6 April 2006Malika Meddahi 1 CNGS Project: primary beam 1.Project Overview 2. Proton beam line overview and status 3. Target status 4. Commissioning preparation.

Slides:



Advertisements
Similar presentations
Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
Advertisements

Now2008 Paola Sala for the CNGS SBWG CNGS status Paola Sala, INFN Milano on behalf of the CNGS Secondary beam working group.
ISS, 23 September 2005E. Gschwendtner, CERN1 Beam Instrumentation at CNGS 1. Introduction 2. Layout 3. Beam Instrumentation 4. Summary.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
CNGS Operation Results 2008 Edda Gschwendtner AB/ATB on behalf of the CNGS team.
Performance and Operational Experience of the CNGS Facility Edda GSCHWENDTNER, Dario AUTIERO, Karel CORNELIS, Ilias EFTHYMIOPOULOS, Alfredo FERRARI, Alberto.
The CNGS Operation and Perspectives l Edda Gschwendtner, CERN.
NFMCC Meeting - 13 March 2006 I.Efthymiopoulos, A.Fabich, CERN AB-ATB-EA1 MERcury Intense Target (MERIT) Experiment Installation Issues I. Efthymiopoulos.
Injection test? Mike Lamont For initial discussion.
Status of the OPERA experiment Yoshiaki Nonoyama Nagoya Univ.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
WIN’11 CERN Neutrinos to Gran Sasso: The CNGS Facility at CERN l Edda Gschwendtner, CERN WIN’11, Cape Town, South Africa, 31 st Jan – 5 th Feb 2011.
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
Eva Barbara Holzer IEEE NSS, Puerto Rico October 26, Beam Loss Monitoring System of the LHC Eva Barbara Holzer, CERN for the LHC BLM team IEEE Nuclear.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Integration of the Experimental Facility in West Area & CNGS 1Ans Pardons, 18/10/2012 Integration of experimental facility in West Area and CNGS With input.
B.O.S.S. SPS ring and transfer lines Serge Massot for BE-OP-SPS European Organisation for Nuclear Research CERN CH-1211 Genève 23 Switzerland 27/05/2014CERN.
The CNGS Facility: Performance and Operational Experience Edda GSCHWENDTNER, Karel CORNELIS, Ilias EFTHYMIOPOULOS, Alfredo FERRARI, Ans PARDONS, Heinz.
07-JUL-2003LEADE / JW1 Satellite bunches in the LHC Satellite “definition” Satellite luminosity Satellite detection & tolerances J. Wenninger AB/OP.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
V. Kain AB/OP1Sep 12, 2007 Summary of Discussion on Injection Protection Issues Injection Protection Issues – meeting 22 nd of June V. Kain, A. McPherson,
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
SPS re-commissioning with beam K. Cornelis PS-SPS days.
6 April 2006E. Gschwendtner, CERN AB/ATB1 CNGS Project: Secondary Beam 1. Layout 2. Beam Instrumentation 3. Commissioning Plans for the Secondary Beam.
“Performance of BTVs during the CNGS commissioning” E. Bravin AB/BI NBI th International workshop on Neutrino Beams and Instrumentation 4-9 September.
Requirements for the Interlock System of the Phase1 beam line Janet Schmidt on behalf of CP3.
The Stripping Foil Test Stand in the Linac4 Transfer Line
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
CNGS Operation Summary Edda Gschwendtner, CERN. Outline Introduction CNGS Performance Highlights since last NBI 2010 in Japan Issues Summary 2E. Gschwendtner,
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
HIGH RADIATION TO MATERIALS: HIRADMAT STATUS HiRadMat Scientific Board, 23/4/2012 Outline  Location  Status  Beam line  Infrastructure  Exp. Area.
Status of the AP2 Optics Keith Gollwitzer Antiproton Source Department November 19, 2004.
Extraction and beamline progress B.Goddard TE/ABT.
29 June 2006 CERN Neutrinos to Gran Sasso Seminar for CERN guides, by K. Elsener 1 CNGS - CERN Neutrinos to Gran Sasso > “Neutrinos” and “Gran Sasso” >
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
NBI2006 Starting OPERA data-taking with the CNGS beam D.Autiero IN2P3/IPN Lyon 5/9/2006.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
Issues Concerning Different Beam Lines Integration C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements: WP3 and.
1 NBI Rh. Jones (CERN - AB/BDI) CNGS Target Area Beam Position Monitors OUTLINE 1.Recap of Requirements & Layout 2.Monitor Candidates -Secondary.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
2008 European School of High-Energy Physics - Trest, Czech Republic - 19 August - 1st September Target Tracker Data Analysis In OPERA Experiment S. Dmitrievsky,
1 TI 8 LHC SPS LSS6 IR2 TT41 LSS4 IR8 TI 2 TT60 TT40TT20 LSS2 LSS1 TT10 Mobile dump block (TED) Targets T2, T4, T6 Target T40.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Beam transfer considerations for LAGUNA Angelina Parfenova, W. Bartmann, L. Ducimetiere, B. Goddard, V.Kain, M.A. Kowalska, M. Meddahi, B. Puccio, F. Velotti.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
LAGUNA Primary Beam: Extraction and Transfer B.Goddard TE/ABT 23/01/2013 Reporting on behalf of many colleagues 400 GeV – Extraction from SPS – Upgrade.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
HiRadMat Summary of Phase-I and plans for Phase-II commissioning J. Blanco, N. Conan, V. Kain, K. Cornelis, B. Goddard, C. Hessler, M. Meddahi, C. Theis,
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
Primary Design Parameters July 13,2001 S. Childress Page 1 NuMI Besides design specifications driven by physics and Main Injector beam parameters, significant.
Primary Beam Lines for the Project at CERN
Schedule for the FAIR Antiproton Target
BEAM LOSS MONITORING SYSTEM
CNGS Run 2007: Radiation Issues
Acknowledgments: LIU-PT members and deputies, H. Bartosik
CNGS Proton Beam: Introduction
BEAM LOSS MONITORING SYSTEM
Use of Beam Loss Monitor type detectors in CNGS muon station
Proton Beam Diagnostics
CNGS Proton beam line: news since NBI2002 OUTLINE 1. Overview
CNGS Project Overview Konrad Elsener.
Summary Thursday h21: Stable beams fill #1303.
PS-Booster Measurements for the LHC -BLM October 2002
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

6 April 2006Malika Meddahi 1 CNGS Project: primary beam 1.Project Overview 2. Proton beam line overview and status 3. Target status 4. Commissioning preparation

6 April 2006Malika Meddahi 2 (see CNGS – a long base-line neutrino beam facility (732 km) send   beam -> detect  appearance CNGS project at CERN: production of the  beam using protons from the existing accelerator chain 1. Project Overview At Gran Sasso: OPERA detecting 

6 April 2006Malika Meddahi 3 CNGS: the main components vacuum 700 m 100 m 1000m 67 m p + C  (interactions)   , K , (   )  (decay in flight)     

6 April 2006Malika Meddahi 4

6 April 2006Malika Meddahi 5 2. Proton beam line overview and status

6 April 2006Malika Meddahi 6 Nominal beam parameters Upgrade phase: p

6 April 2006Malika Meddahi 7 Nominal parameters : Beta at focus : 10 m, 20m Beam size  at 400 GeV : 0.5 mm Beam divergence  ’ at 400 GeV : 0.05, 0.03 mrad Optics at Target Possible to increase further the beam size

6 April 2006Malika Meddahi 8 Proton beam line overview

6 April 2006Malika Meddahi 9 TA40 TT40 Beam Dump TED Safety beam stopper SPS extraction point to CNGS target to LHC SPS beam CNGS&LHC beam MBHC 13mrad MBHA 15mrad MBSG 25mrad TT41 extraction point to beam dump

6 April 2006Malika Meddahi 10 Electrical distribution box BPM control box Magnet Interlock box Transfer line layout: half cell MBG MDG QTG 5.6% slope BEAM

6 April 2006Malika Meddahi 11 MBG73 magnets (78 ordered) Gap height 37 mm Nominal field : GeV Magnetic length : 6.3 m New TT41 magnets QTG20 magnets (23 ordered) Nominal gradient 40 T/m, 2.2 m long Magnetic aperture : 45 mm MDG12 magnets (17 ordered) Bending angle 80  rad Gap height : 45 mm Overall length: 700mm

6 April 2006Malika Meddahi 12

6 April 2006Malika Meddahi 13

6 April 2006Malika Meddahi 14 BPM1 BTV1 BFCT BPM2BPM3 BTV2 BTV3 3 m5 m TBID 2 BLMs Target Beam Last 20m of TT41

6 April 2006Malika Meddahi 15 Final focusing onto the target (recuperated magnets)

6 April 2006Malika Meddahi 16 In order to protect the neck of the horn inner conductor d=18 mm): 1 m collimator in Boron Nitrite, d=14 mm. beam targethorncollimator

6 April 2006Malika Meddahi 17 Proton beam: last beam position / beam profile monitors upstream of the target station collimator and shielding BN collimator

6 April 2006Malika Meddahi beam position monitors in proton beam line (BPG) + 4 in common line with LHC (BPK) 1 coupler in air on target table (BPKG) 8 proton beam profile monitors (BTVG) 18 beam loss monitors (BLM) 1 beam current transformer (BFCT) (+1 BFCT in common line with LHC Beam line instrumentation

6 April 2006Malika Meddahi 19 Beam Position Monitoring Beam Position Measurement Requirements 18 Button Electrode BPGs in TT41 60mm Aperture Intensity Range: 1  to 3.5  10 13

6 April 2006Malika Meddahi 20 Target Beam Position Monitor Final standard BPG of the proton beam line & target BPKG  used to provide position at the target  setting up performed using final beam line BPG  aiming at target rods verified & tracked using target BPKG  accuracy of measurement ±0.2mm in ±2mm central region.  accuracy of measurement ±0.5mm outside ±2mm central region. Target Beam Position Measurement Requirements

6 April 2006Malika Meddahi 21 BPKG – special beam position monitor on target table Stripline Coupler Pick-up operated in air

6 April 2006Malika Meddahi  m carbon and 12  m titanium screens 5 to 10 % precision requested Ti screen “in” Beam Profile monitors

6 April 2006Malika Meddahi 23 Beam Loss Monitoring Beam losses will be detected using:  18 standard 1 litre, SPS, nitrogen filled ionisation chambers  30 parallel plates with 5mm separation - ionisation length of 19cm  efficiency of ~1250 pairs per primary charge

6 April 2006Malika Meddahi 24 Beam Current Transformers Two Monitors – one at the beginning & one at the end of the line Absolute Accuracy of 1% for the Intensity Range: 1  to 3.5  First BCT sees both LHC & CNGS beams Has to fulfill additional requirement of LHC bunch by bunch capability (i.e. 25ns resolution)

6 April 2006Malika Meddahi Target status

6 April 2006Malika Meddahi 26 Downstream Window Target Support Sealed finned tube Inert gas End cap Upstream Window The target unit is conceived as a static sealed system filled with 0.5 bar of He. MATERIALS Tube:Al-Mg alloy Windows: Be by Brush & Wellman Target Support:Carbon Fiber reinforced Carbon Target rod: Fine-grain graphite, sintered carbon, C-C composite Central tube “Graphite rods”, L = 10 cm,  = 5 / 4 mm Target Station

6 April 2006Malika Meddahi 27 The target units

6 April 2006Malika Meddahi 28 Target Magazine + BPKG Indexing finger BPKG

6 April 2006Malika Meddahi 29

6 April 2006Malika Meddahi 30

6 April 2006Malika Meddahi 31

6 April 2006Malika Meddahi 32

6 April 2006Malika Meddahi Commissioning preparation a)First extraction tests b) Plans for the commissioning periods

6 April 2006Malika Meddahi 34 Beam dump Safety beam stopper SPS extraction point to target to LHC SPS beam CNGS&LHC beam Beam loss monitors Profiles Beam Current Monitor TA40 TT40 SPS extraction point First checks of CNGS beam extraction

6 April 2006Malika Meddahi 35

6 April 2006Malika Meddahi 36 - Hardware commissioning Feb. – April 2006 Beam instrumentations: BLM and BTVG done, BPG in progress Power supplies done Magnets (polarities)in progress Vacuum systemdone - “Dry runs” April – May 2006 Timing Controls Interlocks Beam permit Magnets (current & polarities) - Commissioning with beam 2006: weeks 22, 25 and 27 Commissioning schedule

6 April 2006Malika Meddahi 37 Commissioning schedule Week 22 : low intensity Week 25 : low to medium intensity Week 27 : high intensity, full facility

6 April 2006Malika Meddahi 38 SPS Cycle Proposal for 2006 –Commissioning: 12s FT + 6s CNGS –Run 1 12s FT + 6s CNGS + 4.8s MD –Run 2 12s FT + 3x6s CNGS + 4.8s MD

6 April 2006Malika Meddahi 39 Plans for week 22 Upper limit of total protons sets to for week 22

6 April 2006Malika Meddahi 40 Plans for week 25 Upper limit of total protons sets to for week 25

6 April 2006Malika Meddahi 41 Plans for week 27 Upper limit of total protons sets to for week 27

6 April 2006Malika Meddahi 42 Next: Edda’s presentation on secondary beam line

6 April 2006Malika Meddahi 43

6 April 2006Malika Meddahi 44 TAG41 TSG4 TCC4

6 April 2006Malika Meddahi 45 Commissioning team, mandate, list of subjects to be addressed were defined

6 April 2006Malika Meddahi 46