SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Deviations from fiducial locations are unacceptable in areas despite high accuracy at alignment points.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
1 MC Assembly via Test Cell Crane FPA Stage 3 Peer Review August 12, 2005 T. Brown.
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
General idea of a couple of check rod system and adjustments
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
MC Type-B fit up review1 Review of MC Type B assembly clearances reviewing A-to-B and B-to-C interfaces 3/1/07 Summary: Wing interfaces look okay between.
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) 1.Make sure the requirements for the tooling is well defined (including.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
1 Dimensional Control for the National Compact Stellarator Experiment R. Ellis, A. Brooks, T. Brown, W. Reiersen, S. Raftopoulos, B. Stratton Presented.
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) – Stage 3 1.Make sure the requirements for the tooling is well defined.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Trip Report from CERN and Wendelstein W7-X October 6 – 13, 2007 Michael Viola; Steve Raftopoulos; Bill Sands October 6-10 CERN Geneva, Switzerland October.
Pre-Lehman Review Briefing Reiersen December 18, 2006.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
Modular Coil Assembly Bolted Joint PDR 2/22/07. Objectives The review objectives include... Define the location of additional inboard bolts Finalize the.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
SC Project Review of NCSX, April 8-10, 2008 NCSX Fueling and Vacuum Pumping Systems W. Blanchard WBS 21 and 22 Manager.
NCSX NCSX TF Coil Procurement 1 February 3, 2006 Michael Kalish NCSX TF Coil Procurement.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
Michel RAYMOND – April 14 th, 2011 Technical Support Activities in PH-ADO-PO Goals for 2011.
SC Project Review of NCSX, April 8-10, 2008 Job 1260 Neutral Beam Transition Duct (NBTD) P. L. Goranson.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
NCSX Field Period Assembly (FPA) Operations, Cost and Schedule, Staffing, and Metrology Utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
F. Dahlgren -SC Project Review of NCSX, April 8-10, 2008 PF, TF, & Trim Coil Supports (WBS-15) Core Base Support Structure (WBS-17) F. Dahlgren NCSX Coil.
1 NCSX WBS HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.
NCSX Field Period Assembly (FPA) Operations, Cost and schedule, staffing, and metrology utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
1 Field Period Assembly Office of Science Project Review Princeton Plasma Physics Laboratory Princeton, NJ November 2, 2005 T. Brown Princeton Plasma Physics.
1 MC Assembly over the VV FPA Station 3 FDR Review July 13, 2007 T. Brown.
SC Project Review of NCSX, April 8-10, 2008 Plant Design Integration, General Arrangement Drawings E. D. Perry.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
SC Project Review of NCSX, April 8-10, 2008 NCSX Field Period Assembly Mike Viola NCSX Field Period Assembly Manager NCSX Project Review April 8-10, 2008.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
1 Assembly Tooling PU Workshop on NCSX Cost & Schedule Princeton Plasma Physics Laboratory Princeton, NJ Mar 1-4, 2007 T. Brown Princeton Plasma Physics.
AWB Dimensional Control Requirements for the Modular Coils and TF coils Field Period Assembly Peer Review October 11-12, 2006 Art Brooks.
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
Field Period Assembly Wayne Reiersen SC Project Review PPPL May 2006.
1 FPA Stage 2 Peer Review May 12, 2006 T. Brown. 2 FPA Stage 2 Status Summary of Stage 2 activities Review current design status Review schedule details.
The Design: Totally bolted, electrically isolated 6 top and 6 bottom inboard flange holes, with tapped holes in one flange and a thru holes in mating flange.
A View of NCSX Structural System and Load Path for the Base Support Structure.
DRAFT Cost and schedule, staffing, metrology utilization 10 AM October 12, 2006 Mike Viola Field Period Assembly Manager.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
Engineering Operations Outage Status: New shielding of HHFW/in-vessel components has been completed. Fit-ups of OH bus lead upgrades to reduce error fields.
Preparations for working on Station 1 November 22, 2005.
8/15/2007Mike Viola1 NCSX Field Period Assembly + + = August 15, 2007 Mike Viola Field Period Assembly Manager.
12/19/2006Mike Viola1 December Lehman Review December 19, 2006 Mike Viola Field Period Assembly Manager NCSX Field Period Assembly + + =
1 CD-2 ECP Preparations What is Needed. 2 Background As part of the CD-2 process, we need to establish a fully supported and documented cost and schedule.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
1 NCSX Construction Overview NCSX Team (presented by L. Dudek) March, 2008.
SC Project Review of NCSX, April 8-10, 2008 C. A. Gentile NCSX Startup (WBS 85) C.A.Gentile NCSX CD-4 Startup.
GLAST Large Area Telescope:
Cryomodule Assembly Plan
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 2 Machine Assembly Requirements Test Cell Preparation Perform final installation / assembly of stellarator core using the Field Period Assemblies (FPAs) delivered from Station 5 and components from other WBS elements Installation of power and other services from the boundary of the Test Cell up to the stellarator core Interfaces Interfaces included in existing 3D CAD model … includes input from: All WBS elements which have items to install Safety, operations and maintenance personnel Details being adjusted in the model are just those for conventional services Cable and piping runs now being cleaned up

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 3 Machine Assembly Plan Design status Detailed assembly plan has been developed Plan includes specific metrology steps to assure that tolerance goals are met Machine Assembly will be performed with detailed procedures Procedures will cover safety issues as specific steps Installation of platforms to assure safe access to work Use of safety watches Rotating workers when repetitive motion or awkward position tasks are involved Procedures will include specific metrology steps called out in assembly plan Procedures will include repeating operations until tolerance goals are met

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 4 Procurements for Machine Assembly Procurement Status Machine Assembly only includes procurements of routine off-the-shelf items All complex or one of a kind procurements are done by other WBS elements prior to Machine Assembly

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 5 Cost and Schedule The cost and schedule estimates are based on the detailed assembly plan The mitigation of credible risks is included in the estimates Multiple fit-ups/iterations are included in the estimates All tooling will be tested before it is needed

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 6 Staffing For each task in the assembly plan: Determined crew size based on prior experience performing a similar task on the PDX, TFTR, NSTX and NCSX devices related to assembly issues and plans form Wendelstein-7 on the Advanced Toroidal Facility (ATF) stellarator at ORNL Determined number of shifts to complete Determined the amount of support staff and supervision required for each task Metrology crew requirements were specified for each task Support from the engineers who designed and fabricated each component were specified for each task when this support is needed

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 7 Level of Detail in Estimates

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 8 Summary of Costs

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 9 Machine Assembly Schedule

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 10 Machine Assembly Machine assembly will be performed with detailed procedures –Will be based on the detailed assembly plan –Will include specific metrology steps –Will assure that tolerance goals are met

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 11 Machine Assembly Component preparations Fig 1a) Period support stand Fig 1b) Spool support stand Fig 1c) FPA assembly cart

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 12 Machine Assembly Test cell metrology set-up Pre-installation set-up and test –All tooling will be tested before it is needed Fig. 2a) Machine base support structure Fig. 2b) FPA assembly carts installed

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 13 Machine Assembly Temporary assembly structure used for increased positioning accuracy –Involves assembling field periods on one set of structures that have radial motion capability and then transferring to permanent supports –Positioning will be within 0.030” –Multiple fit-ups/iterations are included in the costs and schedules Fig. 2c) Lower coils positioned within the cart rail groves.

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 14 Machine Assembly Fig. 2d) FPA cart moved to retracted position. Fig. 3a) Laser support base and pole installed.

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 15 Risks and Risk Mitigation Risk: Assembly sled not stiff enough or does not have repeatable motion Mitigation: Sled will be designed with adequate stiffness and then evaluated with concrete blocks in plenty of time to make design modifications –Cost and schedule for this mitigation is in the base plan

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 16 Machine Assembly Metrology/assembly testing of each assembly sled with a dummy load –Metrology is 1/3 of the total field work, as has been the experience on coil winding and vacuum vessel assembly Then testing each FPA on it’s sled prior to final assembly –Per experience of Wendelstein 7-X Concrete block

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 17 Machine Assembly Field Period Assembly (FPA) installation and assembly test N

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 18 Risks and Risk Mitigation Risk: Field Period Assembly (FPA) alignment not within tolerances Testing: Metrology check of position Mitigation: Use assembly carts to reposition FPA –Cost and schedule for this mitigation is in the base plan

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 19 Machine Assembly Spool piece installation test Spool piece support platform Spool piece mounted to support stand Fig. 5a) Period 1 retracted with spool and support stand installed Fig. 5b) Period 1 and spool shown at installed position

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 20 Risks and Risk Mitigation Risk: Vacuum vessel sectors not in perfect position Testing: Measure gap between sectors Mitigation: Final machining of vessel spool piece after actual gap is measured –Cost and schedule for this mitigation is in the base plan

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 21 Machine Assembly FPA-2 installation Personnel lift to access flange surface Laser tracker head mounted to adjacent Type-C flange Fig. 6a) Type-C flange measurement

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 22 Risks and Risk Mitigation Risk: Space between modular coils on adjacent FPAs not perfect Testing: Metrology to determine actual gap between Type C coils Mitigation: Custom shims –Cost and schedule for this mitigation is in the base plan

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 23 Machine Assembly FPA-3 installation Measure remaining Type-C modular coil flanges Type-C inboard shim installation check –Very limited space – platform needed for technician 8.0” 12.7” 22.78”

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 24 Machine Assembly Type-C inboard shim check / installation –Temporarily attach a set of outboard shims (top/bottom) and all inboard shims on one Type-C flange of each of the three FPAs –Move all FPAs to their installed position –Install studs and supernuts at the shimmed locations; torque to 50% of final value –Do a hand “wiggle” test for all shims to make sure they are tight If a loose shim is found, back off on sufficient adjacent bolts to allow a replacement shim to be inserted – tighten bolts and repeat

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 25 Machine Assembly Type-C inboard shim check / installation cont –Measure a minimum of eight tooling balls on each FPA The maximum deviation should be 0.020” or less –If deviation exceeds 0.020”, “back office” input is needed on which new shims should be used –Loosen hardware, install new shims and repeat –With successful metrology measurements, remove all hardware and return each FPA to its retracted position –Permanently secure in place all inboard shims. Retain in place all initial alignment outboard shims

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 26 Machine Assembly Install remaining TF coils

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 27 Machine Assembly Position lower PF4 coil and solenoid support Move all FPAs to installed position Install outboard C-C shims and remaining studs, bushings and supernuts Move each vacuum vessel section to its final position and secure

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 28 Machine Assembly Position each vacuum vessel spool piece –Lock in place with clips to vacuum vessel Weld all spool pieces to vacuum vessel –Weld inspections and leak checks on second shift Weld on port 4s

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 29 Machine Assembly Move TF coils to wedged position Install lower PF coils TF centering disk

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 30 Machine Assembly Transfer weight to final machine support structure

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 31 Risks and Risk Mitigation Risk: FPA position shifts when load is transferred to permanent supports Testing: Metrology determines shift Mitigation: Transfer load back to temporary carts, re-set permanent supports to compensate, and repeat –Cost and schedule for this mitigation is in the base plan

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 32 Machine Assembly Install vacuum pumping system on period #1 Pumpdown and leak check vacuum vessel Insulation fill in annulus between modular coils and vacuum vessel Install remaining trim coils and magnet structures Install center solenoid and remaining PF coils Install and route all magnet leads to temperature transition box

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 33 Installations Outside Stellerator Core Install LN2 distribution system Install I&C cables to stellarator core –Includes general use cable tray installation Install the cryostat Connect bakeout system Install remaining test cell platforms

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 34 3 D Model of Test Cell

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 35 Tolerance Goals Tolerance Goals can be achieved –Procedures and tooling, including metrology, are being designed to be consistent with tolerance requirements of within 0.030” –Procedures and tooling have been developed for Field Period Assembly which can be carried over to Final Assembly tasks

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 36 Tolerance Goals cont Final machine assembly planning is consistent with requirements –Assembly access for C-C inboard bolted joint has been studied using CAD modeling and a physical mockup –Mitigation measures are being budgeted, planned and implemented for risks that are still outstanding

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 37 Summary The level of detail for the Machine Assembly has increased significantly in the last 18 months –Assembly Sequence Plan was developed –Task by task estimates were made –Assembly risks were identified –Mitigation of the risks were developed and incorporated into the base plan Although designs affecting the assembly are at a conceptual level in some cases, conservative estimates which allow for multiple fit-ups, along with experience from the assembly of other devices* as well as the metrology experience gained from the Field Period Assembly, will assure the assembly of NCSX within the tolerance requirements * (PDX, TFTR, NSTX, NCSX so far, ATF and W-7)