4V-500 ½”-2”. Modification Overview  Production of the 4V-500 PVB began in 1998.  The 4V utilizes a float assembly that contains a relief valve that.

Slides:



Advertisements
Similar presentations
RP-500 ½- 1. Modification Overview Production of the RP500 began in 2007 and is current. Production of the RP500 began in 2007 and is current.
Advertisements

¾”-2”. Modification Overview  Production of the series began in 1989 and is current.  Early models of ¾”-2” series did not always.
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
975, 975XL ¾”-2” 975, 975XL ¾”-2”. Modification Overview  Production of the original 975 began in This version had buna-n check discs and did not.
975DA 2½”-10”. Modification Overview  Production of the 975DA began in 1993 and was discontinued in  The 975DA uses a ¾” 975XL for the bypass.
765 ½”- 2”. Modification Overview  Production of the 765 began in 1975 and is current.
200B ½”-2”. Modification Overview  Production of the 200B (Watts 719) began in 2003 and is current.
825Y(YA) 3/4”-2”. Modification Overview  Production of the 825Y began in 1978 and is current.  The 825YR ( ) had replaceable check seats. **
800 (M2,M3,M4) ½”-2”. Modification Overview  The original model 800 was produced from  The 800M2 was produced from  The 800M3.
375, 375XL ¾”-1”. Modification Overview  Production of the ¾”-1” 375 began in 2004 and is current.  The lead free version 375XL was introduced in 2010.
475, 475V 2½”-3”. Modification Overview  Production of the 2½ - 3” sizes began in  The lead free version (XL) was introduced in 2011.
4D-200, 4D-700 2½”- 10”. Modification Overview  Production began in 2003 and was discontinued in  The 4D-700 (RPDA) uses a Type-II bypass (single.
½”-10”. Modification Overview  Production of the series began in 1989 and is current.
4S-100, 4SG-100 2½”-10”. Modification Overview  Production of the 4S-100 aka (DC4S) began in  The 4SG-100 was introduced in The “G” indicates.
009 (M3) ½”-2” 009 (M3) ½”-2”. Modification Overview- 009  009 ¾-1” ( ) (1” ) ¾-1” ( ) (1” ) 1¼ -2” ( ) 1¼.
RPZ 2½”- 10” RPZ 2½”- 10”. Modification Overview  Production of the RPZ in sizes 2½ - 10” began in 1993 and is current.
5000CIV 21/2”-10” 5000CIV 21/2”-10”. Modification Overview  Production of the 5000CIV (Watts 909RPDA) began in 1998 and is current.  The 5000CIV utilizes.
375, 375XL 1¼” -2”. Modification Overview  Production of the 1¼” -2” 375 began in 2004 and is current.  The lead free version 375XL was introduced in.
RPZ, RPZE ½”-2”. Modification Overview  Production of the model RPZ began in  The lead free version ( RPZE ) was introduced in 2002 and is current.
PVB ¾”- 2”. Modification Overview  Production for the ¾” – 1” PVB began in 1995 and is current.  The body of the ¾” – 1” PVB was modified in July of.
”-10”.
½”-10”.
009 2½”-3”.
RP4A (LF) ½”-2”.
PVB-4A ½”- 2”.
720A ½”-2”.
420, 420XL ¾”-1”.
007 2½”-3”.
2000SS 2½”-12”.
800 (M2,M3,M4) ½”-2”.
830, 831 4”- 6”.
DCV, DCVE ½”-2”.
¾”-2”.
007DCDA 2½”-3”.
½”- 2”.
3000CIV 21/2”-10”.
½”-10”.
007DCDA 2”.
¾”-2”.
450 2½”- 3”.
DC4A (LF) ½”-2”.
RPZ-II, RPZE-II ½” , ¾” , 1½”.
774 DCDA 21/2”-12”.
909 3/4”-2”.
4000B (M3) ½”-2”.
4D-100, 4D-600 2½”- 10”.
DC-500 ½”- 1”.
LF856 2½”-10”.
850 (LF) ½”- 2”.
719 ½”-2”.
950, 950XL, 950XLT ¾”-2”.
909 21/2”-10”.
2000SS 2½”-12”.
709DCDA 2½ ”-10”.
975 2½”-10”.
3000B 2”.
774 2½”-12”.
2000CIV 2½ ”-10”.
007 2½”-3”.
4000CIV 21/2”-10”.
919 ¾”-2”.
950DA 21/2”-10”.
007DCDA 2½”-3”.
007DCDA 2”.
3000B 2”.
2000B (M3) ½”-2”.
909 RPDA 21/2”-10”.
757, 757N, 757Z (2½ ” – 10”) 757A (2½ ”- 6”).
709 3/4”-2”.
709 2½ ”-10”.
Presentation transcript:

4V-500 ½”-2”

Modification Overview  Production of the 4V-500 PVB began in  The 4V utilizes a float assembly that contains a relief valve that protects the unit against freeze damage.

Canopy Removal  The canopy is secured by two screws.

Bonnet Removal  The bonnet is threaded into the body and sealed by an o-ring.  Unscrew the bonnet counter clockwise.  There is no spring load.

Float Removal and Service  The float is part of the bonnet assembly.  If the float or float spring is damaged, the bonnet must be replaced.

Check Valve Removal ½”-1”  The check valve is a module.  The check valve is threaded into the body and sealed by an o-ring. * Note: A special tool is needed to remove the check module.

Check Valve Removal 11/4”-2”  The 11/4” & 11/2” check modules are secured by a retainer that is threaded into the body.  The 2” check valve is not modular and is spring loaded.  Unscrew the spring retainer counter clockwise.

Check Disc Replacement  The ½”-11/2” rubber discs are part of the check module.  If the disc is damaged, the check module must be replaced.  The 2” disc is free once the screw and retainer are removed.

Check Seat Replacement  The ½”-11/2” check seats are part of the check module.  If the seat is damaged, the module must be replaced.  The 2” check seat is threaded into the body and sealed by an o-ring.  A special tool is needed for seat replacement.

Reassembly Notes  Reassemble in reverse order.  Lubricate the bonnet and check o-rings.