Atlas Gas Systems - CPC6 Upgrade and Re-Commissioning Infrastructure Meeting – 8th January 2014 Steve Pavis PH-DT-DI/Gas.

Slides:



Advertisements
Similar presentations
ALICE TPC Ne/CO2 Gas System. Mixing Rack CO 2 -Removal & (O 2,H 2 O)- Cleaning Rack.
Advertisements

2 Copyright © 2005, Oracle. All rights reserved. Installing the Oracle Database Software.
A new standard in Enterprise File Backup. Contents 1.Comparison with current backup methods 2.Introducing Snapshot EFB 3.Snapshot EFB features 4.Organization.
André Augustinus 16 June 2003 DCS Workshop Safety.
Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Oxford Jan 2005 RAL Computing 1 RAL Computing Implementing the computing model: SAM and the Grid Nick West.
Brian Martlew 25 th Sept 2006 MICE Control & Monitoring Plan Brian Martlew.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Database Infrastructure Major Current Projects –CDF Connection Metering, codegen rewrite, hep w/ TRGSim++ – Dennis –CDF DB Client Monitor Server and MySQL.
CERN IT Department CH-1211 Genève 23 Switzerland t Some Hints for “Best Practice” Regarding VO Boxes Running Critical Services and Real Use-cases.
FwSPY and UNICOS-CPC Benjamin Bradu Giulio Morpurgo CERN, EN-ICE May2015.
Legacy Remote I/O Upgrade to Ethernet
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Characterizing the Existing Network Designing and Supporting Computer Networks.
FireRMS SQL Audit, Archiving & Purging Presented by Laura Small FireRMS Quality Assurance.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
What if you suspect a security incident or software vulnerability? What if you suspect a security incident at your site? DON’T PANIC Immediately inform:
LHC Gas Control System Stefan Haider EP-TA1-GS ALICE DCS workshop, S.Haider2 Outline Introduction and working philosophyIntroduction and working.
Installing Windows Vista Lesson 2. Skills Matrix Technology SkillObjective DomainObjective # Performing a Clean Installation Set up Windows Vista as the.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
Analysis Modules F. Hahn. Goal of todays Meeting Inform about current status and layouts of the analysis modules. (the focus will be on common modules)
European Organization for Nuclear Research LHC Gas Control System Applications G.Thomas, J.Ortola Vidal, J.Rochez EN-ICE Workshop 23 April 2009.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
Ethernet IP solution for ATLAS IBL and CMS Pixel detectors CO 2 cooling plants Lukasz Zwalinski PH/DT/DI.
ALICE DCS Meeting.- 05/02/2007 De Cataldo, Franco - INFN Bari - 1 ALICE dcsUI Version 3.0 -dcsUI v3.0 is ready and will be soon posted on the ACC site.
SIMS Software Primary User Forums Autumn 2009 Welcome.
* Critical in the sense of fast intervention SIEMENS – CERN EN/ICE annual meeting Nuremberg, December the 13 th 2012 Industrial Controls Engineering Department.
 To help you understand and describe a range of methods for installing a new computer-based system; › Parallel › Phased › Direct › Pilot  Also, to help.
CERN Physics Database Services and Plans Maria Girone, CERN-IT
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
ALMA Archive Operations Impact on the ARC Facilities.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
19/02/2014A. D'Auria CERN/PH-DT-DI Maintenance ID flushing system:  Maintenance 2 dryers  Installation 2 flow meters  Maintenance of several hygrometers.
1 UNICOS PVSS Evolution Cryogenics Control Enrique BLANCO Industrial Controls & Electronics Group.
Chiller control system Lukasz Zwalinski – PH/DT.
Technical requirements The Test – testNAV 8 – As soon as the number of students and particular devices are known, these devices should be tested against.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Cscape EnvisionRV Horner APG, LLC. EnvisionRV - What Does it Do? Allows viewing and interacting with remote OCS controllers. The PC displays screens that.
GIF++ gas systems 11/07/2014Ernesto, Roberto PH-DT-DI gas service1.
ALICE TPC Gas Control System (toward the first fully implemented LHC gas system) S. Haider EP-TA1-GS.
Oracle for Physics Services and Support Levels Maria Girone, IT-ADC 24 January 2005.
“The LHC GCS Framework” Geraldine Thomas CERN, IT-CO A complete PLC and PVSS automatic code Generation.
60kW Thermosiphon control system
Industrial Control Engineering Infrastructure: EN/ICE needs Wrap up Mandate: WG Infrastructure to establish the needs for an ICE server pool and study.
26/03/2014L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI New recuperation system for n-Pentane:  Installation of the module in parallel of the first.
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
25/04/2014R. Guida, A. Wasem PH-DT-DI Gas1 Outline ALICE gas systems meeting Outline Introduction Review usage of ALICE gas M&O 2013 Review achievements.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
Active gas system status & plans. S.Konovalov, K.Zhukov, K.Vorobev.
Operations model Maite Barroso, CERN On behalf of EGEE operations WLCG Service Workshop 11/02/2006.
Thermo-siphon Control Design Lukasz Zwalinski – PH/DT Alexandre Moraux – PH/DT
External Data and DIP Oliver Holme 18 th January 2008.
Controls Software Migration Duplex Consoles. Goal of the MigrationGoal of the Migration –Move the accelerator controls system from Vax/VMS to PC/Linux.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
UNICOS-CPC course - CERN EN/ICE Industrial Controls Engineering Department Deployment of the CPC6 control application Marc Quilichini
- My application works like a dream…does it. -No prob, MOON is here. F
Real-time Software Design
Cross-site problem resolution Focus on reliable file transfer service
SNS Status Report Karen S. White 10/15/08.
Gas system Commissioning procedures and status
CV PVSS project architecture
Gas System Commissioning
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
TYPES OF SERVER. TYPES OF SERVER What is a server.
Charge 2. Equipment Protection 3. Definition and Documentation
Status Report and highlights from workshop II
Presentation transcript:

Atlas Gas Systems - CPC6 Upgrade and Re-Commissioning Infrastructure Meeting – 8th January 2014 Steve Pavis PH-DT-DI/Gas

Infrastructure Meeting – 8th January 2014 Steve Pavis PH-DT-DI/Gas Prior to the upgrade of any particular system, EN-ICE will send by to the relevant experiment personnel a reminder that the system is about to be upgraded (according to the planning that has already been agreed between PH-DT-DI and the various experiments). Upgrade and Re-Commissioning Procedure The PH-DT-DI/Gas site responsible will ensure that all preparations are made for the re-commissioning, along with the fact that the system may remain off for several days if not weeks. This may imply ensuring there is sufficient supply of backup purge gas for those systems where constant purge flow must be ensured at all times. On the day the upgrade begins, the PH-DT-DI site responsible will stop the gas system in readiness for EN-ICE to install the new system software, upgrade the PLC firmware and transfer the system to the Technical network. EN-ICE will need access to the gas surface building and so the site/gas system responsible should be present at least for the first half an hour or so. EN- ICE usually require approximately half a day to complete the various elements of the upgrade. During this time, PH-DT-DI/Gas will make upgrades to Pump chassis and flow readout PLC. Once EN-ICE have informed PH-DT-DI that the system is available for testing, PH-DT-DI will ensure that the system is brought to full and normal operation as soon as possible. Before Testing Begins:

Infrastructure Meeting – 8th January 2014 Steve Pavis PH-DT-DI/Gas I/O must be checked on a 20% basis for each profibus node (e.g. mixer, pump, distribution) as was performed for the original system commissioning and any sub-sequent additions. Upgrade and Re-Commissioning Procedure Alarm testing will be carried out on a 20% sample basis. Each module (mixer, Pump, Purifier) should be tested in all its relevant modes before testing the overall gas system in all of its normal operation modes (e.g. Run, Purge, Fill, Empty etc), checking that each module goes to its appropriate modes and sub-states. It is also important to check that the appropriate set-points are automatically applied by the system in the different modes of operation (e.g. mixer fill, run and purge flow set points and ratios), and that these set points are achieved and PID controller functionality behaves as normal. Brief Summary Of Tests To Be Performed :

Infrastructure Meeting – 8th January 2014 Steve Pavis PH-DT-DI/Gas Only registered users (including ‘monitors’, gas operators or gas experts) with TN access rights (handled by EN-ICE) will be able to open the GAS HMI (a list of names has been discussed) – access is achieved by performing one of the following actions : Upgrade and Re-Commissioning Procedure (i) From the GPN By performing a RD to a dedicated WTS (cerntsbe-Atlas) and from that WTS they will be able to open the GAS HMI. (ii) From the Atlas network PCs in the Atlas experiment, including GAS PCs in SG (which are connected to the Atlas network), the access will be done by doing an RD to ATLAS WTS followed by RD to the dedicated WTS to open the GAS HMI (double hop). Then, once migration is completed, the PCs in SG: 3170 R-0401 and US: ) zones will be removed. They will be replaced by Linux consoles (connected to the TN) which will be setup with local GAS HMI running on them to allow permanent access to the GAS systems. Remote Access Procedure to be used during the migration from Atlas network to TN network control infrastructure (before handshake is in place) :

Infrastructure Meeting – 8th January 2014 Steve Pavis PH-DT-DI/Gas Upgrade and Re-Commissioning Procedure Planning

Infrastructure Meeting – 8th January 2014 Steve Pavis PH-DT-DI/Gas Upgrade and Re-Commissioning Procedure Archiving CSC RPC TRT MDT TFC TGC Exp/ Aux/ PGC Start of Commissioning (January) End of Commissioning (May) WINCCOA 3.11 SP1 UNICOS CPC6 Local File Archive PVSS 3.8 SP1 UNICOS CPC5 ORACLE ARCHIVE ORACLE ARCHIVE with CPC5 Continuity (EN-ICE ORACLE DB) (Not maintained after move to EN- ICE ORACLE DB)