Eric Prebys LARP Program Director January 14, 2009.

Slides:



Advertisements
Similar presentations
ENERGY DEPOSITION IN HYBRID NbTi/Nb 3 Sn TRIPLET CONFIGURATIONS OF THE LHC PHASE I UPGRADE FermilabAccelerator Physics Center Nikolai Mokhov, Fermilab.
Advertisements

Overview of Possible LHC IR Upgrade Layouts CARE HHH-2004 Workshop CERN 8-11 November 2004 J. Strait, N.V. Mokhov, T. Sen Fermilab bnl - fnal - lbnl -
Round table magnet discussion and conclusions CARE-HHH IR’07 animated by W. Scandale and F. Zimmermann.
HL-LHC WP2 Brainstorming Meeting 1 Purpose of this meeting:  Introduce the main objectives of the new HL-LHC project: Prepare technical proposal by 2013.
Eric Prebys LARP Program Director 1/8/09.  This meeting will be both and update and an official response to the review of LARP which took place at LBNL.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
Eric Prebys LARP Program Director 1/8/09.  Background  Summary of review findings  Partial response  Coordination with CERN  New initiatives  Lumi.
LARP Program Perspective G. Apollinari - LARP Director FCC Week 2015.
Eric Prebys LARP Program Director Jaunary 14, 2009.
 Guidance from DOE  $13M with a 6 month continuing resolution at 84%.5*.84*13+.5*13 = $11.96M  Separate money ($1-2M) found for APL planning!  General.
Eric Prebys Fermilab APC Program Director, LARP April 15, 2010.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) February 16, 2010.
 Good  LARP has grown significantly in size since it started  Gained credibility both here and at CERN US Labs like it as a way to support work CERN.
Eric Prebys LARP Program Director 4/8/09.  All meetings will take place in Chardonnay room (partitioned for parallel sessions).  Wireless available.
LARP Accelerator Physics 19 June 2008 LARP+LAUC DOE Review, LBNL Wolfram Fischer/BNL BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Eric Prebys, Fermilab Director, LARP November 13, 2014.
Eric Prebys, Program Director US LHC Accelerator Research Program (LARP) 10/24/2008 Ultimate tribute Sept 10, 2008.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
Eric Prebys LARP Program Director 7/13/09.  Background  Summary of findings from last review  Partial response  Coordination with CERN  New initiatives.
Eric Prebys Accelerator Physics Center Program Director, LARP December 7, 2009.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
J. Strait Fermilab 16 October 2006 Consideration on LHC upgrade from A US perspective.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
F LHC Accelerator Research Program Accelerator Systems Tanaji Sen FNAL/APC  Project management  Accelerator Physics  Instrumentation  Beam commissioning.
View From CERN Summary of Upgrade Projects:  Phase 1 IR upgrade: construction project  LINAC4: construction project  Phase 2 collimation: design finalization.
2009 US LHC Users MeetingGianLuca Sabbi, LBNLUS LHC Accelerator Research Program © CERN US LHC Accelerator Research Program US LHC Users Organization Annual.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) March 15, 2011.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
LARP Accelerator Systems 6-Year Plan FY09-FY14 10 April 2009 LARP CM12 Napa, CA Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
SLAC Accelerator Development Program Tor Raubenheimer OHEP Accelerator Development Review January 24-26, 2011.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
Joint IR Studies: Operating Margins Nikolai Mokhov Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program LARP Collaboration Meeting SLAC.
Luminosity measurement at LHC (The machine point of view) Enrico Bravin AB/BDI Large part of the material presented here has been produced by the LBNL.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
U.S. Activities on the High-Luminosity LHC: LARP Sustainability & Evolution as a Construction Project HiLumi-LARP Collaboration Meeting October 26, 2015.
LARP Accelerator Systems Status & Plans 19 June 2008 DOE Review, LBNL Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Stuart Henderson Associate Laboratory Director for Accelerators Fermilab HiLumi LHC-LARP Meeting, Nov 11-15, 2013 The US Effort for High Luminosity LHC.
Eric Prebys LARP Program Director July 14, LARP FY10 and Beyond - E. Prebys 2 Guidance: LARP funding decreases $1M/yr Assume: $13 M LARP total for.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) February 4, 2011.
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Updates on Tevatron and LARP Vladimir Shiltsev FNAL/Accelerator Physics LARP/Accelerator Systems.
 Presented ongoing activities in LARP  Magnet Systems  Accelerator Systems  Program Management  Also presented plan for “spinning off” construction.
Eric Prebys, Fermilab Director, LARP October 29, 2010 *plus a bit of LAFS.
08/11/2007M. Giovannozzi – CARE-HHH-APD IR’071 Optics issues for Phase 1 and Phase 2 upgrades Massimo Giovannozzi, CERN Outline: –Option for Phase 1 and.
LARP Joint IR Studies A. Zlobin, Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program CARE-HHH-APD Mini-Workshop IR’07 Frascati (Italy),
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) May 16, 2011.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Eric Prebys, Fermilab Director, LARP November 13, 2014.
Global Collaborations Towards LHC Crab Cavity J. P. Koutchouk Thanks to Rama Calaga and Rogelio Tomas Crab Cavity Validity Requirement Workshop August.
Eric Prebys LARP Program Director 7/13/09.  Background  Progress and Highlights in 2010  Summary of findings from last review  Chamonix  New schedule.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
Eric Prebys Accelerator Physics Center Program Director, LARP Important material Contributed by Elliott McCrory (FNAL), Ryoichi Miyamoto (BNL), Alan Fisher.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
LARP Accelerator Systems D. Rice, J. Rosenzweig, M. White LARP 2009 review.
contribution to the round table discussion
LUMI06 preliminary conclusions
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
Overview Summer student lectures 2016
US LHC Accelerator Research Program (LARP)
LARP Role in Plans for HL-LHC Upgrades Giorgio Apollinari - US LARP Director USLUO, UW Madison – November 6th- 8th, 2013.
CLIC-ILC BDS & MDI work.
LHC Status, Upgrade Path, and US Contributions
LHC Status, Upgrade Path, and US Contributions
Frank Zimmermann & Walter Scandale
Thursday Summary of Working Group I
Presentation transcript:

Eric Prebys LARP Program Director January 14, 2009

 US LHC Accelerator Research Program (LARP)  Coordinates US R&D for the LHC FNAL, BNL, LBNL, SLAC, and some UT Austin  Some instrumentation deliverables for initial operation  R&D for future luminosity upgrades  Major effort to develop Nb3Sn magnets for Phase II upgrades  Accelerator Projects for the Upgrade of the LHC (APUL)*  Created partially in response to the problem with the lumi project (ie, large “hard deliverables”)  New program to coordinate larger scale construction projects for the LHC  Currently being organized around several phase-I activities  Peter Wanderer recently named head.  Exact scope and nature being determined January 14, 2009 E. Prebys, LARP US/CERN meeting 2 *formerly knows as “LAUC”

January 14, 2009 E. Prebys, LARP US/CERN meeting 3

 Schottky detector (ready)  Used for non-perturbative tune measurements (+chromaticities, momentum spread and transverse emmitances)  Tune tracking (ready)  Implement a PLL with pick-ups and quads to lock LHC tune  Investigating generalization to chromaticity tracking  AC dipole (ready)  US AC dipole to drive beam  Measure both linear and non-linear beam optics  Luminosity monitor  High radiation ionization detector integrated with the LHC neutral beam absorber (TAN) at IP 1 and 5.  Will be ready January 14, 2009 E. Prebys, LARP US/CERN meeting 4

 Rotating collimators  Can rotate different facets into place after catastrophic beam incidents  Aim for prototype in FY09  Crystal Collimation  CRYSTAL Collaboration  T980  Beam-beam studies  General simulation  Electron lens  Wire compensation  Electron cloud studies  Study effects of electron cloud in LHC and injector chain January 14, 2009 E. Prebys, LARP US/CERN meeting 5

 Crab cavities  Transverse fields rotate bunches to compensate for crossing angle in final upgrade  Goal: one cavity in Phase I upgrade, 2 (global) or 4 (local) in Phase II  Significant opportunity  Collaboration with KEK, CERN, and Daresbury  But big job, lots of $$  PS2 opportunities  Significant synergy with Project X  Ecloud  Injection, collective instabilities  Laser stripping  RF January 14, 2009 E. Prebys, LARP US/CERN meeting 6

 Magnet groups at FNAL, BNL, and LBNL working to develop 4m Nb3Sn magnet appropriate for use in the LHC Phase II upgrade.  Currently pushing all parameters  Long Quad (LQ): 4m quad with 90 mm aperture  High field Quad (HQ): 1m quad with 130 mm aperture  Plan first accelerator quality prototype (QA) to be plug compatible with Phase I NbTi magnets  Nb 3 Sn would give larger termperature margin  Parameters of final prototype (QB) will be determined by Phase II optics decisions January 14, 2009 E. Prebys, LARP US/CERN meeting 7

 Long Term Visitors program  Pay transportations and living expenses for US scientists working at CERN for extended periods (at least 6 months/year)  Interested parties coordinate with a CERN sponsor and apply to the program (Jim Strait)  Plan to support 4 in FY09  Toohig Fellowship  Named for Tim Toohig  Open to recent PhD’s  Successful candidates divide their time between CERN and one of the four host labs.  Currently 4 Toohig Fellows in program January 14, 2009 E. Prebys, LARP US/CERN meeting 8

 LARP is not really equipped to deal with large deliverables  Primarily an R&D organization  Insufficient contingency  APL is being developed to handle larger projects with hard deliverables.  Initially comprises projects for the Phase I upgrade.  Considering an ongoing relationship where LARP R&D feeds into APL projects.  More about this from Peter January 14, 2009 E. Prebys, LARP US/CERN meeting 9

 4/08, LARP CM10 collaboration meeting, Port Jefferson  6/08, LARP review, LBL  8/08, LARP management changes (Peggs->Prebys)  9/08, LHC starts up, for a bit  10/08, LARP CM11 collaboration meeting, FNAL  11/08, “APUL” project officially starts, aimed at hard deliverables for Phase I (primarily SC D1 separator dipoles)  1/09, LARP “mini-review”, DOE  1/09, CERN management changes (Aymar->Heuer)  1/09, Peter Wanderer named head of APUL  1/09, here we are January 14, 2009 E. Prebys, LARP US/CERN meeting 10

 There were comments at both the April LARP collaboration meeting and the June review to the effect that LARP was not communicating well with CERN about projects and priorities.  The bulk of the criticism in the report focused on the perceived “disconnect” between LARP and CERN regarding prioritization of LARP activities.  I believe this disconnect largely referred to activities related to the abortive attempt to get Nb 3 Sn magnets into the Phase I proposal (specifically, the JIRS group).  It's now realized this is not (and likely never was) realistic. We have suspended activities of the JIRS group, with the idea of restructuring it with an emphasis on the relationship between our magnet program and the phase II upgrade. January 14, E. Prebys, LARP US/CERN meeting

 General  LARP Liaison: Oliver Bruening Serves as primary “sounding board” for LARP proposals De-facto veto power over LARP projects (No CERN interest= non-starter)  US/CERN meeting Once a year Discuss general priorities and strategy Should we do this more often?  LTV/Toohig fellows Establish a significant body of “man on the street” impressions of CERN interest January 14, E. Prebys, LARP US/CERN meeting

 Specific  Alex Ratti has been working closely with Enrico Bravin (responsible for LHC luminosity measurement) on the completion and handoff of the lumi monitor  Rama Calaga is working closely with CERN people to coordinate crab cavity effort  Tom Markiewicz is working closely with Ralph Assmann (head of LHC collimation) on the potential use of the rotatable collimators  Uli Wienands has been working with Oliver Bruening and CERN in general to identify the best ways for LARP to contribute to the PS2 effort. January 14, E. Prebys, LARP US/CERN meeting

 In the absence of a big surprise from the DOE, LARP will be resource limited for the foreseeable future.  We hope that in areas of accelerator systems, CERN can help us apply our resources in the most effective manner among the possible activities, including:  Ongoing work Ecloud Beam beam (including electron lens) Crystal collimatoin Optics (Phase I and Phase II)  New activities Crab cavities PS2  In the area of magnet systems, we hope CERN can help us establish a time line for delivery of a viable Nb3Sn prototype. January 14, 2009 E. Prebys, LARP US/CERN meeting 14