2 American River Common Features General Re-evaluation Report Request for Board Approval of Letter Requesting Consideration of Locally Preferred Plan (LPP)

Slides:



Advertisements
Similar presentations
BUILDING STRONG ® Do not include this Slide. This template is a guide for preparing power points presentations. The information requested is important.
Advertisements

Central Valley Flood Protection Board Meeting – Agenda Item No. 5C Central Valley Flood Protection Board.
US Army Corps of Engineers BUILDING STRONG ® Public Law 84-99, Rehabilitation and Inspection Program Mike deMasi Chief Emergency Management, PL Program.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
Draft Action Plan Update – Agenda Item No. 5D Central Valley Flood Protection Board.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7A APPLICATION NO
1 Ocean View Shoreline Project Update Overview for Norfolk City Council January 7, 2014.
Sacramento District Regional Vegetation Variance Paige Caldwell, P.E. Emergency Manager.
Central Valley Flood Protection Board Meeting – September 27,
TRLIA Certification of Environmental Impact Report and Selection of Project for Feather River TRLIA Board Meeting: February 6, 2007 Briefer: Paul Brunner,
Flood Risk Management Program Ed Hecker, Chief, Office of Homeland Security National Levee Summit February 2008 St Louis, MO.
Central Valley Flood Protection Board Meeting – Agenda Item No. 13B.
SUTTER BUTTE FLOOD CONTROL AGENCY Supplemental Presentation on Variances and Encroachments Feather River West Levee Project Project Area C May 24, 2013.
Agenda Item 9 Sutter Bypass CVFPB Meeting April 17, 2009.
California’s Central Valley Flood System Improvement Framework California Levees Roundtable March 27, 2009 California Levees Roundtable March 27, 2009.
Engineer Circular Requests to Alter USACE Projects
Hydraulic Screening and Analysis Needed for USACE Review
Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11.
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Project Planning with the U.S. Army Corps of Engineers (USACE) Presenter Name Presenter Title.
Seattle District Seattle District U. S. Army Corps of Engineers U. S. Army Corps of Engineers.
Central Valley Flood Protection Board Meeting – Agenda Item No. 10A APPLICATION NOS and
Acquisition of Flood Control Easements Triangle High-Ground Area City of West Sacramento, Yolo Co. Meeting of the Central Valley Flood Protection Board.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
Module 22 STEPS 11, 12, 13 & 14 Washington Level and Administration Review Processes Module 22 STEPS 11, 12, 13 & 14 Washington Level and Administration.
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
Savannah Harbor Expansion Project
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
US Army Corps of Engineers BUILDING STRONG ® SAFCA Board Update Dan Tibbitts Senior Project Manager Common Features Levee Programs Branch Sacramento District.
Central Valley Flood Protection Board Meeting – Agenda Item No. 4E APPLICATION NO
CVFPB Executive Committee Meeting – Agenda Item No. 8A Central Valley Flood Protection Board.
Central Valley Flood Protection Board Meeting – December 20,
Central Valley Flood Protection Board August 9, 2013 Presented by: Michael Mierzwa California Department of Water Resources DWR’s Involvement in Flood.
CALIFORNIA DEPARTMENT OF WATER RESOURCES Preparations for Flood Season DFM Flood Maintenance Office Presented By: Noel Lerner, Former Chief Flood.
1 Slide1 Examples in Communicating Flood Risk: National Flood Risk Management Initiative Presentation to National Flood Risk Management Policy Summit U.S.
August 28, 2015 Meeting of the Central Valley Flood Protection Board Dave Wheeldon, Chief Flood System Sustainability Branch FMO, Division of Flood Management.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
DWR Maintenance Area Response to USACE Periodic Inspections Presented by: Noel Lerner, Chief, Flood Maintenance Office Mark List, Chief, Maintenance Support.
US Army Corps of Engineers Chicago District FY04tpr\skbcongressional Civil Works Program Missions Missions Process Process Select Authorities Select Authorities.
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
Central Valley Flood Protection Board Meeting – Agenda Item No. 6B APPLICATION NO
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
US Army Corps of Engineers Sacramento District BUILDING STRONG ® SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE Marshall Marik Project Manager South Sacramento.
Melinda Terry, Executive Director CA Central Valley Flood Control Association 1.
Yuba County Comprehensive Flood Protection Program
Presented to: Central Valley Flood Protection Board August 23, 2013 Sacramento Area Levee Accreditation Key Results from Encroachment Analysis.
1 Natomas Levee Improvement Program Crediting Issues Before the Central Valley Flood Protection Board February, 2009 Sacramento Area Flood Control Agency.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
US Army Corps of Engineers BUILDING STRONG ® Emergency Response Policy Revision Update ( ER & EP ) Jeffrey Jensen CECW-HS USACE Flood Risk Management.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7D Methylmercury Open Water Workplan.
Central Valley Flood Protection Board Meeting – Agenda Item No. 8A Informational Briefing Presented By Board Staff and CH2MHill Consultants Model Funded.
Central Valley Flood Protection Board Meeting – Enforcement Report 1.
2 West Sacramento, California Project General Reevaluation Report Letter of Support for the West Sacramento General Reevaluation Report Agenda Item 4G:
Central Valley Flood Protection Board October 25, 2013 Presented by: Michael Mierzwa, P.E. Chief of the FloodSAFE Program Management Office California.
US Army Corps of Engineers Sacramento DistrictIntroductionIntroduction Sacramento River Bank Protection Project: Phase II Supplemental Authorization –
CVFPB Executive Committee Meeting – Agenda Item No. 8A Central Valley Flood Protection Board.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7C.
CVFPB Executive Committee Meeting – Agenda Item No. 4C Central Valley Flood Protection Board.
Central Valley Flood Protection Board Meeting – Enforcement Report 1.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
June 24, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council.
US Army Corps of Engineers BUILDING STRONG ® Miles City, Montana Section 205 Gwyn M. Jarrett - Project Manager Omaha District April 27, 2016.
June 13, 2013 Presented by: California Department of Water Resources Flood Management Programs Status and Interactions.
BY ROY KROLL & COLIN KARK DIVISION of FLOOD MANAGEMENT FLOOD MAINTENANCE OFFICE.
Central Valley Flood Protection Plan Senate Bill 5 Amendments
Feather River West Levee Project Project Area C May 24, 2013
Presented By: Fran Borcalli, P.E. Program Manager
SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE
Sacramento Environmental Commission January 2019.
K Street, Sacramento – 1861/1862 Flood
Presentation transcript:

2 American River Common Features General Re-evaluation Report Request for Board Approval of Letter Requesting Consideration of Locally Preferred Plan (LPP) Ajala M. Ali Project Manager USACE / CVFPB Studies Section Agenda Item 10A Resolution October 25, 2013

Sponsors Federal Sponsor: United States Army Corps of Engineers Sacramento District (USACE) Non-federal Sponsors: Central Valley Flood Protection Board (Board) Sacramento Area Flood Control Agency (SAFCA)

2 1. Approves a letter indicating the Non-federal Sponsor’s request for a Locally Preferred Plan Waiver for the American River Common Features General Re-evaluation Report. 2.Delegate to the Executive Officer authority to sign the Letter. Requested Board Action

GRR Vicinity Map The American River Common Features GRR: Evaluate levee improvement alternatives for the Sacramento area. 1.American River North Basin 2.American River South Basin 3.Natomas Basin Determine the extent of the federal interest. Natomas American River South American River North

GRR Background 1996Initial Congressional authorization for ARCF 2007Initiated GRR Effort directed toward Natomas Basin resulting in a Post Authorization Change Report (PACR) 2010District Approval of 104 credit eligibility; Completed PACR Chief’s Report Re-initiated the GRR to evaluate remaining basins

Natomas PACR Natomas PACR elements: Identified federally recommended plan Vegetation variance Section 104 credit Levee raises deferred

Current Focus of GRR Address deficiencies in American River North and South Basins to include: Seepage, stability, erosion, and levee height Levee vegetation Levee access American River South American River North

USACE Planning Requirements for GRR 8 USACE identifies National Economic Development (NED) Plan Non-federal sponsors identify LPP If LPP deviates from NED, LPP waiver may be required

Proposed NED NED Plan elements: Address seepage & stability Implement extensive erosion protection programs Raise levees Remove vegetation from upper 2/3 of levee Acquire landside access along Sacramento River and Arcade Creek

Proposed LPP LPP differences from NED: Address seepage and stability issues first Significantly less erosion remediation Levee raises Widen the Sacramento Bypass & Weir Systemwide Improvement Framework (SWIF) for low risk vegetation, encroachments, and landside access issues

2 Staff Recommendation Approve Resolution No which: 1.Approves a letter indicating the Non-federal Sponsor’s request for a Locally Preferred Plan Waiver for the American River Common Features General Re-evaluation Report. 2.Delegate to the Executive Officer authority to sign the Letter.

Questions? CVFPB / DWR Ajala M. Ali, Project Manager USACE David McDaniel, Chief Levee Programs Branch SAFCA Pete Ghelfi, PE, Director of Engineering