IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
1 CO 2 cooling of an endplate with Timepix readout Bart Verlaat, Nikhef LCTPC collaboration meeting DESY, 22 September
Detector Cooling Project Thermosiphon Project Status Report
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
IBL cooling status Pixel week 15 October 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Claudio Bortolin, Piotr Gach, Artur Szlachcic, Olivier Crespo.
DCP 12 May 2010 Jan Godlewski PH-DT-PO 1 DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO
VTCS overview 13 April 2006 NIKHEFBart Verlaat 1 NIKHEF involvement in VELO ~1 m module support CO 2 cooling detector "hood" kapton cables Vacuum vessel.
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
1 GL th IIF/IIR Gustav Lorentzen Conference on Natural Working Fluids Bart Verlaat National Institute for Subatomic Physics (NIKHEF) Amsterdam, The.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
IBL cooling thermal chock incident 15 October The IBL cooling team.
LHCb upgrade cooling Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
AIDA Traci commissioning LHCb – CO 2 cooling meeting 18 March 2015 Kamil Wojdyla, Lukasz Banasik, Nicola Spadavecchia, Tomasz Kucharski, Piotr Dziurdzia,
IBL cooling operation at bake-out IBL CO2 meeting 10 April 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Olivier Crespo Lopez 1.
Limits of the current VTCS Ann Van Lysebetten Bart Verlaat Martin van Beuzekom VELO upgrade meeting 14/11/2008 pix module construction kick-off 09/11/2009.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
IBL cooling branch layout and commisioning 6 febryuary 2014 Jan Godlewski, Bart Verlaat, Tomasz Blaszczyk, Eric Richards, Lukasz Zwalinski, Sven Vogt,
TRACI Status Meeting Overview of the TRACI 100-W CO 2 cooling machine Bart Verlaat 22 September
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
CO 2 Controlling a 2-phase CO2 loop using a 2-phase accumulator
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
LHCb-UT and Velo Upgrade Road to a system EDR in Q June 2015 Bart Verlaat 1.
IBL CO 2 cooling flexible transfer integration into IDEP 24 July 2013 Jan Godlewski, Bart Verlaat, Siegfried Wenig, Nicolas Massol, Tomasz Blaszczyk 1.
Overview of recent CO 2 cooling developments As an example for LHCb-Velo and UT cooling? Kick-off meeting 28 may 14 Bart Verlaat 1.
Status of the Marco chiller and Marco capacity analyses Bart Verlaat, Lukas Zwalinski, Maciej Osterga, Jan Godlewski MPI Munich,1 March.
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
H.-G. Moser, PXD Workshop, Valencia, January 2016 IBBelle for VXD 1 Use one unit first Assemble on a platform which fits in a 20’ container No redundancy.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
H.-G. Moser, PXD, July 12, 2016 IBBelle: Status & Plans 1 2-phase CO 2 cooling system for PXD and SVD Minimal temperature: - 40 o C (intended: -30 o C)
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
H.-G. Moser, April 25, 2016 Gemba Summary 1 Plan: Shipment (sea transport in summer) 6-8 weeks => arrival August/September Commissioning: After October.
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
IBBelle: Status & Plans
ATLAS ITk Baby-DEMO update
Detector Cooling Project WP2 CO2 activities status report
Flexible lines production and planning
Update on the IBL vacuum flex transfer lines
Teleconference ACS – FREIA 17th October 2017
IBL CO2 cooling control system development status
Teleconference ACS – FREIA 31st October 2017
ATLAS Thermosiphon Electrical Distribution and Run Modes
Update on the IBL vacuum flex transfer lines
IBBelle: Status Commissioning at MPP Transport to KEK
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
VELO Thermal Control System
13-block rotation schedule
CO2 Cooling IPNL Nick Lumb, 28/01/09.
McDonald’s Kalender 2009.
CO 2 CO2 Cooling for HEP experiments Bart Verlaat TWEPP-2008
McDonald’s calendar 2007.
February 2007 Note: Source:.
Teleconference ACS – FREIA 19th June 2017
McDonald’s calendar 2007.
UPPSALA UNIVERSITY_GERSEMI PROJECT
CO 2 CO2 COOLING FOR THE LHCB-VELO EXPERIMENT AT CERN Bart Verlaat
2015 January February March April May June July August September
Presentation transcript:

IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1

IBL CO 2 cooling sub units Several sub projects all with their own planning –Fluid systems: CO2 circulation plants (2x) CO2 accumulator Unit (1x) R404a chiller units (2x) Vacuum transfer line (97m) Junction box (1x) Manifold box (2x) Flex lines (14x) –Support systems Vacuum system –Electronics CO2 control cabinets (2x) Maintenance control cabinet (1x inside accu unit) Chiller control (2x, inside chiller units) Vacuum control cabinet (1x) 2 Inside USX Inside USA

Pump Assembly and commission approach Cooling system commissioning will be done via the junction box dummy load. Target for hardware installation =>September - December st circulation before xmas (cooling the xmas Champaign bottle!) Commissioning campaign January- April 2014 IBL cooling connection after IBL installation Cold tests with IBL from June to September 3 Cooling plant (2x CO2 + 1x accu + 2x chiller) Transfer line Junction box Manifold box Flex lines 3kW dummy heater

Current focus Current focus is on the hardware needed for junction box commissioning. –Fluid systems: CO2 circulation plants (2x) CO2 accumulator Unit (1x) R404a chiller units (2x) Vacuum transfer line (97m) Junction box (1x) Manifold box (2x) Flex lines (14x) –Support systems Vacuum system –Electronics CO2 control cabinets (2x) Maintenance control cabinet (1x inside accu unit) Chiller control (2x, inside chiller units) Vacuum control cabinet (1x) Commissioning is a length process: –Tuning of PID parameters –Make it work in full phase space of temperature and heat load –Test procedures like start-up, switch over, standby, back-out. 4 Needed for junction box commissioning Needed after IBL installation

Road to CO2 circulation Rough schedule of units (Everything will be directly installed in the pit): –CO2 plants: Nikhef delivery begin of September. Activities: Cabling and IO checks Possibility of local CO2 circulation using fill bottle as accumulator and small chiller as condenser –Accumulator unit end of September: Activities: Cabling and IO checks CO2 filling for specific accu tests –Chiller units delivery half October Activities: Cabling and I\O checks Direct connection to CO2 plant, circulation for test possible –Transfer line installation: 4 weeks in October –Installation of Junction box in October –Inter connection of units with orbital welding in November –1 st circulation of Junction box in December. See detailed planning in Excel file in this meetings indico. 5

Road to IBL cooling Commissioning via junction box and dummy load (January to April 2014). –Test all procedures –Tune parameters –Long duration testing During junction box commissioning focus on other hardware like –Vacuum system –Flex line integration –Manifolds IBL installation in March 2014 IBL to cooling connection in April-May 2014 –Flex lines will be installed after the IBL is in. IBL with cooling commissioning: June to September 2014 Beam pipe back-out October –When still alive IBL with cooling is ready for physics! See detailed planning in Excel file in this meetings indico. 6