Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.

Slides:



Advertisements
Similar presentations
Attachment 5. Environmental Compliance EPA Regulations March
Advertisements

EPA’s Clean Power Plan Proposed Rules for Reducing GHG Emissions from Power Plants Presentation to ACPAC June 16,
Addressing New Environmental Regulations John N. Voyles, Jr. Vice President, Transmission & Generation Services KIUC Annual Energy Conference, March 2014.
CAIR & MATS 2012 Southern Sectional AWMA Annual Meeting & Technical Conference September 12, 2012 Chris Goodman, P.E. Environmental Strategy.
Emissions Reductions Beyond the Clean Smokestacks Act (CSA) Emissions Reductions Beyond the Clean Smokestacks Act (CSA) Environmental Management Commission.
Update on EPA Activities MOPC July 15-16, Current Known Impacts –Retirements –De-ratings –Outage Impact Studies Proposed Clean Power Plan 2 Topics.
The Massachusetts Approach to Power Plant Clean-up Policy Making and Standards Setting to Reach Clean Air Sonia Hamel Massachusetts Executive Office of.
Recent EPA Regulation Development Presented by Bill Luthans to the 56 th Meeting of the Joint Advisory Committee Meeting for the Improvement of Air Quality.
NRG’s Huntley Plant and a Just Transition Risks Facing Coal-Fired Generators in 2014 and Coming Years David Schlissel Director of Resource Planning Analysis.
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
ERCOT PUBLIC 4/22/2014 Updates for 2014 LTSA Scenario and Data Assumptions 4/22/2014.
ERCOT PUBLIC 7/10/ LTSA Scenario Development.
ERCOT PUBLIC 2/14/ LTSA Scenario and Data Assumptions February 14, 2014.
ERCOT PUBLIC 3/25/ LTSA Scenario and Data Assumptions March 25, 2014.
Texas Lignite Industry. Texas Lignite  Because >95% of lignite mining operations in Texas are in support of electric generation…..whatever impacts the.
Licking County Energy Summit Pat O’Loughlin Buckeye Power Powering the Future of the Region’s Economy.
CHEAPER AND CLEANER: Using the Clean Air Act to Sharply Reduce Carbon Pollution from Existing Power Plants, Delivering Health, Environmental and Economic.
Robert L. Burns, Jr., Esq. Buchanan Ingersoll & Rooney PC August 1, 2013 Impact of Environmental Regulation on Coal Combustion for Electrical.
Star Symposium 2013 The Changing Reality of Energy Development Jeffery LaFleur, Vice President Generation Assets APCO/KYPCO October 22, 2013.
ACC Open Meeting – November 18, 2010 Four Corners Power Plant 1.
Overview of Environmental Regulations and Drought Impacts in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT July 13, 2015.
Overview of Environmental Regulations Potentially Affecting Power Industry Susana M. Hildebrand, P.E. Presented to LTSA, ERCOT July 13, 2015 Confidential.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
2010 Special Reliability Scenario Assessment: Resource Adequacy Impacts of Potential U.S. Environmental Regulations John Moura Technical Analyst, Reliability.
Ben Fowke Chairman, President and CEO Xcel Energy Today’s Energy Outlook.
ERCOT PUBLIC 6/17/ LTSA Scenario Results June, 2014.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
OPTIONS FOR STATES IMPLEMENTING CARBON STANDARDS FOR POWER PLANTS ARKANSAS STAKEHOLDER MEETING MAY 28, 2014 FRANZ LITZ PROGRAM CONSULTANT.
Electric Reliability and the Clean Power Plan Branden Sudduth Director, Reliability Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
IPM Overview Elliot Lieberman U.S. Environmental Protection Agency Washington, D.C
EPA’s Final Clean Power Plan: Overview Steve Burr AQD, SIP Section September 1, 2015.
Colorado Renewable Requirements, Policies, and Projects James Tarpey, Esq. Commissioner Colorado Public Utilities Commission 1560 Broadway, Suite 250 Denver,
The Texas Renewable Energy Program National Governors Association Scottsdale, Arizona April 29, 2004.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
Wind Energy Update Larry Flowers National Renewable Energy Laboratory November 30, 2007 Salt Lake City, UT.
Regional Haze Rule Best Available Retrofit Technology Government to Government Consultation Navajo Nation Environmental Protection Agency.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
Assessment of Mercury Rules for Electric Generators in North Carolina September 9, 2015 Presented to the Environmental Management Commission – Air Quality.
EPA Cooling System Regulations Hall of States Briefing February 22, 2011.
Environmental Issues in System Planning Jim Platts – ISO New England NARUC Summer Meeting – New York City July 15, 2007.
EPA’s Clean Power Plan: Compliance Options and Engagement Opportunities Vicki Arroyo, Executive Director Gabe Pacyniak, Mitigation Program Manager Lissa.
Massachusetts’ 4-Pollutant Power Plant Regulations Sharon Weber Massachusetts Department of Environmental Protection Air Innovations Conference - August.
A Brave New World Cathy Woollums, SVP, Environmental and Chief Environmental Counsel NASUCA Mid-Year Meeting – June 2, 2014.
CLEAN POWER PLAN PROPOSAL Reducing Carbon Pollution From Existing Power Plants Kerry Drake,Associate Director Air Division, US EPA, Region 9 California.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Clean Power Plan – Now What? OCTOBER 16, 2015 FALL PR-MR & MARKETING MEETING.
Clean Power Plan TENNESSEE MINING CONFERENCE AGENDA November 3, 2015 John Myers Director, Environmental Policy and Regulatory Affairs.
Puerto Rico Electric Power
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
FINAL CLEAN POWER PLAN Before the Virginia Energy Efficiency Council Virginia Department of Environmental Quality November 12, 2015.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
Environmental Benefits of Renewable Portfolio Standards in an Age of Coal Plant Retirements September 10 th, 2015 Energy Policy Research Conference Denver,
Rules and Exceptions - The Costs of “Cheap” Coal.
Highly Confidential / Proprietary MARC 2010 CONFERENCE Know When to Hold Em and Know When to Fold Em Session By Scott Heidtbrink Senior VP - Supply June.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
2006 Report on the Capacity, Demand, & Resources for the ERCOT Region Technical Advisory Committee June 1, 2006 Kenneth A. Donohoo. P.E. Manager, Transmission.
ERCOT PUBLIC 5/20/ LTSA Current Trends Scenario Results May 20,2014.
111D OPTIONS AND OPPORTUNITIES FOR MISSOURI David Weiskopf Sustainable Energy Fellow Natural Resources Defense Council October 28 th.
Clean Power Plan – Understanding the Implications for Regional Energy Delivery Kevin Gunn Midwest Energy Policy Conference October 6, 2015.
Clean Power Plan EW Tim Wilson Director of Energy Supply Services.
© 2015 Haynes and Boone, LLP Overview of the EPA Clean Power Plan Suzanne Beaudette Murray February 19, 2016 Tulane Environmental Law Summit.
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
Clean Power Plan Kyra Moore Director, Air Pollution Control Program Prepared for: Midwest Energy Policy Conference October 6, 2015.
PJM: Managing Grid Evolution Through Markets
Regional Implications of the Clean Power Plan Lanny Nickell Midwest Energy Policy Conference October 6 th,
LTSA Scenario Development Workshop
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
Wind Industry Market and Policy Overview
Department of Environmental Quality
Status of Regional Haze Rule
Presentation transcript:

Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016

1 Background Current Resource Mix and Generation Development in ERCOT Environmental Regulations Grid Simulation Methodology and Results Potential Grid Impacts Agenda

2 In December 2014, ERCOT evaluated the potential impacts of pending environmental regulations, including the proposed Clean Power Plan, on grid reliability On August 3, 2015, EPA released the Clean Power Plan final rule –The final rule made adjustments to magnitude and timing of the carbon dioxide (CO 2 ) emissions reductions for Texas –The requirements for Texas in the final rule are less stringent compared to the proposal ERCOT updated its analysis of the potential impacts of the Clean Power Plan for grid reliability based on the changes in the final rule Background

3 Current ERCOT Resource Mix

4 Coal Capacity by Age and Controls SCR = Selective catalytic reduction SNCR = Selective non-catalytic reduction

5 Generation Development in ERCOT Information available at the Resource Adequacy page on the ERCOT web-site:

6 Projected Reserve Margins (Dec CDR) *To be eligible for the CDR, projects must have signed interconnection agreements, applicable air permits and proof of adequate water.

7 Cross- State Air Pollution Rule (CSAPR) Mercury and Air Toxics Standards (MATS) Ash Disposal Rule Clean Water Act Section 316(b) Regional Haze Federal Plan Clean Power Plan Environmental Regulations April 2015 Jan 2015; 2017* July ** ; 2030 Compliance Date: Addresses cross-state air pollution through a cap and trade program Sets limits on hazardous air pollutant emissions at power plants Requires controls to limit impacts to aquatic life at cooling water intake structures Requires controls on air emissions to improve visibility in national parks Sets carbon dioxide emissions limits for existing units Places requirements on disposal of coal ash *Proposed CSAPR update rule would take effect beginning in January **Longer timeframes for facilities required to close. Does not include the Steam Electric Effluent Limitation Guidelines (ELG) rule, which has compliance dates between There are several proposed and recently finalized environmental regulations that could impact grid reliability in ERCOT: Coal units Natural gas units Costs to: Color key: No costs Moderate costsHigh CostsLow costs

8 Big Brown 1, 2 Sandow 4 Limestone 1, 2 Coleto Creek San Miguel Martin Lake 1, 2, 3 Monticello 1, 2 Monticello 3 Regional Haze Affected Units in ERCOT

9 Sets limits on the amount of CO 2 that existing power plants can emit to the air Sets interim and final CO 2 emissions limits: –Three interim limits must be met on average between , , and –Final limit must be met from 2030 onwards States may choose to comply with either the rate (lb CO 2 /MWh) or mass (tons CO 2 ) form of the limit Clean Power Plan Requirements for Texas

10 Used ERCOT stakeholder-vetted methodologies consistent with ERCOT’s Long Term System Assessment (LTSA) Modeled four primary scenarios: Modeled the Clean Power Plan mass-based requirements for ERCOT as a limit and as an emissions fee –Scenario with emissions limit allows model to select the least-cost way to achieve compliance –Scenarios with emissions fees simulate a potential approach to achieve compliance, and allow an initial assessment of likely increases in wholesale power prices Modeled Regional Haze by adding costs of scrubber retrofits or upgrades for affected units Included an additional scenario to assess the impacts of energy efficiency Simulation Methodology Scenario Regulations Included in ScenarioCO 2 Price ($/ton) CSAPRCPPRegional Haze Baseline n/a 2. CO 2 Limit n/a 3. CO 2 Price $1.00$ CO 2 Price & Regional Haze $0.00$21.00

11 Coal Unit Retirements At least 4,000 MW of coal unit retirements due specifically to the Clean Power Plan Additional coal unit retirements when Regional Haze is considered, likely to occur before the Clean Power Plan compliance timelines Grid Simulation Results Renewable Energy Growth Up to 23,000 MW of solar and wind additions in scenarios with the Clean Power Plan, resulting in almost 44,000 MW total intermittent renewable capacity Increases compared to previous CPP study due to updated capital cost assumptions

12 Resource Adequacy: if future unit retirements occur without sufficient notice for the market to respond with new investment, there could be periods with reduced reserve margins and increased risk of system scarcity events. Transmission Reliability: the retirement of legacy units may result in localized transmission constraints that may affect transmission reliability and grid congestion. –Transmission improvements require four to five years for planning, routing approval, and construction. –Reliability-Must-Run contracts may not be an option if units are retired for environmental compliance reasons. Renewables Integration: while ERCOT has been very successful at integrating renewable generation, grid operations with the levels of renewables seen in future scenarios will be a challenge. At high levels of renewable penetration, any must-take requirements on renewable output to achieve environmental compliance goals could affect grid reliability. Possible Grid Impacts

13 CREZ Reactive Study Questions?