Developments of the FETS Ion Source Scott Lawrie.

Slides:



Advertisements
Similar presentations
Multi Beamlett Extraction Experiments and Sector Magnet Field Investigation.
Advertisements

Imperial College 1 Progress at the RAL Front End Test Stand J. Pozimski Talk outline : Overview Ion source development LEBT RFQ Beam Chopper MEBT.
H – Ion Source Development at RAL & FNAL PASI Meeting, RAL 3 rd April 2013 Scott Lawrie & Dan Faircloth (RAL) Dan Bollinger (FNAL)
P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.
Ion Source Development at RAL Dan Faircloth Including the work of: Scott Lawrie, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
Pepperpot Emittance Measurements of the FETS Ion Source
E. Beebe LEBT & Ion Injection EBIS Project Technical Review 1/27/2005 LEBT and External Ion Injection Ed Beebe Preinjector Group Collider-Accelerator Department.
F.E.T.S. Mechanical Engineering Update by P. Savage 13 th August 2008.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
E. Beebe Test EBIS Results EBIS Project Technical Review 1/27/2005 An EBIS-based RHIC Preinjector - Test EBIS Results Ed Beebe Preinjector Group Collider-Accelerator.
FETS Ion Source Installation progress UKNF Meeting Trinity College, September Dan Faircloth, Scott Lawrie, Alan Letchford, Christoph Gabor,
Status Report on Mk.II Pepperpot Simon Jolly Imperial College 13 th June 2007.
Recent FETS Ion Source Measurements UK Neutrino Factory Plenary Meeting 8-9 June 2010 Rutherford Appleton Laboratory Dan Faircloth Faircloth.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
FETS H - Ion Source Experiments and Installation Scott Lawrie, Dan Faircloth, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
REFERENCES [1] C.Y. Tan, FNAL Beams-doc-3646-v16, 2011 [2] V.N. Aseev, TRACK, the beam dynamics code, PAC05 [3] S. Kurennoy, LA-UR TRANSMISSION.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
FETS Progress UKNF OsC 21 st June 2010 Dan Faircloth Faircloth.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 Implementation Plan WBS exists Working on a “bottoms up” cost estimate The following.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Simulations and Diagnostics for the Front End Test Stand Simon Jolly Imperial College 18 th April 2007.
FETS Pepperpot Simon Jolly 10 th February The Pepperpot Beam segmented by intercepting screen with regular array of holes. Beamlets drift short.
Kévin Pepitone 1CLIC project meeting, CERN, December 1st, 2015 Kevin PEPITONE, BE-RF Drive Beam Injector Gun.
Radioactive Ion Beams CW 0.5 MW (for protons) 1 GeV (for protons) p to U Chiara, Manuel, Adam, HuiMay 2011, CAS, Bilbao.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
LDRD: Magnetized Source JLEIC Meeting November 20, 2015 Riad Suleiman and Matt Poelker.
RF source, volume and caesiated extraction simulations (e-dump)
Pepperpot Emittance Measurement System: Current Status Simon Jolly Imperial College FETS Meeting, 10/05/06.
RFQ – Design, Components and Fabrication 1 We aim to design and manufacture a Radio Frequency Quadrupole (RFQ).
September 13, 2007 J. Alessi EBIS Project and EBIS as an ionizer for polarized He-3 ? Jim Alessi Work of E. Beebe, A. Pikin, A. Zelenski, A. Kponou, …
The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department Rutherford Appleton Laboratory HIPPI-05, Cosener’s.
FETS-HINS Videoconference 23rd Feb 2007 FETS Mechanical Design Issues by J. Pozimski On behalf of P. Savage.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
H4F Physics Day 2014 C.Ullmann Proton injector status for FAIR and measurements at BETSI test bench (CEA/Saclay) 2014.
KIT - The cooperation of Forschungszentrum Karlsruhe GmbH and Universität Karlsruhe (TH) Florian Fränkle EPS HEP 2009 Krakow 1 KATRIN: An experiment to.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
PXIE Ion Source and LEBT Installation Status L. Prost, B. Hanna, R. Andrews Project X Technical Meeting October 29 th, 2013.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
PS-ESS and LEBT State of the art Lorenzo Neri Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
Kévin Pepitone 1CLIC workshop, CERN, January 2016 Kevin PEPITONE, BE-RF LEETCHI: Drive Beam Electron Source.
PXIE LEBT Status Update Lionel Prost PIP-II “Friday” Meeting January 16 th, 2015.
PIP-II R&D Program PXIE Ion source and LEBT Lionel Prost PIP-II Machine Advisory Committee Meeting March 2016.
H- ion source development at FNAL Dan Bollinger.
Warm Front End Concept A. Shemyakin PIP-II Machine Advisory Committee 9-11 March 2015.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
FETS Ion Source Diagnostics: The Pepperpot
Understanding Extraction And Beam Transport In The ISIS H - Ion Source D. C. Faircloth, A.P Letchford, C. Gabor, S. Lawrie M. O. Whitehead and T. Wood.
Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.
NICA injection complex status
Alexander Aleksandrov Spallation Neutron Source Oak Ridge, USA
Laser-based Beam Diagnostics for the RAL Front End Test Stand
A. Martynov on behalf of accelerator division.
Pepperpot Emittance Measurements of the FETS Ion Source
Status of the Front End Test Stand April 2007.
Experimental Overview
Magnetized Bunched Electron Beam from DC High Voltage Photogun
H- Ion Source Development
R. Suleiman and M. Poelker September 29, 2016
Advanced Research Electron Accelerator Laboratory
Physics Design on Injector I
ISRC and LEBT Vacuum System Design
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
Front End Test Stand (F.E.T.S.) Engineering Progress Report
Simon Jolly UKNFIC Meeting 25th April 2008
Presentation transcript:

Developments of the FETS Ion Source Scott Lawrie

Main Components: The FETS project is a collaboration between ISIS and: 65 keV, 60 mA, 2 ms, 50 Hz, H - Ion Source 3 Solenoid Magnetic LEBT 324 MHz, 3 MeV, 4 Vane RFQ MEBT and Beam Chopper Beam Diagnostics and Beam Dump Laser Profile Measurement

Cathode Hydrogen Feed Heated Caesium Transport Line Air Cooling Source Body Hollow Anode Discharge Power Feed Thermocouples

Extraction Electrode Support Insulators Caesium Shields Extraction Mount

Ion Source Flange Rear-Loading Ion Source Housing Analysing Sector Magnet Cold Box Exit Hole

Pumping Holes HT Column Mounting Flange Magnetic Shielding Protection, Suppression & Ground Electrodes H - Beam Beam Leaving Cold Box Accelerated to 70 keV

Ion Source Flange Attached to Acceleration Assembly

Ion Source and Controls on HT Platform

High Voltage Cage Inside R8 at RAL

First Beam Achieved April mA 200 µs 50 Hz Presented at PAC’09

Movable Diagnostics Vessel

Differential Pumping and Laser-Profile Vessel 4 × 800 Ls x 400 Ls -1 turbo pumps Toroid1 Vacuum bellows Gated CCD Camera Light bellows Slit-Slit Emittance Scanners Pepperpot or profile scintillator head 400 Ls -1 turbo pump Toroid 2 Beam shutter Isolating Column Accelerating Electrode Assembly Ion Source 2 kV Accelerating jacket Faraday cup Electron Analysing Dipole Laser Beam Strips Electrons

Experiments Performed Transmission through laser vessel Properties of the beam to enter LEBT Attempt to increase beam current Attempt to reduce emittance Try to understand discharge & extraction Long pulse operation

RMS Normalised Emittance / π mm mRad Toroid Currents Twiss Parameters

60mA Space Charge 2mm Jaw Separation Deep E-field Penetration Voltage scale: -1000V to 0V Tracking scale: 0 eV to 17 keV

Voltage scale: -1000V to 0V 1mm Jaw Separation Less E-field Penetration 60mA Space Charge Tracking scale: 0 eV to 17 keV

Voltage Scale: V to 0V Tracking scale: 0 eV to 17 keV Pierce-type Electrodes Initial Focus Counteracts Defocusing Lens of Extraction Jaws

Beam within ±20 mRad: 74.0% Norm. Emittance: 0.16 π mm mRad Beam within ±20 mRad: 56.0% Norm. Emittance: 0.13 π mm mRad Beam within ±20 mRad: 43.3% Norm. Emittance: 0.32 π mm mRad Convex Meniscus Beam Current: 80 mA Extraction Potential: 25 kV Concave Meniscus Flat Meniscus 5° 22.5° (Pierce Angle) 30°

Emittance Scanner Improvement Mechanical Resolution of Scanners

Emittance Scanner Improvement 4 x Oversampled Image Deconvoluted using Lucy-Richardson Algorithm

Extraction Electrodes Tested ISIS standard extraction electrode with either 0.6mm or 0.8mm wide aperture slit Extraction electrode with smaller, 1 mm jaw separation Aperture plate with Pierce 22.5° inclination angle and 1.5mm separated, sharp jaw extraction electrode

14kV Extract 38kV Platform 55A Discharge ISIS Standard 0.8 mm Wide Aperture Slit 1 mm Jaw Separation Pierce & Sharp Jaws 27.3 mA 30.5 mA 37.0 mA 31.5 mA

Standard ISIS Extract

1 mm Extract Jaw Separation

Timing H 2 gas pulse ~ 200 μs Extraction volts pulse 300 µs. Want to extend to 2 ms. ~ 250 μs Source Runs at 50 Hz Rep Rate Arc discharge pulse 800 µs. Want to extend to ~ 2.5 ms. ~ 600 μs H - Beam pulse length same as extraction volts. Want 2 ms.

Standard 50Hz Short Pulse Beam 0.8mm Wide Aperture Slit 18kV extract, 42kV platform, 55A Discharge 50 Hz Rep. Rate, 65 mA beam

Low Rep-Rate Long Pulse Beam 1 mm Separated Extract Jaws 18kV extract, 42kV platform, 55A Discharge 3.125Hz Rep. Rate, mA beam

Next Steps Long-term running of FETS ion source Finish LEBT installation & commission Test LEBT mid-vessel diagnostics Achieve first beam through LEBT Assess properties of transported beam Try to achieve beam required for RFQ

Low Energy Beam Transport Installed Downstream of High Voltage Cage … to be continued!