CTF3 Streak Camera Results and Improvements Aurélie Rabiller BE-BI-PM 09.02.2012.

Slides:



Advertisements
Similar presentations
Lab 1 Paraxial Optics Lab in 106A. Look at paraxial optics rules Use a bi-convex singlet at 1:1 conjugates Do it double pass so can see image Lateral.
Advertisements

Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
Compton Experiment at the ATF Update since TILC09 Positron Workshop Durham 28-October-2009 Junji Urakawa instead of T.Takahashi KEK for collaborators.
Output to accelerator area drive laser: MHz, sync’d to master RF = 1064 nm ~7 ps pulses ~10 watts average (~120 nJ/pulse) chopper wheel: ~100Hz,
Two-dimensional and wide dynamic range profile monitor using OTR/fluorescence screens for diagnosing beam halo of intense proton beam Y. Hashimoto, T.
Photography Basics. The Process The Exposure - Camera and Lens Developing - Dark Room or PS… Printing – Darkroom or InkJet.
BSRT Optics Design BI Days 24 th November 2011 Aurélie Rabiller BE-BI-PM.
1 Fluorescence Cameras -Dr James Milnes -Live Cell Imaging – Stem Cell Research -Portland Place, London, 24 June 2009 Live Cell Imaging.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Camera Functions Shooting Mode ISO (film’s sensitivity to light) Meter (measures light in a scene and calculates proper exposure) Aperture ( controls the.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
FRITZ SCHNEIDERPEACHAM CYBERNETICS Introduction To Digital Photography II – Camera Features.
Camera Parts. 1. Body - Made of high grade plastic or metal, this holds all the other parts together as well as provide protection to the delicate.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
SPS Syncrotron Telescope Software specifications Aurélie Goldblatt BE-BI-PM
TPC/TRD DCS meeting, GSI, 27 Sep 2002Børge Svane Nielsen, NBI1 TPC laser system controls adjustable mirrors Laser Controls, Power, Cooling DCS: 1/ Laser.
Progress report on multi-OTR fabrication and schedule IFIC-SLAC  Design and Hardware fabrication  Realistic Optics and Beam Dynamics simulations  Controls.
04. November 2004 A. Freise A. Freise, M. Loupias Collaboration Meeting November 04, 2004 Alignment Status.
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo.
05/05/2004Cyrille Thomas DIAMOND Storage Ring Optical and X-ray Diagnostics.
Photography Seeing through the camera’s eye. Vocabulary Definitions Photography: the art or technique of exposing light to an electronic sensor or film.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Take a series of photos in manual mode to demonstrate an understanding of exposure and depth of field.
1 An investigation into the breakdown mechanisms of a triggered water gap switch Mohsen Saniei Institute for Energy and Environment University of Strathclyde.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
Exposure Factor 2: Aperture
Laser beam diagnostics : BEAMDIAG program. Stéphan Del Burgo CERN PS/LP 30 January 1998 DBS 01/
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
ASTA Accelerator Directorate Review Project Plan and ES&H Carsten Hast May 20, 2014.
1 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Update R. Corsini for the CTF3 Team 1.
Chapter 2: The Lens. Focal Length is the distance between the center of a lens and the film plane when focused at infinity.
In Photography, there is an Exposure Triangle (Reciprocity Theory) Aperture – size of the iris opening, how much light come into the “window” Shutter Speed.
IPBSM Operation 11th ATF2 Project Meeting Jan. 14, 2011 SLAC National Accelerator Laboratory Menlo Park, California Y. Yamaguchi, M.Oroku, Jacqueline Yan.
P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay.
3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee CERN, 18.December 2013 Uli Raich.
Bunch Numbering P. Baudrenghien AB/RF for the LHC/RF team.
Injector Options for CLIC Drive Beam Linac Avni Aksoy Ankara University.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Sensitivity of Virgo E. Tournefier (LAPP-CNRS) LSC-Virgo week May 23 rd,2007 LIGO-G Z.
Compressor Helium filled optional equivalent plane imaging laser beam dump hole in mirror for e-beam SSA and more.
Parts of the Camera What Do They Do?.
The machine status and operating mechanism of BEPCII CAO, Jianshe Institute of High Energy Physics, CAS April 16, 2013 The 4th Accelerator.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
Peter Križan, Ljubljana September 17, 2008 SuperB PID Peter Križan University of Ljubljana and J. Stefan Institute Forward PID: - SiPM as photon detectors.
ASTA Bunch Length Interferometer, et al… Randy Thurman-Keup ASTA Science Mtg Feb 21, 2014.
Four OTRs for ATF2 OTR History Current OTR setup New OTR design.
SESAME TL2 and SR Diagnostics
Camera Parts.
Installation new BTV HiRadMat from 2017
Phase Feed-Forward Piotr Skowroński (CERN)
Lab 1 Paraxial Optics Lab in 106A.
First Year of Operation at the Two-beam Test Stand
Parts of the Camera What Do They Do?.
Steering algorithm experience at CTF3
Commissioning plan for
TESLA Damping Ring: Injection/Extraction Schemes with RF Deflectors
Diagnostics for ThomX Nicolas HUBERT, Marie LABAT, Moussa EL-AJJOURI, D. PEDEAU, Synchrotron SOLEIL Iryna CHAIKOVSKA, N. DELERUE, LAL.
FCC ee Instrumentation
Digital SLR and viewfinder
TTF 01-Exposure & Stops.
Camera Parts.
20 camera parts of the Canon Rebel T3i
CLIC Feasibility Demonstration at CTF3
Drive Laser Commissioning Status
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Presentation transcript:

CTF3 Streak Camera Results and Improvements Aurélie Rabiller BE-BI-PM

Summary 2011 Measurements in CR, DL and CLEX Optical lines improvements Streak camera operation Discussion 2CTF3 streak camera - February 2012

Streak camera optical lines OTR light sources Synchrotron light sources DL lab CLEX lab CR lab 3CTF3 streak camera - February 2012

2011 Measurements Combiner ring: Bunch length stability and bunch spacing Bunch length: 200 ps window Turn 1 to Turn 4 ( ) Very few measurements this year due to the difficulties to operate the beam + Misalignment of the optical line Multi-turn bunch length stability (July) Bunch Spacing (July) Bunch spacing : 500 ps window Turn2 and 3 ( ) 4CTF3 streak camera - February 2012

CLEX: bunch length and bunch spacing Bunch length and bunch spacing along the train (July) Bunch length and bunch spacing along train: 25 ps/mm speed 2011 Measurements First measurements with the line done successfully Need more beam time to finish commissioning 5CTF3 streak camera - February 2012

Optical lines improvements Combiner ring: re-alignment of the lines => next week Delay Loop: re-aligned last year, shoud be ready for measurements (No measurements last year due to difficulties to send the beam in DL) CLEX: - addition of a light shielding => next month - replacement of the lens by an elliptical mirror => this year Third streak camera equiped with readout camera => ready => One streak camera for each lab 6CTF3 streak camera - February 2012

Operation of the streak cameras General procedure: spot adjustment in focus mode (no sweep) : the spot should be centered on the slit and as focused as possible slit reduced to mm (depending of the spot size and the light intensity) In Focus mode, the camera is really sensitive to light switch in sweep mode with the biggest time window (1ns) to find the train (trigger delays adjustment) Reduce step by step the time window with trigger and gain adjustment For this procedure, the presence in the lab is required 7CTF3 streak camera - February 2012

Old streaks: Manual control of shutter, slopes and gain => For the operation of old streaks, presence in the lab required no online values => data needed to be processed (Matlab or equivalent) New streak: automatic control of shutter, slopes and gain online bunch length value provided possibility to use cursors on the graphic window for rough bunch spacing values possibility to control the camera with LabView application Operation of the streak cameras 8CTF3 streak camera - February 2012

Online processing of the data (Labview application or else) Remote control of the cameras... Discussion 9CTF3 streak camera - February 2012