WG3 – STRIP R&D ITS - COMSATS 02.5.2011 P. Riedler, G. Contin, A. Rivetti – WG3 conveners.

Slides:



Advertisements
Similar presentations
Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
Advertisements

H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Marco Bregant Vertex05 - Nikko, November 2005 Dipartimento di Fisica Universit à di Trieste & Istituto Nazionale di Fisica Nucleare (INFN) - Trieste ALICE.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
N-XYTER Hybrid Developments Christian J. Schmidt et al., GSI Darmstadt JINR, Dubna, Oct. 15 th 2008.
The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna.
General needs at CERN for special PCB’s Philippe Farthouat CERN.
The Alice Inner Tracking System
A Silicon Disk Tracker in forward direction for STAR News since November 2000 Physics Capabilities capabilities Requirements / Potential Technologies Possible.
For high fluence, good S/N ratio thanks to: Single strip leakage current I leak  95nA at T  -5C Interstrip capacitance  3pF SVX4 chip 10 modules fully.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
1 Module and stave interconnect Rev. sept. 29/08.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Aberystwyth 12th - 16th September 2011
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR Heavy Flavor Tracker Overview With parameters pertinent to the PXL Sensor and RDO design.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
1 Conceptual design adopts state-of-the-art silicon sensor techniques (compare ATLAS/CMS/ALICE inner tracker layers, BaBar tracking of B mesons). Design.
Roger Rusack – The University of Minnesota 1.
ALICE Rad.Tolerant Electronics, 30 Aug 2004Børge Svane Nielsen, NBI1 FMD – Forward Multiplicity Detector ALICE Meeting on Rad. Tolerant Electronics CERN,
Wire Bonding and Analogue Readout ● Cold bump bonding is not easy ● Pixel chip is not reusable ● FE-I3 is not available at the moment ● FE-I4 is coming.
Chevron / Zigzag Pad Designs for Gas Trackers
GEM detector development at VECC Anand Dubey. 2-GEM detector tested with source symmetric mode of biasing scheme, (i.e. same voltage across both the GEMS)
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
Pixel 2000 Workshop Christian Grah University of Wuppertal June 2000, Genova O. Bäsken K.H.Becks.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
ASIC R&D at Fermilab R. Yarema October 30, Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
TPC in Heavy Ion Experiments Jørgen A. Lien, Høgskolen i Bergen and Universitetet i Bergen, Norway for the ALICE Collaboration. Outlook: Presenting some.
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
Technology Overview or Challenges of Future High Energy Particle Detection Tomasz Hemperek
1 13 June 2011 ALICE ITS Upgrade Proposal Work organization  Document scope  Timeline  Editorial board and work organization  Status (next presentations)
TPC/HBD R&D at BNL Craig Woody BNL Mini Workshop on PHENIX Upgrade Plans August 6, 2002.
Jonathan BouchetBerkeley School on Collective Dynamics 1 Performance of the Silicon Strip Detector of the STAR Experiment Jonathan Bouchet Subatech STAR.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
The LHCb Vertex Locator Lars Eklund LHCb VELO Group of the LHCb Collaboration CERN (Geneva), EPFL (Lausanne), NIKHEF (Amsterdam), University of Glasgow,
Investigation of crosstalk in the readout structure of the Beamcal K.Afanaciev.
ATHENA - Module Construction P. Riedler, J. Rochet.
Progress with GaAs Pixel Detectors K.M.Smith University of Glasgow Acknowledgements: RD8 & RD19 (CERN Detector R.&D. collaboration) XIMAGE (Aixtron, I.M.C.,
SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Sensor and ASIC R&D Sensor Prototype Production: running, ASICs: Switcher,
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
A. Rivetti VIPS workshop-Pavia, April 23rd, 2010 The PANDA Microvertex Detector: Present Design and Opportunities for 3D Integration Technologies Angelo.
Medipix3 chip, downscaled feature sizes, noise and timing resolution of the front-end Rafael Ballabriga 17 June 2010.
Giulio Pellegrini Actividades 3D G. Pellegrini, C. Fleta, D. Quirion, JP Balbuena, D. Bassignana.
L. Bosisio - 2nd SuperB Collaboration Meeting - Frascati SuperB SVT Update on sensor and fanout design in Trieste Irina Rashevskaya, Lorenzo.
DEVELOPMENT OF PIXELLATED SEMICONDUCTOR DETECTORS FOR NEUTRON DETECTION Prof. Christer Fröjdh Mid Sweden University.
De Remigis The test has been accomplished with an SLVS signal, since that was chosen for the serial communication between the readout and the optical converter.
Sensors Pixel dimension 300 x 300 μm2 Standard p-in-n sensors
Progress with GaAs Pixel Detectors
The STS-module-assembly:
n-XYTER Hybrid Developments
The workflow of module assembly for the CBM Silicon Tracking System
Tracking detectors/2 F.Riggi.
Hybrid Pixel R&D and Interconnect Technologies
The Silicon Drift Detector of the ALICE Experiment
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Børge Svane Nielsen/JJG
detector development readout electronics interconnects bump bonding
SuperB SVT Definition of sensor design and z-side connection scheme
Charge measurement of STK
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

WG3 – STRIP R&D ITS - COMSATS P. Riedler, G. Contin, A. Rivetti – WG3 conveners

Outline  Aims of the strip upgrade  The present ALICE strip detector (SSD)  Proposal for a new sensor design  Ideas for the detector layout  Micro-cables for interconnections  ASIC specifications and development  Plans for assembly tests 2 Strip R&D

Aims of the strip upgrade 3  Cover a large area on the outer (2-4) ITSupgrade layers B. 2 layers (present SDD)~ 1.3 m 2 C. 4 layers (present SDD &SSD) ~ ( ) m 2  Manage higher multiplicity w/ low occupancy even at small radius (15 cm) to replace SDD  Provide tracking information w/ good resolution Spatial resolution: at least 20  m (r  ), 800  m (z) as the present SSD Connect tracks to TPC  Provide dE/dx for an improved PID over a dynamic range 0-15 Mips (for light nuclei & low mom. part.) with 0.1 Mip resolution (to separate different particle types) Strip R&D

The present ALICE strip detector: SSD 4 Strip R&D

R&D for the ALICE strip upgrade 5  Start from the present strip technology which is optimized for the present experimental conditions  Improve the strip system to meet the new ITS upgrade requirements (occupancy, data-format, acquisition rate, time resolution, extended PID,...)  Benefit from the past experience to get better reliability and uniformity of components Strip R&D

 The new strip sensor layout is being designed (Trieste group)  decrease the strip length from ~40mm to 20mm  cell size ~ -50%  C strip ~ -50%  2 x # of channels  same cluster size  2 rows of strips per sensor side Strip sensor layout draft 6 Strip R&D

Strip  cables design proposals  Double no. of channels requires a new Al-polymide  cable design draft 7 Strip R&D

Interconnection layouts & options 8  TAB bonding technique (allows chip tests, less material, safe folding)  Wire bonding (easier alignment) draft Strip R&D

Strip interconnections:  -cables  Discussion about specs with the Kharkov Group  Present SSD min trace pitch: 80  m  Past experience with prototypes: 46  m min. trace pitch 56  m min. trace pitch  Possible development of  cables with pitch ~ 50 um bonding and alignment becomes challenging needs to develop: new assembling technology sensor/ASIC/cables mock-ups for tests new hybrid (cable+chip) design 9 Strip R&D

Plans for assembly tests 10  Next steps:  Design the mask for a dummy strip sensor  Define the specifications for micro-cable prototypes  Evaluate different bonding techniques  Plan the production of the first dummy components  by the summer of 2011  Organize an assembly and bonding test with dummy components  by the end of 2011 Strip R&D

ASIC development 11 ASIC specsHAL25 (Present SSD)Upgrade target CMOS technology0.25 µm0.13 µm (?) Input pitch80 µm~44 µm On 2 staggered rows (?) ASIC size3.65 x mm x 6 mm 2 (?) Dynamic range1MeV ~ e- ≿ 1.3MeV (15 Mip) ~ e- Charge resolution~1 keV ~290 e- ~1 keV (0.1 Mip) ~290 e- Noise (ENC for 5 pF load cap.)< 300 e-  Investigating for available solutions for strip ASIC front-end chip: contacts with UK and CERN Groups  Specification definition in progress: Strip R&D

ASIC specifications 12 ASIC specsHAL25 (Present SSD)Upgrade target Peaking time1.4 – 2.2 µs≤1 µs Readout & FormatSerial, analogueDigital (?) ADCOff-detectorOn chip (?) Common Mode correctionOff-detectorOn chip (?) Power dissipation [µW] : Readout: Acquisition: 290 – 355 Better than present # channels per chip128 Total # of channels2.6 M~1 – 5 M (?) Expected Dose/Hadron Fluence (10 years) //30 kRad (TID) 6*10 11 cm -2 (hadron fluence in 1MeV n) Strip R&D

Summary 13  The aims of the strip upgrade are well defined  Clear ideas for the detector layout  Strip sensor design in progress  Different proposals for interconnections  Front-end ASIC: specs definition ongoing looking for partners to develop the chip  Test w/ dummy components to evaluate the assembly feasibility is planned Strip R&D