ERCOT ROS Planning Working Group (PLWG) Scope Approved at 3-12-10 ROS Meeting.

Slides:



Advertisements
Similar presentations
NERC Policies Introduction
Advertisements

Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Regional Planning Group Charter Revisions May 2008.
Carol Chessmore Oncor 2013 DWG Vice Chair 2014 DWG Chair - Pending ROS Approval January 9, 2014 ERCOT ROS Meeting Austin, TX.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
SPS Mis-operation – DRAFT Proposal for ERCOT procedures.
System Operations Staffing Request Presented to the ERCOT Board Of Directors By Sam Jones, COO November 16, 2004.
Other Binding Documents Ann Boren ERCOT TAC/TAC Subcommittee Structural and Procedural Review ERCOT Public August 27, 2014.
Update On The ERO Transition Activities To Comply With The 2005 EPAC ERCOT TAC Meeting March 9, 2006 Sam Jones, COO.
Compliance Monitoring and Enforcement Audit Program Background Information.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
2015 RTP – Study Scope of Short Circuit Analysis RPG Meeting May 19,
May 13, 2008 COPS Commercial Operations Subcommittee (COPS) Procedures Review ERCOT Market Rules.
RPG Meeting Five Year Plan Extension Brad Schwarz.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
TEXAS NODAL Board of Directors Austin, Texas July 15, 2003.
RMS Update to TAC January 8, Voting Items From RMS meeting on 12/10/2008  RMGRR069: Texas SET Retail Market Guide Clean-up – Section 7: Historical.
Texas Nodal March Texas Nodal NMMS Requirements By John Adams ERCOT.
ERCOT Strategic Plan H.B. “Trip” Doggett President and Chief Executive Officer Technical Advisory Committee ERCOT Public December 3, 2013.
March 19, 2008 WMS WMS Procedures Review Nieves López ERCOT Market Rules.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
COMPLIANCE UPDATE ERCOT ROS Meeting April 9, 2002.
August 28, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 9, 2014 TAC Update to RMS 1.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
November 2, 2006 LESSONS FROM CIPAG 1 Lessons from Critical Infrastructure Group Bill Bojorquez November 2, 2006.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee October 9, 2003.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
NDSWG Report June 16, NDSWG Report Regular meeting held May 16 in Taylor Telemetry / State Estimator Update Naming Convention Electrical Bus Designation.
SAR 001 DT Presentation Texas RE Presentation to SAR-001 Drafting Team Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
February 3, 2011 TAC ERCOT Planning Go-Live Update Jay Teixeira Manager, Model Administration.
PLWG Report to ROS January 7, Draft NPRR More closely aligns a generation line item in the CDR with the generation included in the Planning Models.
ROS July 10, 2008 Meeting WOTF Update on ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008) Mark Garrott WOTF Chair.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
Reliability and Operations Subcommittee Report 2/2/2012.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
ERCOT MARKET EDUCATION Retail 101. Market Rules Overview Topics in this lesson...  Introduction to Market Rules Public Utility Regulatory Act PUCT Substantive.
PLWG Report to ROS September 4, PGRR039 PGRR requires Interconnecting Entities (IEs) to provide information for ERCOT’s resource adequacy reports,
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
Joint PLWG/CMWG Assignment Update to ROS September 15, 2011.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
Market Credit Risk Standard Key components Cheryl Yager August 20, 2008.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Generation Adequacy Task Force Meeting April 10, 2014.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
PLWG Report to RPG January 21, 2014 Presented by John Moore, PLWG Chair.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
RELIABILITY AND OPERATIONS SUBCOMMITTEE Report to TAC Austin, TX December 1, 2011 Kenneth A. Donohoo, P.E. Chairperson Oncor Electric Delivery Company.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Freeport Area Master Plan Project -
Modeled Load Levels in the Valley
NOGRR-169 OWG discussion Bill Blevins June 28, 2017.
PLWG Review 6.9 and the Interconnection process
Southern Cross Directives Planning Items
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
NPRRs NPRR654 Discontinue Ancillary Service Requirement Methodology Assessment Report. This Nodal Protocol Revision Request (NPRR) proposes the discontinuation.
Modifications to Planning Charter
Oncor Electric Delivery Company LLC
Reliability and Operations Subcommittee Report
Standards Review Subcommittee Update
Presentation transcript:

ERCOT ROS Planning Working Group (PLWG) Scope Approved at ROS Meeting

PLWG Scope Non-voting group open to all stakeholders, PUCT Staff and ERCOT. Reports to the Reliability and Operations Subcommittee (ROS) on a regular basis. The ROS approves the PLWG chair and subgroup chairs as recommended by PLWG. The chair schedules meetings as required to discharge its responsibilities. When consensus cannot be achieved on an issue, the issue should be fully described and options presented to the ROS for disposition.

PLWG Scope Functions of the PLWG include: – Assignments from the ROS – Review the criteria, processes and data provision requirements included in the Planning Guides, to identify any needed improvements and recommend appropriate solutions for ROS action or approval. – Review proposed Planning Guides Revisions and make recommendations for ROS approval.

PLWG Scope Functions of the PLWG include: – Review Planning Guides for alignment with North American Electric Reliability Corporation (NERC) Reliability Standards requirements and recommend appropriate Regional Standard Authorization Requests (SARs), Planning Guide Revision Requests (PLGRRs), or Protocol Revision Requests (PRRs) as needed. – Assist with review and analysis of unusual or emergency type events having a significant impact on ERCOT as

Planning Guides Outline Approved at ROS Meeting

Planning Guides Outline Rev 0 indicates inserting document without change. Rev 1 indicates inserting document with moves and deletions Rev 2 indicates inserting new or significantly revised document

Planning Guides Outline Introduction (Rev 2) Process For Planning Guide Revisions (From Section 1 of Operating Guides - Rev 1) Regional Planning Process Rev 0 (RPG Charter) – Move TPIT to Section 5.6 Data (Rev 1) – Move ALDR to Data (Rev 1) – Move Economic Criteria to Criteria section (Rev 1)

Planning Guides Outline Generation Interconnection Process (From Generation Interconnection or Change Request Procedure - Rev 0) Planning Criteria – Reliability criteria (Section 5 of the current operating guides – Rev 0) – Evaluate if section 7 (or parts thereof) of Operating Guides dealing with System Protection should be moved to the Planning Guides. (Rev 1 or 2) – Economic Criteria(from RPG Charter Rev 1) – Requirement for posting TSP Specific Planning Criteria (Rev 1 or 2)

Planning Guides Outline Data/Modeling – Transmission Planning Steady State models base case development (SSWG Procedures- Rev 1)(revised Nodal version Rev 2) – Dynamic Model development (DWG procedures Rev 1) – SPWG Procedures Model development (DWG procedures Rev 1) – TPIT Report Procedures (Rev 1 or 2) – ALDR Procedures (Rev 1 or 2)

Planning Guides Outline Data/Modeling – Economic Assumptions development Procedures (Rev 2) – Data Dictionary Explanation and Procedures (move from SSWG procedures-Rev 1) – Generator Data Procedures for use in Transmission Planning (Rev 2) – Contingency List (Multiple Circuits) Submission and Procedures (move from SSWG procedures-Rev 1) – Connectivity node group development procedures with NMMS (Rev 1 or 2)

Planning Guides Outline Should the Planning Guides include PASA/SOO documentation? (PUC Sub Rule ) (At ROS meeting direction was to include only portions that need further documentation) Should the Planning Guides include CDR procedures? (Generation Adequacy TF/LOLP) (At ROS meeting direction was that including documentation of CDR procedures should probably be added to Planning Guides.)