availability)

M.P. RupenCorrelator Connectivity Scheme Review 31 July Added capabilities R2: recirculation on every sub-band  Old scheme: only half Phase up entire (16 GHz) bandwidth  Old scheme: only 1 GHz  1-2 subarrays per sub-band (!) Sub-band beams and pulsar modes  Each sub-band could have different phase bins (except STB DUMPTRIG limitations) -- could simultaneously track up to 128 different pulsars!  Can mix phase binning in some sub-bands with “normal” observations in others  Each sub-band can have a different phase center

M.P. RupenCorrelator Connectivity Scheme Review 31 July Equivalent capabilities All previous cross-correlation modes still work (see Memo #28): even wide-bandwidth 32 stations at full bandwidth Expansion in 8-station increments  Can expand with 1, 2, 3, 4 quadrants, depending on bandwidth per station (4 GHz chunks)  Separate VLBA correlator makes more sense

M.P. RupenCorrelator Connectivity Scheme Review 31 July Lost capabilities & restrictions Can’t trade bandwidth for stations (since one cannot cross-correlate baseband pairs)  Can’t use the same correlator for VLBA+EVLA Subarrays come in groups of 4 antennas –Not seen as a major problem Don’t get all autocorrelations, and figuring out which you can get is complex

M.P. RupenCorrelator Connectivity Scheme Review 31 July Subarrays

M.P. RupenCorrelator Connectivity Scheme Review 31 July Restrictions Antennas within a four-antenna group defined by the Baseline Board must use synchronized real-time dump timing –This is because one dump control signal is selected and used for each chip -- this is set by the chip design. Each Correlator Chip Cell (CCC) can use different integration times, but those integration times for all CCCs in a given Correlator Chip must be harmonically related. So, if sub-bands correlated by the same Correlator Chip belong to multiple subarrays, those subarrays must have the same minimum hardware integration time. In practice this means that antennas within a four-antenna group must either not use recirculation, or use the identical recirculation setup –One also cannot mix pulsar phase binning and non-pulsar modes within the same four-antenna group, but this seems less important

M.P. RupenCorrelator Connectivity Scheme Review 31 July Restrictions The two re-timing FPGAs on each BLB have cross-bar switches and are wired together, to allow grouping any set of 4 antennas within the full 32. With 32-27= 5 “extra” stations, one can make the system even more flexible This provides complete flexibility in defining up to 8 completely independent subarrays. 8 is a magic number because the Correlator Chips on a BLB are arranged in an 8x8 square; all chips in the same row or column receive the same data streams. The cross-bar + wiring described above gives complete freedom in determining which antennas go to which data streams. NOTE: the number of truly independent subarrays is also limited by the number of independent DUMPTRIGs provided by the STBs.

M.P. RupenCorrelator Connectivity Scheme Review 31 July DUMPTRIGs Number of independent DUMPTRIGs limits: (1)Number of independent pulsar phase bin parameters (one per DUMPTRIG) (2)Number of truly independent subarrays -- those relying on the same DUMPTRIG have to use dumptimes which are harmonically related. -- Likely ok, but messy… Currently: 2 independent DUMPTRIGs per STB Using a bigger chip would push this waaaay up

M.P. RupenCorrelator Connectivity Scheme Review 31 July Autocorrelations

M.P. RupenCorrelator Connectivity Scheme Review 31 July The Issue Wideband autocorrelations unchanged –Time multiplexed –No sub-band boundaries More efficient use of BLBs means diagonal corr. chips obtain cross- as well as auto-correlations –In many cases one only gets half the sub-band autocorrelations (e.g., 5R x 5R & 6L x 6L) –These restrictions result from limitations in the correlator chip wiring -- only the primary inputs can go to all corr.chip quads.

M.P. RupenCorrelator Connectivity Scheme Review 31 July Specific restrictions (both 4- and 7-bit) 4-pol’n product modes (RR, LL, RL, LR) –can obtain only ONE pol’n A/C product per antenna –can’t get the SAME pol’n A/C product for paired antennas –CAN get cross-pol’n A/C products (e.g., 5R x 5L) –examples: 1R x 1R + 2L x 2L OK 1R x 1L + 2R x 2L OK 1R x 1L + 2R x 2R no good 1R x 1R + 2R x 2R no good  CAN get ONE pol’n for all antennas, at all times  Another option: obtain ALL auto-corr’n pol’n products, but only for half the antennas  E.g., 1R x 1R, 1L x 1L, 1R x 1L; 3R x 3R, 3L x 3L, 3R x 3L; etc., but without any autocorr’ns for antennas 2, 4, 6, …

M.P. RupenCorrelator Connectivity Scheme Review 31 July Specific restrictions (both 4- and 7-bit) 2-pol’n product modes (RR, LL) –same as 4-pol’n product modes, above 1-pol’n produce modes (e.g., RR) –can get ALL auto-correlations

M.P. RupenCorrelator Connectivity Scheme Review 31 July Complications Correlator setup –Painful to explain, painful to implement Correlator output data format (Binary Data Format & Science Data Model) –Auto- and cross-corr’n products have different dimensions, and are not necessarily from related chips

M.P. RupenCorrelator Connectivity Scheme Review 31 July Examples (memo 29/next talk) 32 stations, 4-bits: half A/C products – all pol’n products for 2 of every 4 stations, –OR, one pol’n product for each station (2 in RCP, 2 in LCP) 32 stations, 7-bits: all A/C products 28 stations, 4-bits: all PP for 22 stations 26 stations, 4-bits: all A/C products Multiple subarrays: messy…

M.P. RupenCorrelator Connectivity Scheme Review 31 July Why we care General diagnostic –time multiplexing probably OK RFI identification & excision –not fully worked out yet… –pol’n info likely not critical –most RFI NOT time variable on timescale available at BLB (msec) –RFI likely concentrated in a few sub-bands -- could devote extra correlator resources to those sub-bands

M.P. RupenCorrelator Connectivity Scheme Review 31 July Why we care Gain calibration (scale to template spectrum -- ACFIT) –not clear this is needed for (or possible with) EVLA Bandpass calibration (amplitude only) –seldom useful in practice, due to single-dish woes Polarization delay calibration, based on (e.g.) 5R x 5L –Seldom used, often discussed –Currently used at the VLA, but only occasionally (~each re- configuration) –Need only one antenna, to provide one point to tie the electric vector position angle (EVPA) –Easy to do with occasional special calibration observation, at worse one scan at beginning of each run

M.P. RupenCorrelator Connectivity Scheme Review 31 July Why we care Tsys(frequency) Divide cross- by auto-corr’ns on a channel-by- channel basis? –might want this for Tsys weights & Van Vleck corr’ns, but that is far from obvious

M.P. RupenCorrelator Connectivity Scheme Review 31 July Possible fixes Don’t worry about it –No compelling reason we must have all sub-band auto-corr’ns at all times –Non-RFI uses have low duty cycle –We still have the wideband auto-corr’ns (though those are time- multiplexed) Time multiplexing –Switching auto-corr’n modes requires stopping the correlation (including the cross-corr’ns done in the same chip) for two interrupts (20 msec) –Fine for cross-pol’n calibration

M.P. RupenCorrelator Connectivity Scheme Review 31 July Possible fixes Use an extra quad or two for the auto-corr’ns –Main use is likely for RFI, where we have limited bandwidths –Could allocate half the correlator for auto-corr’n (costs spectral res’n) Use an additional (or unused) Baseline Board, in auto- corr’n mode –Works in 4-bit mode, or can just toss lower 3 bits of 7-bit datum –each BLB gives 64 auto-corr’ns (2048 channels covering 128 MHz), dumping every 10 msec Limited by GigE connection to the CBE Faster dumps possible with fewer channel

M.P. RupenCorrelator Connectivity Scheme Review 31 July Missing zero lags

M.P. RupenCorrelator Connectivity Scheme Review 31 July The Issue Zero lags are required to normalize the cross-correlations Previously these were obtained from sub- band auto-corr’ns

M.P. RupenCorrelator Connectivity Scheme Review 31 July Fixes Use zero lags from Station Boards 10msec time resolution currently Doesn’t exactly correspond to cross-correlation spectra (time res’n, recirculation, blanking, …) Must get this to the CBE within two LTA dumps (not a problem) Use re-timing/cross-bar FPGAs or recirculation chips Just need 64 lag-0 accumulators