AMS-02 Delta CDR Structural Analysis and Certification Process Carl Lauritzen Structural Analysis Lead Jacobs Engineering

Slides:



Advertisements
Similar presentations
Mechanics Based Modeling of the Dynamic Response of Wood Frame Building By Ricardo Foschi, Frank Lam,Helmut Prion, Carlos Ventura Henry He and Felix Yao.
Advertisements

GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
1 Support system of final quadrupole magnet in a Detector Contents -Introduction -Calculations -Installation -Conclusions Nov., ’08 KEK H. Yamaoka.
Phil MottAMS-02 GSR Phase II1 AMS-02 Vacuum Case Overview Ground Safety Review – Phase II September 8-10, 2008 Phil Mott.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 8/7/03.
NSTX Thomson Scattering and NB Analysis Update: Maxwell Generated EM Loads and ANSYS WB Static Stresses
Structural Qualification Testing of the WindSat Payload Using Sine Bursts Near Structural Resonance Jim Pontius Donald Barnes.
Review of Helium Venting Analyses
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
BOLTS TENSION MEMBERS AISC / LRFD WILD CARD
Magnet and Magnetic Fields Phase III Flight Safety Review January 12, 2010.
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 7.1 Stress Analysis 1 GLAST Large Area Telescope:
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator Assy1 GLAST Large Area Telescope: Mechanical.
Component Testing Test Setup TapLok Insert Shear Key Copper Threads Friction Tests Collar Shear Tests NSTX TF FLAG JOINT REVIEW 8/7/03 Michael Kalish.
AMS-02 Delta CDR Thermal. Overview Changing from Cryomagnet to PM greatly simplifies AMS-02 Thermal requirements – Keeping vacuum Case “cold as possible”
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 4/10/03.
Team K-TRON Team Members: Ryan Vroom Geoff Cunningham Trevor McClenathan Brendan Tighe.
Vibrationdata AMERICAN INSTITUTE OF AERONAUTICS AND ASTRONAUTICS 1 Practical Application of the Rayleigh-Ritz Method to Verify Launch Vehicle Bending Modes.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 8/7/03.
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
Chapter 1 Stress.
April 7, 2008University of Minnesota PDR Satellite Structure Subsystem Structural and Vibrational Stress Analysis Presented By: Chris Matthews.
December 3-4, 2007Earthquake Readiness Workshop Seismic Design Considerations Mike Sheehan.
© 2011 Autodesk Freely licensed for use by educational institutions. Reuse and changes require a note indicating that content has been modified from the.
ZTF Cryostat Finite Element Analysis Andrew Lambert ZTF Technical Meeting 1.
Current Safety Status Phase III Flight Safety Review 12 Jan 2009.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
Overview of AMS-02 Changes due the addition of the Permanent Magnet
Structures and Mechanisms Subsystems AERSP 401A. Introduction to Structural Estimation Primary Structure: load-bearing structure of the spacecraft Secondary.
PRIVÉ ET CONFIDENTIEL © Bombardier Inc. ou ses filiales. Tous droits réservés. SMART TESTING BOMBARDIER THOUGHTS FAA Bombardier Workshop Montreal
IFE Plant Structural Concepts Including Shielding and Optical Stability Requirements Thomas Kozub, Charles Gentile, Irving Zatz - PPPL.
NSTXU-CALC TF Flex Joint and TF Bundle Stub
1 LHC-DFBX Shipping Specification Steve Virostek LBNL Presented at the DFBX RFP Review October 2002, LBNL Brookhaven - Fermilab - Berkeley US LHC.
(C) Siemens Power Generation 24-Oct-15 22:52 Power Generation1 CT3 – Bump Test: Siemens Assessment and Response to Customer Concerns Agenda: - New Design.
AAE450 Spring 2009 Finite Element Analysis (FEA) for Orbital Transfer Vehicle (OTV) Tim Rebold STRC [Tim Rebold] [STRC] [1]
Semi-active Management of Structures Subjected to High Frequency Ground Excitation C.M. Ewing, R.P. Dhakal, J.G. Chase and J.B. Mander 19 th ACMSM, Christchurch,
05/04/05 FEM Analysis of PA 44 Engine Mount PIPER SEMINOLE –PA-44 TWIN ENGINE AIRCRAFT.
Spacecraft Interface/Handling Ring Robert Besuner 12 August 2004.
LAT-PR Section 33-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
AMS-02 Phase 2 Flight Safety Review1 AMS-02 Structural Analysis Overview Carl Lauritzen Jacobs Engineering May 22, 2007.
Magnets and Supports Bob Wands October 20, 2006 PPD/MD/Engineering Analysis Group Fermilab 4 th Concept Detector at Fermilab October, 2006.
Idaho RISE System Reliability and Designing to Reduce Failure ENGR Sept 2005.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
An alternative spectrograph mount Bruce C. Bigelow University of Michigan Department of Physics 5/14/04.
Full Mission Simulation Test Report SloshSAT University of Northern Colorado Team Members: Sage Andorka Dan Welsh Motoaki Honda Maurice Woods III Zach.
ENGR 211 Bridge Design Project
Machine Design I (MCE-C 203) Mechatronics Dept., Faculty of Engineering, Fayoum University Dr. Ahmed Salah Abou Taleb Lecturer, Mechanical Engineering.
TVAC Trolley Design Review1 GLAST LAT Project8 September 2005 TVAC Trolley Design Status Review 8 September 2005 TVAC Trolley Design Status Review 8 September.
Payload Safety Review Plan and Issues Leland D. Hill.
LAT Transport Container1 GLAST LAT Project8 September 2005 LAT Transport Container Design Review 8 September 2005 LAT Transport Container Design Review.
ESCG\L. D. Hill AMS-02 Permanent Magnet Safety Impact 1 AMS-02-PM Design Review - May 4-5, 2010.
Permanent Magnet Impacts to STS/ISS/MOD Chris Tutt 5 May 2010.
PHASE II FLIGHT-SAFETY REVIEW AMS-02 EXPERIMENT sub-detector SILICON TRACKER Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25,
Alpha Magnetic Spectrometer NASA / DOE National Aeronautics and Space Administration AMS-02 ROAD TO COFR Mike Fohey July 15, 2004.
Phil MottAMS-02 Phase II Safety Review1 Vacuum Case Mechanical Design Alpha Magnetic Spectrometer (AMS) - 02 Phase II Flight Safety Review Vacuum Case.
LAT MPSRLAT Structural Analysis-1 GLAST LAT ProjectNov-04 Structural Analysis: Completed Tasks LAT System Level –LAT Environmental TIM Support A success.
AMS Tracker Meeting17/10/05 Eric Perrin (GE) Tracker mechanics at Uni -Ge Safety issues Assembly Still to be made.
Engineering Design of Raon SC Cavities Myung Ook Hyun SCL Team Myung Ook Hyun SCL Team.
Telescope - Mechanical
Dead zone analysis of ECAL barrel modules under static and dynamic loads Marc Anduze, Thomas Pierre Emile – LLR CALICE Collaboration Meeting.
Solar Orbiter EUI Extreme UV Imager
Stress Analysis of Universal Tilt Kit Attachment Points
System Identification of a Nanosatellite Structure
Yoshiyuki Obuchi NAOJ / Mechanical Engineering shop Dec. 29th 2016
Roof design Bunker Project CDR
SNS PPU Cryomodule Space Frame
Review of the Modal Analysis of the MiniBooNE Horn MH1
Presentation transcript:

AMS-02 Delta CDR Structural Analysis and Certification Process Carl Lauritzen Structural Analysis Lead Jacobs Engineering May 4, 2010

Structural Verification Plan The requirements and certification plans specified in the current AMS-02 SVP (JSC-28792, Rev. F) are still applicable to the existing hardware. The requirements in the current SVP will apply to the new hardware for the following items: –Fastener integrity --- procurement and lot testing –Preloaded bolts --- torque determination and installation procedures (per MSFC- STD-486B), structural assessment (per NSTS 08307) –Material usage will be verified in accordance with all applicable requirements. None of the materials for the new hardware requires a Material Usage Agreement. There are no structural welds currently planned for the new hardware. –Fracture control and fatigue requirements will be satisfied. Changes to the existing SVP for the new hardware are discussed on subsequent charts. –We will seek written concurrence/approval from the NASA ES Structures Working Group and the NASA OB ISS Structures Team for all deviations from the existing SVP. Carl Lauritzen/ESCG2AMS-02 Delta CDR --- May 4, 2010

Overview of Structural Impacts Change from cryogenic magnet to permanent magnet simplifies the structural analysis –Structural nonlinearities associated with previous support straps are gone, so entire payload can be assessed as a linear system which greatly simplifies analyses and decreases uncertainty. –The vacuum case is no longer an evacuated system, so there are no buckling issues for the vacuum case. –Removal of the liquid helium tank eliminates slosh issues. The major structural changes are confined to the vacuum case –Stiffness lost by removing the inner cylinder is compensated by attaching the conical flanges to the magnet structure. –Support struts maintain the same line of action as the previous magnet support straps so that the load path through the vacuum case rings is not significantly altered. –New hardware is being designed with increased factors of safety and robust structural margins to facilitate structural certification by analysis only. –Permanent magnet was previously certified for flight. Addition of the upper tracker plane does not have any significant structural impacts. Addition of the lower tracker plane requires the ECAL to be lowered. Payload weight and fundamental frequencies are not significantly changed. –Overall the payload is stiffer, so the fundamental frequencies will increase slightly. –Interface forces between Orbiter/AMS-02 and ISS/AMS-02 are not expected to increase. –Payload dynamics on SRMS and SSRMS should not be significantly affected. Carl Lauritzen/ESCGAMS-02 Delta CDR --- May 4, 20103

Design Loads and Factors of Safety Load factors for design of the new hardware were based on component interface forces from the 2 nd DCLA of the existing payload (as documented in the SVP). Factors of Safety have been increased for new hardware Existing, TestedExisting, UntestedNew, Untested Yield Ultimate Loads for detailed structural assessment of the new hardware and the existing hardware will be determined from an upcoming DCLA. Final assessment of the full payload will be performed using loads from the VLA for the designated flight and associated manifest. Carl Lauritzen/ESCG4AMS-02 Delta CDR --- May 4, 2010

Frequency Verification The structural modes for the new hardware will be verified by analysis. –Preliminary modal analysis of the permanent magnet and associated support structure integrated with the vacuum case shows the frequency of the 1 st mode is 73.4 Hz. –Preliminary modal analysis of the upper tracker plane shows the frequency of the 1 st mode is 60.5 Hz. –Preliminary modal analysis of the lower tracker plane shows the frequency of the 1 st mode is 61.2 Hz. –Further assessments with more detailed and finalized models will be used to confirm that the fundamental frequencies of these hardware remain greater than 50 Hz. Structural modes of the full payload will be verified using data from the completed modal test of the existing hardware in combination with analysis that incorporates the new hardware. –Since the weight of the full payload with the new hardware is essentially unchanged and the Unique Support Structure (USS) is unchanged, the fundamental modes of the payload are not expected to change significantly. –The modes previously associated with motion of the cryogenic magnet inside the VC are no longer present. Carl Lauritzen/ESCG5AMS-02 Delta CDR --- May 4, 2010

Strength Verification Since the total payload weight is not changed and the Unique Support Structure is not changed, the results from the static test of the existing hardware are still valid. The permanent magnet was certified and flown on STS-91 –The hardware was tested to 17.7 g’s in a centrifuge. –The hardware was vibration tested to qualification levels. –A dedicated test article (without glue to hold magnet blocks in place) was tested to loads > 3 times the predicted ultimate loads. The structure yielded but did not fail. –Bolts that attach magnet flanges to core structure have been replaced with new bolts. Strength verification of the new hardware will be by analysis using increased factors of safety (FS yld = 2.0 and FS ult = 3.0) Carl Lauritzen/ESCG6AMS-02 Delta CDR --- May 4, 2010

Loads Analysis The full AMS-02 payload with the new hardware will be assessed for flight loads using the standard process for Shuttle payloads –Preliminary design of the new hardware is based on load factors from a DCLA for the full payload with the existing hardware. –Finite element models for the new hardware have been generated and integrated into the finite element model of the full payload. –The finite element model of the permanent magnet started with the same model used in the test-correlated model of the full STS-91 payload. It was updated to reflect the new bolted connections to the VC. –A DCLA using the updated math model of the AMS-02 payload will performed using the STS models and forcing functions for the existing STS-134 manifest. –Updated load factors will be developed using the transient data from the DCLA A detailed structural assessment will be performed for the new hardware. If the new load factors are larger than existing design loads, the existing structure will be reassessed for structural strength. Loads for final certification of the payload will be based on VLA results –The math model for the VLA will use the existing test-correlated math model with updates to account for the hardware modifications. Carl Lauritzen/ESCG7AMS-02 Delta CDR --- May 4, 2010

Preliminary Strength Assessment of Magnet Support Struts Maximum strut load = lb MS = 11.9 for bar MS = 0.34 for rod-end bearing For rod-end bearing, a load of lb is required to reduce margin to zero (computation is not linear). MS = 2.0 for strut buckling Carl Lauritzen/ESCG8AMS-02 Delta CDR --- May 4, 2010

Preliminary Strength Assessment of X-Structure Frame Margins of Safety MSu = 1.7 MSy = 2.3 Carl Lauritzen/ESCG9AMS-02 Delta CDR --- May 4, 2010

Preliminary Strength Assessment of X-Structure Strut Clevis Margins of Safety MSu = 0.3 MSy = 0.6 Carl Lauritzen/ESCG10AMS-02 Delta CDR --- May 4, 2010

Preliminary Strength Assessment of Modified Vacuum Case Carl Lauritzen/ESCGAMS-02 Delta CDR --- May 4, The peak stress occurs at the edge of the through-hole in the pocket. The peak stress is ~10. ksi. For FS ult = 3, MS ult = 0.75