TE/MPE activities currently planed for YETS 2014-2015 Reiner Denz, Knud Dalherup-Petersen, Markus Zerlauth & Bruno Puccio YETS 2015-2016 coordination meeting.

Slides:



Advertisements
Similar presentations
TE-MPE-CP, RD, 03-Dec Quench Detection and Energy Extraction Systems R. Denz (Quench Detection), K. Dahlerup-Petersen (Energy Extraction Systems),
Advertisements

TE-MPE-TM 09/08/2012, TE-MPE-MS section WIC: Overview of on-going projects + Outlook to LS1 activities: - Short introduction to WIC systems - Booster renovation.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
Assumption University Thailand EE4503 Electrical Systems Design Main Circuit 1.
How to achieve higher redundancy of the UPS for QPS ? -The lack of redundancy concerns the supply lines from UPS to consumer but equally parts of the UPS.
A. Siemko and N. Catalan Lasheras Insulation vacuum and beam vacuum overpressure release – V. Parma Bus bar joints stability and protection – A. Verweij.
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
Changes in QPS R. Denz, TE-MPE-EP MPP workshop Acknowledgements: K. Dahlerup-Petersen, V. Froidbise, S. Georgakakis, B. Magnin, C. Martin, J.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
TE/MPE/EE Short ‘Halfway’ Update ELQA – LS1 Activities MPE/The Electrical Engineering section Knud, on behalf of TE/MPE/EE – 20 September LSC Reminder:
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
TE-MPE-EP, RD, 26-Aug Workshop on QPS Software Layer Hardware / Agents R. Denz, TE-MPE-EP.
Machine Interlocks Upgrading MPE workshopChristophe MARTIN14 th Dec
13 kA Energy Extraction LHC machine Gert Jan Coelingh – Knud Dahlerup-Petersen – TE/MPE/EE.
QPS R2E Status R2E Internal Meeting, October 24 th 2013Discussion 1 LS1 developments Digital Quench Protection insertion region magnets Delivery/installation.
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
LHC Beam Operation WS – Evian June 4 th 2014 Matteo Solfaroli Powering Tests - machine status coming out of LS1 Matteo Solfaroli & Mirko Pojer on behalf.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
MP3 List of main Issues during March 2010 MP3 - Team.
TE-MPE-CP, RD, LHC Performance Workshop - Chamonix Feb R. Denz TE-MPE-CP on behalf of the QPS team QPS Upgrade and Re-commissioning.
Quench Detection System R. Denz TE-MPE-EP on behalf of the QPS team.
TE/MPE/EE Summary of Electrical Engineering Session Ed & Knud K. Dahlerup-Petersen TE/MPE/EE 23 November RB – RQ EE facility consolidation & upgrades.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Overview of the LHC Year End Technical Stop
New projects, priorities and main objectives for /12/15 TE-MPE Annual Meeting1.
AT-MEL Group Meeting, CERN, 1211 Geneva 23 1 ElQA activities during hardware commissioning N. Catalan Lasheras.
B.Puccio MPE Workshop for LS1 / 22 & 23 Nov Logistics for DYPB activities Bruno PUCCIO (TE/MPE)
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
TE-MPE, MPE Workshop 2010, G.D’Angelo, 14-Dec TE-MPE on-call service for the LHC Giorgio D’Angelo on behalf of TE-MPE On call team, with inputs.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
MPP Workshop Status of Powering Interlocks I. Romera on behalf of MPE-MS MPP Workshop, 12 June 2015, I. Romera (TE-MPE)1.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
TE-MPE-CP, RD, 12-Dec QPS - analysis of main problems, areas to target, possible improvements R. Denz, TE-MPE-CP Evian 2011.
Closing session Issues and questions from the audience and some from me Rüdiger Schmidt.
Training LHC Powering Robin Lauckner Software Tools for Commissioning Robin Lauckner 28 th March, 2007.
Felix Rodriguez Mateos TE/MPE-EE 2 Electrical Performance of LHC Magnet Circuits F. Rodriguez Mateos, TE/MPE-EE Chamonix 2016 Session 3: LHC Hardware.
CERN TE-MPE-EP, RD, 09-April Quench Protection Systems (QPS) for the LHC R. Denz, TE-MPE-EP Acknowledgements: K. Dahlerup-Petersen, A. Siemko, J.
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
Machine Protection Review, Markus Zerlauth, 12 th April Magnet powering system and beam dump requests Markus Zerlauth, AB-CO-IN.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
S A Griffiths CM42 June 2015 Electrical & Control.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
Mikhail Ovsienko TE-MPE-EE
TE-MSC-SCD EYETS th September, 2017.
Giorgio on behalf of ELQA team
TE-MPE LS1 review Vision from EN-EL(CF)
Nikolaos TRIKOUPIS on behalf of TE-CRG-CI CRG-TM for LS2 preparation Preliminary activities of the CI section 25/09/2017
Powering the LHC Magnets
J. Uythoven for the MPE-MI & MS Teams
MPE main activities planned for LS2
LS1 TE/MPE/EE CABLE ACTIVITIES
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
Presentation transcript:

TE/MPE activities currently planed for YETS Reiner Denz, Knud Dalherup-Petersen, Markus Zerlauth & Bruno Puccio YETS coordination meeting of 6 th October 2015 for LHC 1

QPS Installation & commissioning of radiation tolerant detection systems for 600 A circuits in RR13,17,53,57,73 and 77 Installation & commissioning of new detection systems for circuits RU.L4 and RU.R4 (‘undulator’). Activity in conjunction with the upgrade of the corresponding current sensors performed by EE team during TS#3 Possible upgrade of the firmware for the nQPS DAQ systems allowing easier recovery from local bus errors (to be confirmed 436 units concerned). Locations: 8 sectors Installation of a test system for the measurement of conical joints in the warm 13 kA circuits. Installation of a test system for the measurement of conical joints in the warm 13 kA circuits. Location: UA23 (t.b.c.) Requires lock-out and grounding of the associated power converter. All DQHDS will be switched off during the YETS. Locations: 8 sectors (for information : the QPS team foresees as well a test of the QPS interlocks) YETS coordination meeting of 6 th October

Energy Extraction systems General and specific overhaul of the 32 installations of energy extraction in the LHC main dipole and quadrupole circuits. Locations: UAs (even points), RRs (13,17,53,57,73,7) & R34, R37 Requires lock-out and grounding of the associated power converters. Supervision of a general overhaul of the energy extraction breakers of the ‘Atlas’ powering circuits for the superconducting Solenoid and Toroid. This task will be performed by an IHEP team of specialists. Location: Atlas (“power cavern”) YETS coordination meeting of 6 th October

ELQA Study of a possible relocation in point 6 of the CL heater sources and the Proximity Equipment related to a possible displacement of the RQ5.L6 quad. Checking and re-making, if required, the signal transmission line from the DQLCT of B23.L7, heater #1. ELQA investigations of the earth fault on the circuit RCS.A78B2 (near DFB). Decision to be taken by LMC after recommendations by MP3. ELQA integrity verifications at the end of YETS: The campaign will depend on the temperature variations and the interventions on the circuits. A minimum could be HVQ of the three main circuits => No co-activities in parallel YETS coordination meeting of 6 th October

BIS Displacement of multiple socket-outlet blocks (reglettes) in all cases these units prevent the access to the VME redundant power supplies (namely ‘Wiener’ P.S.) (to be coordinated with EN-EL). Locations: all UAs, US15, UJ33, USC55, TZ76, SR2 and SR8 YETS coordination meeting of 6 th October WIC WIC upgrade to new generic code base : remote download followed by (partial) re-commissioning of the system – max half a day / point…. Locations: US15, UA23, UJ33, UA47, USC55, US65, TZ76 & US86

YETS coordination meeting of 6 th October Various SW upgrades (e.g. FMCM FESA class, QPS Swiss Tool, ACCTESTING,…) Misc. SMP system (Safe Machine Parameters) Replacement of the VME-bus master module family : ‘RIO3’ type replaced by ‘MenA20’ type (this depends on successful lab tests still to be confirmed) Location: CCR

YETS coordination meeting of 6 th October

TS#3 ( from 9 to 13 November) Campaign of retightening of all electrical power connections around the circuit breakers of the heater power sources in the crates housing the lead head heater circuits. To be applied at all DFBs of the LHC. Checking the conformity of the wiring circuits between the heater sources /regulators and the heater elements at the CL head. To be applied at all DFBs of the LHC. YETS coordination meeting of 6 th October Installation/connection of two new pre-manufactured 600A bus-bars for DCCT and LEM current measurements aimed at an enhanced current reading for the ‘undulator’ circuits (RU) in point 4R and 4L. Requires lock-out and grounding of the two associated power converters.