Dynamic Shock Modeling Darren Barlow Regional Technical Manager Perforating.

Slides:



Advertisements
Similar presentations
M. J. Haigh Well Design Differentiators CO 2 Sequestration in Depleted Reservoirs SPE Presented at Offshore Europe 2009 Conference.
Advertisements

Building a Weather Station for a Near-Space Payload AEM 1905: Spaceflight with Ballooning University of Minnesota.
SLOPE SYSTEM - Preplanning a future Re-Entry
SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion.
Well Design PE 413 Introduction and API Standards of Casing
PETE 411 Well Drilling Lesson 17 Casing Design.
Trican’s Burst Port System (BPS) (Patent Pending) A Cost Effective Method for Horizontal Well Stimulation Lewis Facca / Scott Sherman October 14, 2010.
“ Unusual Interventions ” Jenna Robertson ICOTA Canada Roundtable October 14, 2010.
2010 International Perforating Symposium
Completion Object Overview June 2013 WITSML/PRODML Standards.
New technologies and disaster information resources Part 2. The right information, at the right time, the right way.
Introduction Most accidents are caused by the uncontrolled release of hazardous energy. Many of these accidents can be prevented by proper lock-out/tag-out.
Propellant Completions
Should Horizontal Wellbores be Logged? An analytical approach to hydraulic fracturing entry positioning and completion equipment selection.
PETE 411 Well Drilling Lesson 5 Hole Problems.
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
Selective Fracturing of a Series of Perforations in a Horizontal Well Using a Resettable Straddle System SPE Josh Thompson Weatherford International.
Application of GIS for Seismic Observation in Papua New Guinea
Inflatable DST Equipment An Overview Presentation.
INFLATABLE DST EQUIPMENT
Conventional Surface Water Treatment for Drinking Water.
BASIC DRILLING SCHOOL. COURSE OBJECTIVES During this drilling school you will get all the knowledge about drilling oil and gas wells, design requirements,
Well Testing Initial production tests at surface after wellbore cleanup and fracing. Sometimes called initial potential or IP. IP= Initial Production IPF.
1 New Production Technologies for Lifting Liquids from Horizontal Wells Radius Energy, LLC May, 2015.
A/C testing and service. Before testing and service, technician must be certified by ASE, MACS, or IMACA.
Security from Head to Toe Security At The Application Level Damon Hart-Davis Principal Consultant Code Red.
Optimum Performance in Dual Gas-Lift Wells ASME/API/ISO Spring 2004 Gas-Lift Workshop February 10-11, 2004.
Design Completion A Major Milestone System is Presented to Users and Management for Approval.
ASME – WORK SHOP - KUALA LUMPUR 2003 By:
PRODML Review Energistics Western Europe London, 31 May 2011.
Completing & Producing A Well
John N. Dougherty, PG Lisa Campbell, PG EPA Region 2, New York City
Remote Operation of Gas-lifted Wells John Stewart Shell Technology.
Casing Design.
Extended Reach Drilling and Completion Solutions in Deepwater Drilling Challenges in Deepwater ERD.
Alex Procyk, ConocoPhillips, David Atwood, Schlumberger
Network Appurtenances Major operations within a water transport and distribution systems are: 1. Transmission. 2. Storage. 3. Pumping.
Underbalanced Perforating. èEarly tests by Exxon showed that flow patterns and perforation geometry prevent the cleaning out of an appreciable percentage.
Chapter 6 Developing Medical and Fitness Standards 6-1.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
1 Introduction Background of study Four oil producer wells will be drilled in Berlian East field. Few procedures are designed to cover the well completion.
Modern Slickline Perforating Applications in the North Sea
WELL FLOW MANAGEMENT TM Agitating Explosives in Extended Reach Wells – A Good Idea? INTERNATIONAL PERFORATING SYMPOSIUM EUROPE 2015 Kerry Daly Global BD.
1 © 2014 Baker Hughes Incorporated. All Rights Reserved. © 2014 BAKER HUGHES INCORPORATED. ALL RIGHTS RESERVED. TERMS AND CONDITIONS OF USE: BY ACCEPTING.
Schlumberger / Client Confidential
Displacement related to disasters and the effects of climate change is a reality and one of the big challenges which States and the international community.
An Application of Reactive Charge Technology to High Strength Formation and High Overbalance Environments: Charge Design and Operational Challenges EWAPS-12-2.
Components of Water Networks Eng. Mona Al-Gharbawi Eng. Ayman Al-Afifi
International Perforating Symposium (IPS) 2016 Mitigating the Problems in Select-Fire Perforating Operations.
Presentation on “ELEMENTS OF PRODUCTION ENGINEERING”
Vertical Safety Device to Prohibit Accidental Perforating Gun Detonation, TCP International Perforating Symposium Amsterdam 2015 Authored by: Bradley Vass.
Lecture 10 Production Engineering
Perforating Design for HTHP Completion: Rigorous Testing to Maximize Well Productivity Alex Procyk, ConocoPhillips, David Atwood, Schlumberger Presented.
Oil-Field Hydraulics Chapter 2 Production Equipment
Using an Inflatable Element
2017 capl conference what will be unconventional next
Scope / History Well 25/11-G-18 was drilled nov The well has 7” Bakerweld 140 Screens and swell packers. The well is producing gas from the “heal”
Planning and executing a successful CT deployment of long TCP assembly
International Perforating Symposium Amsterdam 2015
International Perforating Symposium Europe 2015 Amsterdam
Hydraulics Used in many applications in industry!.
Completion Object Overview
Andy Martin, Alexis Marmol & Abdullah Khan IPS-15-8
Well Perforation Perforation  is the process of creating holes in production casing to establish communication between the well and formation. Perforation.
WELL COMPLETION AND STIMULATION BY BHARAT KUMAR HARANI ASSISTANT PROFESSOR DAWOOD UNIVERSITY OF ENGINEERING & TECHNOLOGY, KARACHI.
Whipstock. AGENDA DefinitionComponents Operation Sequence 2.
Well Perforation Perforation  is the process of creating holes in production casing to establish communication between the well and formation. Perforation.
Presentation transcript:

Dynamic Shock Modeling Darren Barlow Regional Technical Manager Perforating

Leon Moisseiff  What if he had the ability to model?  What does it cost if you have a major failure on a well?  Disaster is intriguing if it’s not you!

Key Areas Workplusplace.com Fineartamerica.com

Large Guns

Modeling versus Reality  275’ of 6 ½ guns  Reservoir 15K Red – Tubing Movement Blue – Packer Load Cyan - Tubing Load C/T 830,000 lbf

Avoiding NPT Packer 60m 7” UHSD Firing Head 10m 3 ½ ppf Release Ported Sub

Pressures Equals Loading Red – Tubing Movement Blue – Packer Load Cyan - Tubing Load C/T

Strengthening the BHA Packer 60m 7” 18 spf UHSD Firing Head 10m 3 ½ ppf Release Ported Sub 10m 5 ½ Drillpipe

Confined Spaces

Isolation plug Running Tool Loss of well 10 Isolation Packer

Movement 11 CWOP – 5’ Depth of the well was 25,000+

Bridge Plug- Well Integrity 36m 7” Guns Bridge Plug Retrievable Packer 10m 62m * * Packer Bridge Plug

Unknowns

Component Failure 35m of guns Champ IV Packer Formation test string Pup Joint w/ Firing Heads Why was Failure NOT Predicted?

Post Failure Analysis Gauge Analysis:  Reported k = 0.2 md  Actual k = 0.02 md  Changed perm and re-ran model Predicted 3244m Actual 3245m

How can modeling help your completion challenges? Darren Barlow Regional Technical Manager- Perforating Summary