Xenon Detector Installation schedule Satoshi MIHARA.

Slides:



Advertisements
Similar presentations
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
Advertisements

COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
Chubaka Producciones Presenta :.
The Months and The Seasons Prepared by Claudia Doria and Terra Myers.
Technical Coordinator’s Report (KL for PD) Solenoid problems & Schedule Actions on –KL/CN: plan for work to December shutdown –KL/CN: plan for work in.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
/3024/ SUN MON TUE WED THU FRI SAT JANUARY 2011 February 2011 SMTWTFS
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
2007 Monthly Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
A. Baldini PSI 18 July 2007 MEG Overview Cobra (W. Ootani) LXe calorimeter (S. Mihara) Calibrations (G. Signorelli) Drift Chambers (J. Egger) Timing counter.
Satoshi Mihara ICEPP, Univ. of Tokyo Feb MEG Review Meeting 1 CEX beam test at piE1 Satoshi Mihara.
PSI - February 3, 20031F. Sergiampietri MEG – PMT cryogenic test: PURPOSES -SYSTEMATIC TEST OF THE PMT’s FOR MEG IN OPERATING CONDITIONS -BUILD AN EVOLUTIVE.
Line Graph- a graph that uses a line to show the relationship between two sets of data. Line graphs show how data changes over time.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
EUROPE Nov 27 –Dec 10 November 27 - Dec 10.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Xenon Delivery Japan 1 MCHF 575 kCHF granted Additional grant 656 kCHF Last 50l subject to negotiation.
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
The LHCb Installation Story
LHC schedule.
NA61 news and plans News from other labs/experiments
LLRF Controls Outline Requirements External Interfaces Schedule Design
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
X-ray Pump-Probe Instrument
Year 2 Autumn Term Week 12 Lesson 1
ECAL electronics schedule
13-block rotation schedule
1   1.テキストの入れ替え テキストを自由に入れ替えることができます。 フチなし全面印刷がおすすめです。 印刷のポイント.
Logo Calendar – January 2012 TO DO LIST 01/04/2012 Example TO DO LIST
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
McDonald’s Kalender 2009.
January Sun Mon Tue Wed Thu Fri Sat
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
2300 (11PM) September 21 Blue line is meridian..
January MON TUE WED THU FRI SAT SUN
McDonald’s calendar 2007.
Year 2 Autumn Term Week 12 Lesson 1
1 - January - Sun Mon The Wed Thu Fri Sat
Proud As A Peacock! We are very proud of__________________
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
Calendar.
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
January MON TUE WED THU FRI SAT SUN
S M T W F S M T W F
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
McDonald’s calendar 2007.
1 January 2018 Sun Mon Tue Wed Thu Fri Sat
1 January MON TUE WED THU FRI SAT SUN MEMO 2 February MON TUE WED THU FRI SAT SUN.
2015 January February March April May June July August September
S M T W F S M T W F
S M T W F S M T W F
1 January MON TUE WED THU FRI SAT SUN MEMO 2 February MON TUE WED THU FRI SAT SUN.
Presentation transcript:

Xenon Detector Installation schedule Satoshi MIHARA

Xenon Installation Schedule   Monthly schedule August Piping work between storage tank and 1000l dewar PiE5 September NaI Mover installation (1 week after delivery), NaI setup PiE5 October November Alignment at PiE5, PMT installation and check PiE5 December Complete PMT installation and check. Move to PiE5 are (13/Dec?) PiE5 January Start operationPiE5

Alignment of the cryostat at PiE5  We need alignment of the cryostat on the platform before installing PMTs. Align the cryostat (position and height) Make holes on the xenon platform to fix the cryostat  Provisionally this is scheduled in 1/Nov (Wed) – 8/Nov(Wed) Possible conflict with  Beam Tuning  DC/TC run Need crane access on the platform

NaI Mover

35cm VME 9U Type 2 Trigger Boards

50cm

What can we do in 2006?  Cryostat delivery at the end of October PMT installation: one month Detector setup: one month We should keep operating the detector during the winter shutdown period to learn the detector. This, however, needs installation to the PiE5 area in  NaI Detector (with APD readout) will be ready well before this  Large prototype beside COBRA? Can we do something meaningful?  We understand this detector well  Need significant preparation work, but not impossible