Ancillary Services Redesign Update ERCOT TAC Meeting 6-25-15 16/25/2015.

Slides:



Advertisements
Similar presentations
GPA Renewable Energy Resource for Guam Power Authority
Advertisements

1 Generation Adequacy Task Force Report to TAC April 7, 2005.
SAWG Update to WMS February 4 th, 2015 Brandon Whittle.
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
RTWG Report to TAC August 5, 2010 Howard Daniels.
Overview of CPUC/CEC Proposed Decision: Recommendations for the Electricity Industry September 2008 Nancy Ryan Chief of Staff, Office of Commissioner Peevey.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
1 Ancillary Services Requirements for Future Ancillary Services Cost Benefit Analysis FAS/SIRS Meeting September 21, 2015.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
Western Wind and Solar Integration Study Debbie Lew National Renewable Energy Laboratory SWAT/CCPG Meeting Aug 22, 2007.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
Future Ancillary Services (NPRR 667) Update March 26, 2015 TAC meeting 1.
2011 Project Prioritization Troy Anderson ERCOT Program Management Office April 2010.
1 CPUC Avoided Cost Workshop Introduction and Overview.
1 Project Update and Summary of Project Priority List (PPL) Activity September 10, 2015.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
ERCOT Long-Term Demand and Energy Forecasting February 20, 2007 Bill Bojorquez.
Lead from the front Texas Nodal 1 External Web Services Update Nodal Implementation Team Presentation July 7, 2009.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
Wind ELCC Calculation Comparisons and ERCOT’s NERC LTRA Capacity Forecasts GATF Meeting, June 24, 2014.
Reliable Power Reliable Markets Reliable People Losses and Ancillary Services: Volume Analysis 2007 Budget Review Process August 28, 2007 Operations Planning.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
Market Credit Working Group update to the Wholesale Market Subcommittee 10/07/
ERCOT PUBLIC 6/17/ LTSA Load Distribution Methodology June 17, 2014.
Wholesale Market Subcommittee Texas Interconnection Long-Term Study Update Warren P. Lasher April 8, 2011.
Photovoltaic and Storage Integration Workshop “Operational Issues” Kenneth Ragsdale October 15, 2012 ERCOT.
Analysis of ERCOT Regulation Service Deployments during 2011 David Maggio Market Enhancement Task Force Meeting 3/29/
August 28, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 9, 2014 TAC Update to RMS 1.
Final Report on Fast Responding Regulation Service (FRRS) Pilot Project TAC March 27th, 2014.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
July 30, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 4, 2015 TAC Update to RMS 1.
SAWG Update to WMS April 6 th, 2015 Brandon Whittle.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
ERS Update – DSWG Presentation September 21, 2012.
1 Business Integration Update to PRS Troy Anderson ERCOT Enterprise Project Portfolio Management August 18, 2011.
Market Credit Working Group update to the Wholesale Market Subcommittee 09/02/
August 27, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 1, 2015 TAC Update to RMS1.
Economic Analysis Proposed Scope ERCOT RPG Meeting September 17, 2010.
Harika Basaran 11/05/2014 TAC October 23, 2014 Meeting Update to Commercial Operations Subcommittee.
SAWG Update to WMS September 2 nd, 2015 Brandon Whittle.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
Future Ancillary Services Team (FAST) Update April 24, 2014 TAC Meeting 1.
SAWG Update to WMS March 4 th, 2015 Brandon Whittle.
RMS Update to TAC October 2, RMS Update to TAC TAC Confirmation Vote Request Kyle Patrick of Reliant Energy and Independent Power Marketer segment.
1 Next Steps to Reduce the RTM Settlement Timeline COPS Workshop August 29, 2013.
Middle Fork Project Relicensing Process Plan April 25, 2006.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 13, 2012 WMS and June 14, 2012 ROS.
COPS JULY 2013 UPDATE TO TAC 07/02/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
ERCOT PUBLIC LTSA Introduction. ERCOT PUBLIC 2 Outline  Background  2016 LTSA Process  2016 Scenario Development Process  2016 LTSA Schedule.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
Project Funding Review February 7, Background ERCOT has a $15M project budget in 2013 (same as 2012) –To allow for new additions to the.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
May 28, 2015 and June 30, 2015 Information Session TAC Meeting Update to COPS Michelle Trenary, July 15, 2015.
Weather-Sensitive ERS Pilot Project Proposal March 7, 2013 TAC Meeting.
GATF Loss of Load Process (or How to Make Sausage) October, 2012.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
LTSA Scenario Development Workshop
Economic Forecast Review
2017 Seasonal Adjustment Factors
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
RTDF Overview of Data Analysis & Status of “Consesus Items”
CCWG September 29th Meeting
DER Growth Scenarios and Load Forecasts Working Group
Presentation transcript:

Ancillary Services Redesign Update ERCOT TAC Meeting /25/2015

1.Overview of Next Steps and Cost Benefit Analysis Scope 2.Project Milestones for Cost Benefit Analysis 3.Overview of Assumptions Document 4.Review of “Criteria of a Good Base Case” Agenda 26/25/2015

1.ERCOT to file comments on NPRR 667 (early July 2015) a.Remove cap on FFR price b.Include improvements based on Market Participant comments already filed c.General “clean-up” 2.Stakeholders provide comments on NPRR 667 and ERCOT comments (by early fall) 3.Complete FAS CBA (October 2015) 4.Review and discuss comments on NPRR 667 and FAS CBA 5.Provide “polished” NPRR 667 and completed CBA to PRS/TAC (Late Fall 2015) 6.Continue Synchronous Inertial Reserve Service (SIRS) discussions this summer Next Steps 36/25/2015

Scenarios Case 1: Current AS (2015 methodology) Case 2: Future AS Case 3: FAS with new resources participating Baseline (Year 2016) Scenario based on 2016 interconnection queue Run 1*Run 2* --- LTSA Scenarios (Year 2024) Current Trends Run 3*Run 4*Run 7 Stringent Environmental Regulation/Solar Mandate Run 5*Run 6*Run 8 Summary of Study Scenarios (from CBA RFP) 46/25/2015 * denotes the run has a unique set of AS Requirements

Sign-off on 2016 Base Case – June 26, 2015 July 2015: –Post 2016 Base Case Current AS requirements –Post 2016 Base Case Future AS requirements August 2015: –Post Current and Future AS requirements for 2024 September 2015: –Complete all 8 Runs October 2015: –Complete First Draft of Final Report by mid October –Post Final Report by the end of October Cost Benefit Analysis Project Milestones 56/25/2015

1. Generator Resource Modelling 1.1 Generation Mix assumptions 1.2 Generation Modelling 1.3 Renewable Generation Profiles 1.4 Hydro generation Modelling 1.5 DC-Ties Modelling 1.6 Generator Ancillary Services Qualification and Modelling Assumptions 2. Load Resource Modelling 3. System Load Forecast 3.1 Load Forecast Scenarios Overview of Modelling and Assumptions Document (1 of 2) 66/25/2015

4. Ancillary Services Definitions 4.1 Current Ancillary Services 4.2 Future Ancillary Services 5. Ancillary Services Requirements and Modelling 5.1 Current AS Requirements determination methodology 5.2 Future AS Requirements determination methodology 5.3 Determination of Current AS Requirements for the CBA Overview of Modelling and Assumptions Document (2 of 2) 76/25/2015

1.Energy Prices/Implied Market Heat Rate a.Reasonable monthly hourly average implied heat rates (Compare to 2013 and 2014) 2.Ancillary Services Prices a.Reasonable monthly hourly average reserve price curves in non-scarcity conditions 3.Generator Operations a.Average annual capacity factors by unit type b.Average annual hours-up (or capacity factor while up) by unit c.Average reserve contribution by type d.Units should be operating in a way that makes physical sense 4.Headroom 5.Model Inputs a.Confirm that model inputs are consistent and reasonable “Criteria of a Good Base Case” 86/25/2015