Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.

Slides:



Advertisements
Similar presentations
Cryogenic Experts Meeting (19 ~ ) Helium distribution system for Super-FRS dipoles and multiplets MT/FAIR – Cryogenics and Magnets Y. Xiang,
Advertisements

Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
Design pressure issues of Super-FRS dipole CrYogenic Department in Common System (CSCY), GSI, Darmstadt Yu Xiang, Hans Mueller* * Primay Beam Magnet Technology.
ESS Cryogenic System Design
Felix Wamers, Technical Coordination Meeting, 12 th -13 th of May CERN-GSI Technical Coordination Meeting Felix Wamers, Yu Xiang,
Test plan for the MICE SS cryostat and magnet Tapio Niinikoski LBNL Spectrometer Solenoid Workshop May 10, 2011.
Interface issues on Super-FRS magnets test at CERN
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
CRYOGENICS AND POWERING
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
The cryogenic systems of the ATLAS and CMS detectors Johan Bremer on behalf of TE/CRG 06/06/2013AFF.
CRYOGENICS FOR MLC Cryogenic Cooldown Scheme Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
GTK gas coolingsystem status Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi NA62 - GTK working group meeting
AT/ECR CRYOGENICS Organisation, Procedures and Communication with TCR Presentation for TCR-ECR-ACR Meeting 2003 by K. Barth.
Thermosiphon quality management and documentation EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
Subjects for SC FF magnet system at ATF2 Infrastructures at ATF2? How supply cryogen at ATF2 (set up cryogenic system?) (Gas helium recovery line?) Set.
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Luigi Serio CRYOGENICS PERFORMANCE AND OPERATION L. Serio, on behalf of the LHC Cryogenics Operation and Cryogenics Performance Panel.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
GLA2011 The cryogenic systems of the LHC experiments Johan Bremer on behalf of TE/CRG, ATLAS collaboration and CMS collaboration.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
The cryogenic system of the HIE-ISOLDE project and its related hazards for persons N. Delruelle on behalf of the TE/CRG group HIE-ISOLDE Safety Review.
AT-ACR B. VULLIERMECSOC Meeting 29 September Cryogenics for LHC Test Benches Safety Aspects Overview of the Test Station Overview of the Operation.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
ITER Liquid Helium Plants Status and Test Protocol ICEC June 29th, 2015 / Grenoble / FranceY. FABRE.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
Vacuum tank relief for Super-FRS long multiplet cryostat CrYogenic Department in Common System (CSCY) GSI, Darmstadt Yu Xiang.
CMTF Cryogenics Arkadiy Klebaner May 6, Outline CMTF cryogenic system scope Goals Key functional requirements Conceptual layout Cryoplant Current.
Overview of the ESS Linac Cryogenic Distribution System
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
Hongyu Bai LCLS-II 2 K Cold Box PDR September 27, 2016
Final Design Cryogenic and mechanical configurations
How Does HNOSS Operate? Rocío Santiago Kern 20th May 2016.
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
IT-4189 Supply and installation of a cryogenic distribution system
Cryogenic behavior of the cryogenic system
HFM Test Station Main Cryostat
Innovative He cycle Francois Millet.
Proximity Cryogenics P&IDs meeting
SPS cryogenic proximity equipment and SM18 validation
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Hollow e- lens, Cryogenic aspects
CRYOGENICS OPERATIONS 2008 Organized by CERN
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
Cryogenics – The Basics
Cryogenic behavior of the magnet
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers on behalf of CERN-GSI Technical Coordination Meeting ( )

1. Diagram for Process Definition of Operation Modes at Testing Phases. 2. Individual Operation Modes and their Logic Relations including Alarm and Interlocks Outlines

State Diagram of Cryogenic Magnet System during Test The scope of the diagram is limited on the states of three types of magnet cryostats: Long multiplet of 45 tons cold mass; Short multiplet of 17.4 tons cold mass; Dipole of 1.7 tons cold mass The process definition is based on the cryogenic flow scheme for magnet test facility at CERN. (FAIR_AP_B180_2014_08_28.pdf) and cryogenics at FAIR

Individual Operation Modes and their Logic Relations 1.Check-Up of Magnet Interface Connections at Warm Leak tests and purge; Ethernet communication, instrumentation and the signals on the test benches and on the magnet cryostats; Power cable connections, control valves and heating systems on the warm terminals of current leads; hand valves in helium gas collector system and instrumentation air supply and many others... PredecessorSuccessor Magnet installation on test benches; Jumper-Line connection to valve boxes Magnet Ready for Cryo-Operation

Individual Operation Modes and their Logic Relations 2. Magnet Ready for Cryo-Operation Cooldown may start upon manual operator request; PredecessorSuccessor Check-Up of Magnet Interface Connections at Warm; WarmUp 5K to 300 K Cool-down 300 K – 80 K;

Individual Operation Modes and their Logic Relations PredecessorSuccessor Magnet Ready for Cryo-Operation Cool-down 80 K - 5 K; Warm-up 5 K – 300 K. 3.a. Cool-down 300 K - 80 K Prerequisite to start the Cool-down mode: Cool-Down-Ready for at least one of the pre-coolers and for the cryoplant as well. Maintain temperature gradients over the magnet structures below 50 K; As default the cool-down rate is not larger than 1 K/hr.

Individual Operation Modes and their Logic Relations PredecessorSuccessor Cool-down 300 K – 80 K; LHe Emptying; Cold floating K; Quench recovery LHe filling; Warm-up 5 K – 300 K. 3.b. Cool-down 80 K - 5 K One of the main constraints for the fast cool-down from 80 K to 5 K is the available cooling power, e.g., liquid helium inventory in the dewar at the test facility. Request to end the cool-down mode is possible at any time during the full period of cool-down. Global status of the control loops for the refrigerators and the distribution system will be taken into account.

Individual Operation Modes and their Logic Relations PredecessorSuccessor Cool-down 80 K – 5 K; Cold Stand-by; Quench recovery. LHe Emptying; Normal Operation. 4. LHe Filling Liquid helium is filled into the helium vessel in the magnet cryostat up to the maximum level via the distribution system from the LHe Dewar. As an alternative, the Joule-Thomson expansion of supercritical helium may be used to fill the individual cryostats in case the dewar filling is not possible. To end the LHe-filling mode by following the LHe emptying mode, either actively via the evaporation of the heaters or passively via the static heat in-leak of the cryostats.

Cool-down time estimation for long multiplet and dipole cryostats

Individual Operation Modes and their Logic Relations 5. Normal Operation The cold mass is below 4.7 K, and The pressure in the helium vessel is below 1.55 bar, and Liquid helium is below the maximum level in the helium vessel of the magnet cryostats, and....

Individual Operation Modes and their Logic Relations PredecessorSuccessor LHe Filling; Current Leads Ready for Powering; Cold Stand-by; Current Leads Ready for Powering; LHe Emptying. 5. Normal Operation Liquid helium is above the minimal level for the cold terminals of the current leads, and The temperature at the warm terminals / flange of the current leads is close to room temperature, i.e., between 10 and 40 degrees Celsius, and The valves for the current-leads cooling-gas return are in operation.

Individual Operation Modes and their Logic Relations 10. Current Leads Ready for Powering The cold terminal is immersed in liquid helium at the regulation level according to the set point, e.g., 4 cm above the joints of the superconducting wires to the copper body. and

Alarms and Interlocks for current leads and helium level meter in the liquid helium dome of the long multiplet

Individual Operation Modes and their Logic Relations PredecessorSuccessor Normal Operation; Powering Permission (Slow-Discharge). Normal Operation; Powering Permission (Cryo-OK). 10. Current Leads Ready for Powering The temperature for the current leads at 90 % height towards the warm terminal end is regulated at the set point, e.g., 290 K +/- 2.0 K, and The temperature for the warm terminal flanges is above the dew point (10 ~ 40 °C), either maintained by the flange heaters or by the helium flow control.

Individual Operation Modes and their Logic Relations PredecessorSuccessor Current Leads Ready for Powering (Cryo- OK). Vacuum OK; Fast Discharge; Powering Permission (Slow-Discharge). 11. Powering Permission The interlock for Power Permission is authorized via a manual intervention by the cryogenic operator, based on:

Individual Operation Modes and their Logic Relations 11. Powering Permission Vacuum OK: Insulation Vacuum in Magnet Cryostat mbar Alarm H mbar Hardwired Stop Interlock to close valves in feedbox (Isolation Mode) 100 mbar Hardwired Stop Interlock to close valves in distribution box to limit helium loses

Individual Operation Modes and their Logic Relations 12. Quench Isolation mode All the cryogenic valves in the valve box are closed in order to limit the influence of the magnet quench on the individual test benches. This mode is also suitable for a catastrophic situation, e.g., the sudden loss of insulation vacuum in cryostat to air or to cold helium due to a breaking of process pipes. PredecessorSuccessor Powering Permission (Fast-Discharge). Quench recovery.

Individual Operation Modes and their Logic Relations 13. Quench Recovery Pressure in the helium vessel of the cryostat after quench may finally reach more than 2.2 bars. The vessel needs to be refilled with liquid helium via the LHe Filling mode. Once the temperature of the cold mass (dipole cryostat?) reaches more than 30 K, the cooldown mode from 80 K to 5 K may be necessary before the liquid helium is refilled. PredecessorSuccessor Quench Isolation mode. LHe Filling; Cool-Down 80 K – 5 K

Individual Operation Modes and their Logic Relations 6. Cold Stand-by Intermediate state when the shield cooling for one partly or fully LHe-filled cryostat is active only. If liquid helium is still left in the cryostat when the cold stand-by mode is terminated, the cryostat can be refilled via the LHe filling mode. Otherwise it goes automatically to the LHe emptying phase. PredecessorSuccessor Normal Operation. LHe Filling; LHe Emptying.

Individual Operation Modes and their Logic Relations 7. LHe emptying Liquid helium in the magnet cryostats is evaporated either by the heaters (the multiplets) or by static heat in-leak (the dipoles). It is ended when the liquid helium level is below 5 % of the total static head in the cryostat or the temperature of the cold mass is larger than 5 K.. PredecessorSuccessor LHe Filling; Cold Stand-by. Cool-Down 80 K – 5 K; Cold Floating 80 K – 100 K; Warm-Up 5 K – 300 K.

Individual Operation Modes and their Logic Relations 8. Cold Floating 80 K – 100 K It permits that only the thermal shield is actively cooled at around 80 K; Such a mode may be necessary for the possible long intervene during the pre-series magnet testing on the test bench; This mode is active only when the magnet is free of liquid helium. PredecessorSuccessor LHe Emptying. Cool-Down 80 K – 5 K; Warm-Up 5 K – 300 K.

Individual Operation Modes and their Logic Relations 9. Warm-Up 5 K – 300 K After liquid helium is free in the cryostats, the gas helium at 80 K from the precooler is used for the warmup of the cold mass up to 30 K; Then the helium gas temperature is increased by keeping the Maximum ΔT (GHe - magnet) = 50 K; The electric heating power is necessary when the cold helium gas needs to be heated up to 300 K after it comes out of the magnet. For the long multiplet warm-up, about 15 kW is needed at maximum. PredecessorSuccessor Cool-Down 300 K – 80 K; Cool-Down 80 K – 5 K; Cold Floating 80 _ 300 K; LHe Emptying. Magnet Ready for Cryo- Operation.

Warm-Up time estimation for long multiplet and dipole cryostats

The preliminary definition of the operation modes has been done for the Super-FRS magnet testing at CERN. Summary Thank you very much!