ATF2 Software Review LAL 18-20 June 2008 - SHORT SUMMARY - Philip Bambade ATF2 weekly meeting July 2 2008.

Slides:



Advertisements
Similar presentations
Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
Advertisements

Brett Parker* BNL-SMD *For the ATF2 Superconducting Magnet Upgrade Collaboration Update on SC Magnets and Schedule.
Coupling Correction in ATF2 EXT 7 th ATF2 Project Meeting, december 2008 C.Rimbault, LAL Orsay.
Beam position monitors LCABD Plenary meeting Bristol, 24th March 2009 A. Aryshev, S. T. Boogert, G. Boorman, S. Molloy, N. Joshi JAI at Royal Holloway.
C and S band BPM system update A. Aryshev, S. T. Boogert, S. Molloy, C. Swinson 5/25/20151ATF2 Software meeting.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
1 ATF2 Tuning and its application to ILC and CLIC FFS/IR region ASTeC and MAN : working together on tuning methods for the ATF2 and ILC IR/extraction design.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Status of very high priority beam tuning software Special ATF2 project meeting, Korea, 1 st October 2008 Cécile Rimbault, on behalf of High Priority task.
ATF2: the linear collider final focus prototype at KEK - an international telescope for nanometre size beams - Philip Bambade Laboratoire de l’Accélérateur.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
ATF2 commissioning in Autumn 2009 for discussion Philip Bambade LAL & KEK LCWS09 BDS session Albuquerque, New Mexico October 1, 2009 on behalf of the commissioning.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
A Brief Introduction of SAD for ATF2 Flight Simulator S.Kuroda(KEK) mini work shop for flight simulator(LAL)2008.
T. Okugi and M. WoodleyDecember 21, th ATF2 Project Meeting Summary of Session on Hardware/Devices for Commissioning.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
WP: Parameters and design. Plans from IFIC, Valencia Javier Resta López on behalf of the IFIC accelerator group ( IFIC (CSIC-UV),
Summary of Commissioning and Tuning session Philip Bambade LAL-Orsay 5 th ATF2 project meeting KEK, 21 December 2007.
ATF2 Optics for the Commissioning Toshiyuki Okugi, KEK 2008 / 10/ 22 ATF2 commissioning meeting.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
ATF-II Review by GDE Marc Ross, (SLAC) For GDE Project Managers: Nick Walker and Akira Yamamoto 24 January, th ATF2 Collaboration Meeting.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
Highlights and discussion at LAL FKPPL & FJPPL “Toshiko Yuasa” workshop Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay,
Technical Board “issues” Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4 April.
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
Global Design Effort SLAC contribution to ATF2 for discussions at S4 expanded meeting April 10, 2007.
ATF2 Software tasks: - EXT Bunch-Bunch FB/FF - IP Bunch-Bunch FB - FB Integration Status Javier Resta-Lopez JAI, Oxford University FONT meeting 1th August.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Design of the ATF2 FB/FF Systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group Final EUROTeV Scientific Workshop Uppsala, 25-27th.
Design and Simulation of Intra-train Feedback Systems at ATF2: Current Status and Future Plans Javier Resta Lopez (JAI, Oxford University) for the FONT.
July 2, th ATF2 Project Meeting Philip Bambade, Andrei Seryi, Toshiaki Tauchi Summary for TB.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
Multi-OTR Status A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White, J. Cruz SLAC aand KEK team.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
Upcoming Shift Work at ATF (November 26 – December 21, 2007) and Remote Participation from SLAC ATF training shifts proposal Rob Appleby (contact person,
22 th October 2010 IWLC Sources working group J. Clarke, T. Omori, L. Rinolfi, A. Variola Summary of Sources working group WG1 with contributions from.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
Plans for Laser-wire System Grahame Blair 21 st June 2005 Brief overview of UK LW programme ATF Extraction line LW Plans for this year ATF2.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
September 2008 F. Richard LAL/Orsay 1 News from ELAN SC of CARE CERN September 2008.
ATF2 Software Review LAL June 2008 Philip Bambade & Glen White ATF2 weekly meeting June
CERN, BE-ABP (Accelerators and Beam Physics group) Garcia, Pfingstner, Renier ATF operations training Report about the ATF operations training Hector Garcia.
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
Accelerator Physics Topics REPORT Philip Bambade LAL-Orsay LCWS 2005 Stanford, 22 March 2005.
Simulation of the α, dispersion, coupling and β multiknobs in large β optics Sha Bai, Philip Bambade, Benoit Bolzon, Javier Resta Lopez
Status of EXT coupling measurement analysis 9 th ATF2 project meeting C.Rimbault (LAL) S. Kuroda, T. Tauchi, N. Terunuma (KEK), G. White, M. Woodley (SLAC)
For discussion of ATF2 beam time requests SLAC team October 1, 2008.
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
ATF2 Software tasks: - EXT Bunch-Bunch FB - IP Bunch-Bunch FB - FB Integration Status and plans Javier Resta-Lopez JAI, Oxford University ATF2 commissioning.
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
ATF2 Status and Plans CLIC January 2016.
Status of ATF2 linear collider focus prototype emphasizing France-China joint contributions Philip Bambade Laboratoire de l’Accélérateur Linéaire Université.
Task 9.4 Beam Delivery System CERN, 27-Mar /3/2009
Special ATF Session - ATF/ATF2 day on 28th September -
Flight Simulator for ATF2
Glen White, SLAC Jan th ATF2 Project Meeting, KEK
ATF/ATF2 Control System
CLIC-ILC BDS & MDI work.
ATF2 review R. Tomas ATF2 review web:
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
Summary of Washington DOE Review
Presentation transcript:

ATF2 Software Review LAL June SHORT SUMMARY - Philip Bambade ATF2 weekly meeting July

Overall objectives Review requirements for ATF2 control & tuning software  Status ? Prioritise & organise software work as tasks within ATF2 collaboration Main sessions Introduction of project, commissioning plan and software requirements Review of on-going beam tuning simulation work Review of on-going control software development Planning of tuning software & controls interface Review of Flight Simulator project development  detailed & prioritised software task list to be shared broadly within ATF2 collaboration Flight Simulator teach-in session  demo + installation environments Organisation / management of software tasks & continued discussion Participants LAL & LAPP : Bambade, Bai, Brossard, Renier, Rimbault, White, Bolzon, Jérémie KEK : Kuroda, Okugi, Tauchi MAN + RHUL + UCL : Boogert, Gournaris + Webex (Oxford, CI, SLAC, CERN, KEK… )

Talks presented Introduction and aims of this meeting Overview of ATF2 goals and current construction status Expected hardware status + priority commissioning tasks Brief description of software task list being constructed A proposal to share & organise software work in ATF2 Overview of SAD tuning software and applications for ATF / ATF2 Organisation of ATF2 commissioning team Aspects of shift organisation in multi-partner team context Experimental procedure for IP beta-tuning / transport at 3 IP waists Tuning ATF2 at lower IP betas, goals and troubles FFS tuning with pre-calculated optical multi-knobs FFS trajectory correction algorithm & plans Experience with ATF EXT beta matching Fast feedback & FONT Integrated EXT+FFS dynamic & static BBA, feedback and tuning EXT dispersion and coupling correction update & V.4 ATF2 Optics (main new ATF2 EXT + FFS features) Laserwire & Cavity BPMs (s-band and c-band) High-availability power supplies for FFS IP Diagnostics & Summary of ATF controls infrastructure and KEK plans for ATF2 Link between ATF (VSYSTEM) and EPICS + further developments FFS Magnet mover system AML code development ATF2 Flight Simulator project & Description of software task list being constructed A user's first-time Flight Simulator experience at ATF in May Software Management issues and next steps P. Bambade, LAL T. Tauchi, KEK T. Okugi, KEK G. White, LAL & SLAC P. Bambade, LAL S. Kuroda, KEK T. Okugi, KEK P. Bambade, LAL S. Bai, LAL & IHEP R. Tomas, CERN Y. Renier, LAL T. Scarfe, Daresbury R. Appleby, Daresbury J. Resta Lopez, Oxford G. White, LAL & SLAC M. Woodley, SLAC S. Boogert, RHUL G. White, LAL & SLAC T. Okugi, KEK G. White, LAL & SLAC J. Nelson, SLAC S. Molloy, SLAC G. White, LAL & SLAC Y. Renier, LAL G. White, LAL & SLAC

A proposal to share & organise software work in ATF2 Define software task for given tuning / control goal as :  simulation study of concept & feasibility  application + control software specification and preparation  practical implementation in control room  update and improvement Team-driven responsibilities assigned throughout ATF2 collaboration by means of expressions of interest of institutes & individuals (supported by their institutes), including for the leader Task leader charged with coordinating the team and with reporting, later also prepare publication Large overlap with commissioning activity  reporting and management of software tasks within commissioning team led by Okugi Discuss completeness & appropriateness of task list, individual & group interests, possible assignments, overlap and commonalities among tasks In most cases, an individual can work on several tasks but should only lead one Taking on a task is both an individual & institute responsibility Ideal profile for task leader  PhD, post-doc or junior staff

General comments & what next ? Expressions of interest for software tasks  expected contributions to ATF2 from all or most collaborating institutes Some EoIs already made during meeting  more are being made now Software project list itself will also evolve as we progress EoI not just off-line simulation study  deliberate linkup to software tool for testing and implementation in the control room, by all collaborators EoIs strongly coupled to commissioning tasks, including also some hardware control software A main responsible or coordinator + convener per task will be named Agreement to pursue both “Flight Simulator” and traditional ATF control environment based on V-system  harmonious co-existence of dual scheme with common data base  aim to integrate into FS in future Tuning & control via FS shown feasible for (helped) first-time user ! EoIs for software & commissioning tasks will be discussed at next commissioning team meeting July 9, 2 pm KEK, 7 am CET  formation of some of the teams, led by the coordinators to be named