Page 1 PACS NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Issues with Photometer Data & How to Resolve them with HIPE Tools Kevin Xu.

Slides:



Advertisements
Similar presentations
Bruno Altieri September # 1 PACS photometer pipeline overview Bruno Altieri (ESA/HSC)
Advertisements

Data Processing Workshop ESAC, Madrid, Spain 20 – 24 February 2012 Stephan Ott VG #1 PACS Overview and the latest developments.
ASI Review Padova ICC Contribution 1 WP3000 : Padova ICC Contribution Mattia Vaccari & Giulia Rodighiero & Gabriele Mainetti Department of Astronomy -
- page 1 NHSC PACS Web Tutorial PACS-401 NHSC/PACS Web Tutorials Running PACS Photometer pipelines PACS-401.
NHSC SPIRE Webinar Q/A Session 20 th Nov 2013 Archive Query and Data Retrieval SPIRE Question and Answer Session Bernhard Schulz NHSC/IPAC.
Viewgraph 1 S. Ott Herschel Data Processing System NHSC Herschel Data Processing Workshop 26th August 2013 Overview of the Herschel Data Processing System.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 SPIRE Photometer Data Reprocessing Bernhard Schulz (NHSC/IPAC) on.
PACS NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 SPIRE Day team, goals, schedule, logistics Bernhard Schulz NHSC/IPAC.
ASI Review Padova ICC Contribution 1 WP3000 : Padova ICC Contribution Staff Alberto Franceschini (AF) [Professore Ordinario] Giulia Rodighiero (GR) [Ricercatore.
PACS NHSC SPIRE Point Source Spectroscopy Webinar 21 March 2012 David Shupe, Bernhard Schulz, Kevin Xu on behalf of the SPIRE ICC Extracting Photometry.
PACS Page 1 NHSC Data Processing Workshop – Pasadena Sept 10-14, 2012 SPIRE Spectrometer Data Reduction: Mapping Observations Nanyao Lu NHSC/IPAC (On behalf.
SPIRE Consortium Meeting La Palma, Oct. 1 – SPIRE FTS Pipeline Trevor Fulton Blue Sky Spectroscopy, Lethbridge, Canada.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 Introduction to HIPE 12.1 (Part 2) Bernhard Schulz (NHSC/IPAC) on.
PACS NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Photometer Extended Source Photometry Bernhard Schulz NHSC/IPAC on behalf of the SPIRE.
1 NHSC PACS NHSC/PACS Web Tutorials Running PACS photometer pipelines PACS-202 (for Hipe 9.0) Level 0 to Level 2 processing: From raw data to calibrated.
Page 1 PACS NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Overview of SPIRE Photometer Pipeline Kevin Xu NHSC/IPAC on behalf of the SPIRE.
NHSC Workshop August 2013 NASA Herschel Science Center - page 1 PACS David R. Ardila User Support coordinator / NHSC Archive Scientist The Herschel Science.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 The SPIRE Photometer and its Observing Modes Bernhard Schulz (NHSC/IPAC)
1 NHSC PACS NHSC/PACS Web Tutorials Running PACS photometer pipelines PACS-202 (for Hipe 8.0) Level 0 to Level 2 processing: From raw data to calibrated.
- page 1 NHSC – DP workshop – Feb – N. Billot PACS PACS Photometer Standard Pipeline Level 0 to Level 1 processing: From raw to calibrated data cubes.
PACS NHSC Data Processing Workshop – Pasadena 10 th - 14 th Sep 2012 SPIRE AOTs, Products and Quick Look Tools Bernhard Schulz NHSC/IPAC on behalf of the.
NHSC Workshop August 2013 NASA Herschel Science Center - page 1 PACS David R. Ardila User Support coordinator / NHSC Archive Scientist Recap of Data Access.
- page 1 NHSC – DP workshop – Feb – N. Billot PACS PACS Photometer Standard Pipeline Level 1 to Level 2 processing: How to make a map for point source.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 Roberta Paladini NHSC/IPAC Photometry Guidelines for PACS data.
PACS Hitchhiker’s Guider to Herschel Archive Workshop – Pasadena 6 th – 10 th Oct 2014 SPIRE Photometer Data Products Kevin Xu NHSC/IPAC on behalf of the.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 Roberta Paladini NHSC/IPAC PACS photometer maps: several flavors.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 The PACS Photometer: Overview and Products Roberta Paladini NHSC/IPAC.
NHSC PACS How to Use getObservation And saveObservation To Access and Save Herschel Data in HIPE Yi Mei (NHSC/Caltech) Y. Mei NHSC Data Workshop – August.
1 NHSC PACS NHSC/PACS Web Tutorials Running PACS photometer pipelines PACS-402 (for Hipe 12.0) Level 1 to Level 2 processing: The JScanam pipeline Prepared.
PACS NHSC Data Processing Workshop – Pasadena 10 th - 14 th Sep 2012 Measuring Photometry from SPIRE Observations Presenter: David Shupe (NHSC/IPAC) on.
1 NHSC PACS NHSC/PACS Web Tutorials Running PACS photometer pipelines PACS-201 (for Hipe 12.0) Level 1* to Level 2 processing: The High-Pass Filter pipeline.
PACS NHSC Data Processing Workshop – Pasadena 10 th - 14 th Sep 2012 The SPIRE Destriper Bernhard Schulz NHSC/IPAC on behalf of the SPIRE ICC 1.
Page 1 PACS NHSC Webinar: New SPIRE Features in HIPE 10 6 th March 2013, Pasadena What’s New in SPIRE Photometer Pipeline in HIPE 10 Kevin Xu NHSC/IPAC.
NHSC HIFI DP workshop Caltech, 7-9 February page 1 Steve Lord Conversions of Intensity Scales and Frequency Units.
PACS Page 1 NHSC Workshop on HSA Data Oct 6-10, 2014 SPIRE Spectrometer Data Reduction: Special Cases Nanyao Lu NHSC/IPAC (On behalf of the SPIRE ICC,
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 SPIRE Broad-Band Photometry Extraction Bernhard Schulz (NHSC/IPAC)
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 The PACS Spectrometer: Overview and Products Roberta Paladini NHSC/IPAC.
Page 1 PACS NHSC Webinar: New SPIRE Features in HIPE th Nov 2012, Pasadena Update on SPIRE Photometer Pipeline Kevin Xu NHSC/IPAC on behalf of the.
PACS NHSC Data Processing Workshop – Pasadena 10 th - 14 th Sep 2012 HIPE Introduction and Setup for SPIRE David Shupe, NHSC/IPAC on behalf of the SPIRE.
- page 1 NHSC – DP workshop – Feb – N. Billot PACS Deglitching PACS Photometer Data Presentation based on tutorial PACS-402.
NHSC SPIRE Data School – Pasadena 28 th - 30 th June 2010 PACS page 1 SPIRE Imaging Fourier Transform Spectrometer (FTS) Pipeline Data Processing Nanyao.
Page 1 PACS NHSC Webinar: What’s New in HIPE 13 for SPIRE 19 th May 2015, Pasadena What’s New in HIPE 13 General Topics Bernhard Schulz (NHSC/IPAC) on.
Overview, Spectrometer Products and Processing Philosophy Phil Appleton on Behalf of PACS Team PACS IFU Spectrometer.
Data Processing Workshop NHSC, Pasadena, CA 02 – 04 February 2011 Stephan Ott VG #1 PACS Overview and new developments in.
NHSC PACS PACS Photometry and Errors Estimate Roberta Paladini (NSHC/Caltech) R. Paladini NHSC Archive Data Processing Workshop – August 26 th – 30 th.
PACS Photometer Standard Pipeline Level 0 to Level 1 processing From raw to calibrated data cubes B. Altieri (ESA/HSC), N.Billot (IPAC/NHSC) ESAC March.
PACS NHSC Data Processing Workshop Aug 26-30, 2013 Page 1 SPIRE Spectrometer Data: Calibration Updates, User Data Reprocessing, and Other Issues Nanyao.
PACS Page 1 NHSC Data Processing Workshop – Pasadena Aug 26-30, 2013 SPIRE Spectrometer Data Reduction: Mapping Observations Nanyao Lu NHSC/IPAC (On behalf.
Page 1 NHSC PACS Web Tutorial PACS 301 nhsc.ipac.caltech.edu/helpdesk NHSC/PACS Web Tutorials Running the PACS Spectrometer pipeline for CHOP/NOD Mode.
NHSC Data Processing Workshop Aug 26-30, 2013 PACS Page 1 SPIRE Spectrometer Data Processing (The Pipeline) Nanyao Lu NHSC/IPAC (on behalf of the SPIRE.
HIFI Tutorial 1: Running the HIFI Pipelines and Adaptations A.P.Marston ESAC 27 June 2013.
1 NHSC PACS NHSC/PACS Web Tutorials Running PACS photometer pipelines PACS-402 (for Hipe 13.0) Level 1 to Level 2.5 processing: The JScanam pipeline Prepared.
PACS page 1 NHSC SPIRE Data Processing Webinars 8 th Feb 2012 PACS page 1 Overview of SPIRE Photometer Pipeline C. Kevin Xu (NHSC/IPAC)
NHSC HIFI DP workshop Caltech, 7-9 February page 1 Spurs in HIFI data.
PACS NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Preparing HIPE for SPIRE work David Shupe, NHSC/IPAC on behalf of the SPIRE ICC.
PACS page 1 NHSC SPIRE Data Processing Webinars 7 th March 2012 PACS page 1 SPIRE Photometer Map Making C. Kevin Xu (NHSC/IPAC)
New SPIRE features in HIPE 9.1 NHSC; Nov 28, 2012 PACS Page 1 What’s New in HIPE 9.1 ( SPIRE FTS) Nanyao Lu NHSC/IPAC (on behalf of the SPIRE ICC)
PACS Page 1 NHSC Workshop on HSA Data Oct 6-10, 2014 SPIRE Spectrometer: Pipeline Calibration Nanyao Lu NHSC/IPAC (on behalf of the SPIRE ICC, HSC & NHSC)
NHSC HIFI DP workshop Caltech, 8-9 March page 1 Pat Morris, NHSC DP Webinar, 9 March 2012 HIFI Spectral Maps in HIPE.
1 NHSC PACS NHSC/PACS Web Tutorials Running PACS photometer pipelines PACS-403 (for Hipe 13.0) Level 1 to Level 2.5 processing: The Unimap pipeline Prepared.
Page 1 PACS NHSC Data Processing Workshop – Pasadena 10 th - 14 th Sep 2012 Reprocessing Scan Maps Kevin Xu NHSC/IPAC on behalf of the SPIRE ICC.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th – 10 th Oct 2014 Overview of SPIRE Photometer Data Reduction Pipeline Kevin Xu NHSC/IPAC.
Markus Nielbock (MPIA) – PACS Photometer Flux Calibration Herschel Calibration Workshop PACS Photometer Flux Calibration: Update Markus Nielbock (MPIA.
SPIRE Flux Calibration: Implementation
photometry and spectroscopy with PACS
NHSC/PACS Web Tutorials
PACS ICC Meeting #41 PACS Photometer
SPIRE Spectrometer Data Reduction: Spectral Line Fitting
Overview and new developments in Herschel Data Processing
What’s New in HIPE 10.0 (SPIRE FTS)
Presentation transcript:

page 1 PACS NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Issues with Photometer Data & How to Resolve them with HIPE Tools Kevin Xu NHSC/IPAC on behalf of the SPIRE ICC

PACS page 2 NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Known Issues New Flux Calibration in HIPE 11 “Cooler Burps” Glitches Missed Thermistor Signal Jumps Reference: “SPIRE Data Reduction Guide” in HIPE (under “Help”) or in:

PACS page 3 NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 New Flux Calibration in HIPE 11 Nominal mode –Re-calibrated using the new ESA4 Neptune model by R. Moreno. Bright mode –Previous calibrations were based on theoretical bolometer models. –New empirical calibration of linearity and flux using ESA4 Neptune model. Changes: ~ 1 – 2 %. –If HIPE version of your data is earlier than 11.0, you may want to reprocess them with the new calibration. Neptune model based on Moreno Instrumental uncertainties 1.5%, absolute flux uncertainty ~4% (Bendo et al in press. arXiv: )

PACS page 4 NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Reprocess with new calibration Option 1: HSA On-demand Reprocessing (latest calibration):

PACS page 5 NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Option 2: Reprocess using ‘user pipeline’ and new cal file (cal_11) The only mandatory user inputs

PACS page 6 NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Known Issues New Flux Calibration in HIPE 11 “Cooler Burps” Glitches Missed Thermistor Signal Jumps

PACS page 7 NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 “Cooler Burp” Every time when SPIRE is switched on after a cooler recycle, the first ~6 h sees rapid drifts of the temperature and of the bias voltage. It causes abnormal drifts in detector timelines, which in turn cause stripes in maps observed during the “cooler burp” period. After cooler recycle 1 (~40 h) After cooler recycle 2 (~40 h) “burp” ~ 6h bias drift ~10σ  Resistor voltage Bias voltage An example of stripes caused by cooler burp: Still uncorrected in the standard (SPG) pipeline of HIPE 11, but can be corrected using ‘user pipeline’ scripts. Map size: ~ 8d x 2d

PACS page 8 NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Reprocess with Cooler-Burp correction User pipeline

PACS page 9 NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Reprocess with Cooler-Burp correction An example for results of the Cooler-Burp correction: before correction after correction

PACS page 10 NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Known Issues New Flux Calibration in HIPE 11 “Cooler Burps” Glitches Missed Thermistor Signal Jumps

PACS page 11 NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Glitches Candidates of missed glitches - Glitches are mostly due to cosmic-rays - Most of them are removed by the deglitchers in the pipeline. - However, few of them may be missed and cause artifacts in final maps. - Using HIPE tools, you can find where in the time- lines the glitches are & mask them.

PACS page 12 NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Allocate glitches with “Bolometer Finder” click true glitch scan # sample #

PACS page 13 NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Mask glitches with “Mask Editor” right-click on ‘obs’

PACS page 14 NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Mask glitches with “Mask Editor” click on this scan #

PACS page 15 NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Mask glitches with “Mask Editor” 1. click on this missed glitch 2. draw a box using curser × 3. click on this to close

PACS page 16 NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Mask glitches with “Mask Editor” click on this to save 1 more glitch count

PACS page 17 NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Known Issues New Flux Calibration in HIPE 11 Cooler Burps Glitches Missed Thermistor Signal Jumps

PACS page 18 NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Thermistor Signal Jump Sudden spontaneous jump in a thermistor timeline. The average frequency is ~ 1/day. Effect: The pipeline uses thermistor timelines in the correction for detector signal drift due to temperature drift. A thermistor “jump” affects this correction, introducing artificial stripes in the final map. Jump Stripe caused by the jump The automatic thermistor jump detector in the pipeline has a failure rate of ~ 3%. If you see a broad stripe such as that in the example, you need to reprocess the data (mask the affected thermistor manually using Mask Editor).

PACS page 19 NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Summary The new flux calibration implemented in HIPE 11 causes ~ 1-2 % changes in the flux measurements obtained using SPIRE Photometer arrays. Currently, the HIPE version of SPIRE data downloaded from HSA is v10.3. In order to get the data with the new calibration, one can either do On-Demand Reprocessing using HSA, or reprocess the data using one of the User Pipeline scripts found in HIPE 11 and the new SPIRE calibration tree “spire_cal_11” (both HIPE 11 and “spire_cal_11” are provided in this workshop). “Cooler Burp” effect is arguably the most serious issue that has remained uncorrected in SPIRE Photometer data produced by current (HIPE 11) Standard Pipeline. It can be corrected using User Pipelines. It shall be corrected automatically in HIPE 12 Standard Pipeline according to the plan. The glitches missed by the pipeline degltichers can be identified and masked interactively using HIPE tools “Bolometer Finder” & “Mask Editor”. Map stripes caused by thermistor signal jumps that missed by the Thermistor Jump Detector in the standard pipeline can be corrected by reprocessing the data using User Pipelines with the affected thermistor masked using “Mask Editor”.