The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Advertisements

The Use of Small Coolers for Hydrogen and Helium Liquefaction
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 NEG films: recent R&D progress Paolo Chiggiato (for the EST-SM-DA section) Vacuum Issues of the LHCb Vertex Detector 28 November NEG films: choice.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Vacuum, Surfaces & Coatings Group Technology Department 04/12/2014 R. Salemme – COLDEX results during SPS Scrubbing Run I Electron Cloud Meeting #18,
LHC VACUUM SYSTEM: 2012 REVIEW AND 2014 OUTLOOK G. Lanza, V. Baglin, G. Bregliozzi, J.M. Jimenez EVIAN 2012.
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
E-CLOUD VACUUM OBSERVATIONS AND FORECAST IN THE LHC Vacuum Surfaces Coatings Group 03/07/2011 G. Bregliozzi On behalf of VSC Group with the contributions.
1 Electron Cloud in LHC V. Baglin CERN AT-VAC, Geneva 1. Mecanism and Recipies 2. LHC Vacuum Chambers 3. Diagnostics 4. Conclusions Vincent Baglin Electron.
1 Possible Vacuum Issue V. Baglin CERN TE-VSC, Geneva Vincent Baglin Preliminary Meeting on Interface 11 T – Cold Collimation - 5 October LHC present.
Vacuum, Surfaces & Coatings Group Technology Department Glassy Carbon Tests at HiRadMat 14 March 2014 C. Garion2 Outline: Introduction Context: Transparent.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ACADEMIC COLLABORATION ON VACUUM SCIENCE JOHN COLLIGON SURFACE COATINGS AND CHARACTERISATION GROUP DALTON RESEARCH INSTITUTE MANCHESTER METROPOLITAN UNIVERSITY.
YONG WANG, BO ZHAN, GJIE WANG National Synchrotron Radiation Laboratory University of Science and Technology of China Key vacuum technologies.
Vacuum Fundamentals 1 atmosphere = 760 mm Hg = kPa 1 torr = 1 mm Hg vacuum range pressure range low 760 ~ 25 torr medium 25~ high ~ 10.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Vacuum, Surfaces & Coatings Group Technology Department Cryogenic Beam Vacuum Specificities Applicable to FCC hh V. Baglin CERN TE-VSC, Geneva 2 FCC Week.
Vacuum Fundamentals 1 atmosphere = 760 mm Hg = kPa 1 torr = 1 mm Hg vacuum range pressure range low 760 ~ 25 torr medium 25~ high ~ 10.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Beam screens in IT phase 1
TE-VSC Group J.M. Jimenez Installation (temporary) in the RP Bunkers (UJs)
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LHC Scrubbing Runs J.M. Jimenez On behalf of the Electron Cloud Study Team, a Collaboration between AT and AB Departments.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Vacuum chambers for LHC LSS TS Workshop 2004 Pedro Costa Pinto TS department, MME group Surface Characterization & Coatings Section.
September 17-21, 2007Workshop on ILC Interaction Region Engineering Design, SLAC IR Vacuum Systems first thoughts Oleg Malyshev ASTeC, STFC Daresbury Laboratory.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
Heat loads and cryogenics L.Tavian, D. Delikaris CERN, Cryogenics Group, Technology Department Accelerators & Technology Sector Friday, October 15, 20101HE-LHC'10.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The integration of 420 m detectors into the LHC
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ANKA Synchrotron Radiation Facility 1 S.Casalbuoni, E. Huttel, WP4 Coordination Meeting , CERN, Geneva, Switzerland EuroCirCol Kickoff Meeting,
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
AT-VAC SPC Nicolaas KOS Beam Screens for Inner Triplet Magnets LHC Upgrade Phase 1 Nicolaas KOS  LHC Upgrade phase 1  Inner triplet BS Requirements.
DESIGN STUDIES IR Magnet Design P. Wanderer LARP Collaboration Meeting April 27, 2006.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Procedures for detecting vacuum leaks in the LHC LTC open action from /36. LTC Frank Zimmermann, LHCCWG 23 October 2007.
Estimates of residual gas pressure in the LHC Adriana Rossi AT-VAC Workshop on Experimental Conditions and Beam Induced Detector Backgrounds April.
Benchmarking simulations and observations at the LHC Octavio Domínguez Acknowledgments: G. Arduini, G. Bregliozzi, E. Métral, G. Rumolo, D. Schulte and.
A. Kraemer, OLAVIII, July 11th, Gas Loads into SIS100 Cryogenic Vacuum Sections A. Kraemer, Calculations and Transparencies courtesy of St. Wilfert.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Beam screen cooling: scaling from LHC to FHC Philippe Lebrun FHC meeting on beam pipe design, CERN 20 December 2013.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Results from 2016 COLDEX runs and future experimental plans
Ultra-vacuum components and systems
Joint Universities Accelerator School, Archamps, February , 2017
Preliminary Y-chamber specifications – First draft
Study of the Heat Load in the LHC
BD meets VC&S at KIT, Karlsruhe, 8-10 March , 2017
Electron cloud & vacuum pressure observations: 2011 proton run
BINP New SR beam line at BINP for photo-desorption and photo-electron emission investigations. Experimental program for HiLumi. Options for future experiments.
Study of the Heat Load in the LHC
TDI with large gaps V. Baglin (21/10/11) CERN TE-VSC, Geneva
ICEC26-ICMC2016_ORAL_9-O-4C-2
CINVESTAV – Campus Mérida Electron Cloud Effects in the LHC
Characterisation of technical surfaces at cryogenic temperature under electron bombardment. Bernard HENRIST, CERN TE/VSC 5/6/2018.
Cryogenic management of the LHC Run 2 dynamic heat loads
Presentation transcript:

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement Beam Screen and Cold Bore Temperatures V. Baglin 32 nd HL-LHC TC

Outline 1.LHC cases 2.HL-LHC cases with ”high” temperature beam screen 3.Conclusions 2 V. Baglin, 32nd HL-LHC TC, December 3rd 2015, CERN

1. LHC Cases 3 V. Baglin, 32nd HL-LHC TC, December 3rd 2015, CERN

4 LHC arc & IT: case 1 V. Baglin, 32nd HL-LHC TC, December 3rd 2015, CERN Cold bore (CB) operates at 1.9 K Beam screen (BS) operates in the 5-20 K window A monolayer C. Benvenuti, R. Calder, G. Passardi J.Vac.Sci. 13(6), Nov/Dec 1976, H 2 adsorption isotherm on stainless steel During machine operation, the gas load, induced by the interaction of the beam with the vacuum chamber wall, increase with time This gas load, can be as large as H 2 /cm 2 As a result, the gas condense on the surface with a given vapour pressure On the CB, the H 2 vapour pressure is negligible:  < mbar  the vapour pressure of the other gases in even much lower On the BS, the H 2 vapour pressure increase with operation time ….. ….. and can be much larger than mbar when more than one monolayer are condensed ! Operation time 4.2 K 2.3 K

5 LHC arc & IT: solution to the H 2 vapour pressure issue V. Baglin, 32nd HL-LHC TC, December 3rd 2015, CERN A perforated beam screen as demonstrated by SSC studies in 1994 V.V. Anashin et al. J. Vac.Sci.Technol. A. 12(5), Sep/Oct 194 No perforations With perforations The beam screen holes defines the pumping speed The 1.9 K cold bore temperature provide the capacity (infinite)

6 LHC SAM: case 2 V. Baglin, 32nd HL-LHC TC, December 3rd 2015, CERN Cold bore (CB) operates at 4.5 K Beam screen (BS) operates in the 5-20 K window During gas load production, H 2 accumulates on the CB reaching the 4.5 K saturated vapour pressure of mbar  the CB does not provide enough pumping capacity anymore  a cryosorber is needed: a woven carbon fiber was selected during LHC design X 25 X V. Anashin et al. Vacuum 75 (2004) Required performances (for installation of 200 cm 2 /m): Operates from 5 to 20 K Capacity larger than H 2 /cm 2 Capture coefficient larger than 15 %

7 Carbon fiber cryosorbers V. Baglin, 32nd HL-LHC TC, December 3rd 2015, CERN Capacity Capacity at mbar : H 2 /cm 2 at 6 K H 2 /cm 2 at 30 K Sticking prob. Sticking probability at H 2 /cm 2 : 15 % at 22 K > 15 % below 22 K V. Baglin et al. EPAC’04, Luzern The cryosorbers installed onto the back of the BS provide the required capacity and pumping speed for H 2. They are located in cryoelements operating with 4.5 K cold bores The cryosorbers installed in D2, D3, D4, Q4, Q5 and Q6 of the LSS require a regeneration during the shutdown for removing the H 2 During normal operation of the LHC machine, a regeneration is not foreseen The cryosorber is regenerated at ~ 80 K While regenerating, the beam is OFF and the BS should be warmed up to more than 80 K and the CB held at more than 20 K (emptying cold mass) While the H 2 is liberated from the cryosorbers, it is pumped by an external pumping system. Principle of operation

2. HL-LHC Cases with “High” Temperature Beam Screen 8 V. Baglin, 32nd HL-LHC TC, December 3rd 2015, CERN

9 HL-LHC: case 1 V. Baglin, 32nd HL-LHC TC, December 3rd 2015, CERN Cold bore (CB) operates at 1.9 K Beam screen (BS) operates in the K range The perforated beam screen together with the 1.9 K cold bore provides the H 2 pumping speed and capacity Particularity of a-C coated beam screen: 40 K 50 K R. Salemme Physisorbed / condensed H 2 is released from 400 nm thick a-C coating in the K temperature range !  The temperature window K is not appropriated  TBC in the coming year(s) if 50–70 K is an alternative H 2 adsorption isotherm a-C coating is a cryosorber ! At 10 K: capacity ~ 100 Cu but less than the LHC cryosorber Characterisation with different gases and temperatures to be continued in 2016 and later Increasing T

10 HL-LHC: case 2 V. Baglin, 32nd HL-LHC TC, December 3rd 2015, CERN Cold bore (CB) operates at 4.5 K Beam screen (BS) operates in the K range A cryosorber is needed with a perforated beam screen to provide the H 2 pumping speed and capacity No cryosorber is evidenced above K working temperature LHC cryosorber: H 2 is not pumped above 40 K Regeneration above 80 K

3. Conclusions 11 V. Baglin, 32nd HL-LHC TC, December 3rd 2015, CERN

12 V. Baglin, 32nd HL-LHC TC, December 3rd 2015, CERN Conclusions Perforation on the beam screen provides pumping speed Operating the cold bore at 1.9 K provides H 2 capacity A cold bore operating at 4.5 K do not provides H 2 capacity: a cryosorber is needed Actual (known) cryosorber can operate in the range 5-20 K but cannot operate above ~ 40 K Finding a cryosorber operating above 40 K is one of the main challenge for the FCC study ! Evidencing such a cryosorber in the HL-LHC time frame seems unrealistic

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement Thank you for your attention

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement

Reserve slides 15 V. Baglin, 32nd HL-LHC TC, December 3rd 2015, CERN

16 LHC : Examples of temperature transients V. Baglin, 32nd HL-LHC TC, December 3rd 2015, CERN Cold bore (CB) operates at 1.9 K Beam screen (BS) operates in the 5-20 K but with excursion outside the temperature window Fill 2177, 1 st October 2011 During beam injection: T => 22 K  P ~ mbar Fill 4332, 8 th September 2015 During end of fill: T => 22 K  P ~ mbar