Unapplied Cash: eIKON Dealer Compensation Joyce Darson NE Region CCC.

Slides:



Advertisements
Similar presentations
Process and Product Quality Assurance (PPQA)
Advertisements

Bringing Visibility and Control to Your Operations.
Milestone 3 Review Analysis Phase Complete Cost Data Integrity Project November 29, 2007.
Computer Engineering 203 R Smith Project Tracking 12/ Project Tracking Why do we want to track a project? What is the projects MOV? – Why is tracking.
RIT Software Engineering
SE 450 Software Processes & Product Metrics 1 Defect Removal.
Six Sigma Quality Engineering
The Quality Improvement Model
The Click Company. Overview Analyze advertising & sales rep data in 40 randomly selected territories Influence that sales rep and advertising has on annual.
Barry Murash MBBit Nortel 2007
Chapter 18 Optimizing and Controlling Processes through Statistical Process Control.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
“Safety is a Measure of Success”
Complete and Integrated Lifecycle Management. Challenges 1.
AQIP Quality Checkup Visit Six Sigma Annette McIver Project Coordinator Human Resource Development/ SkillsMAX March 14, 2008.
1 Software Quality Engineering CS410 Class 5 Seven Basic Quality Tools.
Copyright Course Technology Chapter 16: Closing.
Welcome to Lean Six Sigma Green Belt Training
0 0 Six Sigma – Financial Overview. 1 1 Roles and Responsibilities of the Finance Support Team Policy Setting – Define Savings/Benefits – Provide tools.
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
Revenue Management System. Agenda An Overview of  RMS Features  DSW in RMS context.
1 Project Kick Off Briefing Cost Data Integrity Project August 30, 2007.
Overview & High Level Plan Date: Team: Todd Kaywood, Alex Wiechers, Andy Idema.
1 Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
1 DMAIC Define Overview Paul Grooms Black Belt in Training.
Cost Management Session 3. Overview Theory Exercise: 1.39; 1.42; 1.50;
Project Storyboard (Page 1 of 2)
SOFTWARE PROJECT MANAGEMENT
© 2002 Six Sigma Academy0 Define Point one Point two Point three Increase Market Share.
© 2002 Six Sigma Academy0 Define Point one Point two Point three Workman’s Compensation.
Price Support (Vendor Rebates) Outside Vendor Window Black Belt: Debbi Youmans-McCreary Division: INA - eIKON BU – Ops/Vendor Credits/Southeast.
Assets Returned From Lease Project: Bill Cody Black Belt September 25, 2003.
Inconsistent Administration of Sales Commissions Status Report August 28, 2003 Norcross, GA.
Unapplied Cash: eIKON Dealer Compensation Joyce Darson NE Region CCC.
Inaccurate Cycle Billing Records in OMD - Northeast Black Belt: Jim Palmer Division: Operations/Northeast BU – Steering Comm Presentation.
Contract Termination/ Save the Customer Accountability Black Belt-G.K. McCown Service Division BU – Dallas, TX.
Contract Setup Accuracy Project Black Belt: Rob Vaughn Week 2 Presentation Define and Measure Phase.
Working Capital - > 90 Day Delinquency Project – Heath Peacock Finance Tempe, AZ - CCC.
Meter Reads-Method Project Number Black Belt Rob Zinsky Northeast region.
Sales Forms Package Art Zieky INA-Sales Operations Macon, Malvern.
David Pasquarello Ikon Office Solutions
Six Sigma Black (& Blue) Belt: Jeanette Wall. Unapplied Cash-Calculation Error Jeanette Wall Operations Location- Company-wide CANCELLED!
Contract Termination/ Save the Customer Accountability Black Belt-G.K. McCown Service Division BU – Dallas, TX.
Meter Reads-Optimum Calling Process Project Number Black Belt Rob Zinsky Northeast region.
Roles and Responsibilities of the Finance Support Team
Price Support (Vendor Rebates) Outside Vendor Window Black Belt: Debbi Youmans-McCreary Division: INA - eIKON BU – Ops/Vendor Credits/Southeast.
Sales Turnover Project: Sharon Smith Black Belt Salt Lake City, UT.
Collections Accountability Leases that Terminate into Term Code TMDCR Tom Merry October 23, 2003 Week 4 Presentation.
Assets Returned From Lease Project: Bill Cody Black Belt Week 3 Report Out.
Green Belt – SIX SIGMA OPERATIONAL Intro to Analyze Phase.
DMAICTools.com thanks our industry partners for sharing their forms - use it, improve it, share it, send us back a better version!
Inaccurate Cycle Billing Records in OMD - Northeast Black Belt: Jim Palmer Division: Northeast BU – Forecasting/Service/ Revenue/Base/Type of Machine.
Contract Setup Project Black Belt: Rob Vaughn Week 3 Presentation Houston, TX.
Unapplied Cash – Canon & Ricoh Credits, Discrepancy in System Project # Black Belt - Jonathan Williams Division- Service/ Order Entry/Vendor.
Credit/Rebill – Field Service Incorrect Billing. The Problem We are generating invoices for service calls on machines that have contracts, are IKON fixed.
HOPE July 23, 2015 Hackett Oracle Performance Exchange.
1 Six Sigma Green Belt Selecting & Implementing Countermeasures Sigma Quality Management.
Inconsistent Administration of Sales Commissions Project Status October 23, 2003 Norcross, GA.
Canon Strategic Marketing Plan - Supply Credits Marcus Downey South Region.
Meter Reads- Web Meter Effectiveness Project Number Black Belt Cathy Delvalle Atlanta CCC.
Six Sigma Greenbelt Training
Lean Six Sigma Road Map Improvement Process Road Map
DRIVING IMPROVEMENTS Through Six MahindraSatyam
Quality Management Six Sigma
New Mexico Department of Health Immunization Program
Amendment Invoice Task Force Progress Report
Amendment Invoice Task Force Progress Report
Amendment Invoice Task Force Progress Report
Amendment Invoice Task Force Progress Report
Presentation transcript:

Unapplied Cash: eIKON Dealer Compensation Joyce Darson NE Region CCC

2 Agenda n Project Overview n Baseline information n Analyzing the data n Recommendations n Next Steps n Questions/Open Discussion

3 Project Overview n We bill equipment leases and service contracts to IOSC n IOSC funds us weekly through the “dealer compensation report” n Frequent discrepancies between Oracle & IOSC systems n Result: n Cash will not automatically apply n Research, rework, added costs to apply cash at MSSC and CCC’s n Project and data are focused on eIKON environment only

4 Project Overview, continued n Baseline DPMO = 196,500 n Sigma Level =.85 n Defect = any dealer compensation cash that cannot be automatically applied

5 Project Status vs. Plan Project Milestones: Target DateStatus Define Phase08/22/03Complete Measure Phase09/19/03Complete Analyze Phase10/31/03On track Improve Phase11/28/03On track Control Phase12/31/03On track

6 Project Objectives & Benefits n Project Objective: - 70 % reduction in discrepancies between Oracle & CLAS (dealer compensation only). - Improve Sigma) to 2.3 n Project Benefits: - Estimated headcount savings of 12 and $440K per year from FY 2004 plan of 34; (reduction in required headcount for reconciliation and research). - Existing resources will be re-allocated to support future migrations. - Additional benefits in reduced rework/research at CCC’s (not quantified).

7 % Automatically Applied July- Sept: Average 80 % automatically applied Oracle conversion Avg.80 %

8 Process Capability (Baseline) As of 8/03, 100 % of process is outside target Target = 92 %

9 Process Issues Start End Process Issue & Backlog Process Flaw Need training Training issues & errors

10 Next… Analyzing the Results

11 Cause & Effect Matrix, FMEA n Used to determine top 8 – 10 Inputs into process n Identified as the following: n Employee Training n Funding amount n Lease information (rate, term, type) n “Closed” order n Oracle invoice # n Residual & buyout amounts n Next: examined each input for what could go wrong, and ranked issues according to frequency, impact, and causes (FMEA) n Gathered data on high value X’s from FMEA

12 FMEA & Data Collection Results Team input (“gut” feel) Actual Data !!

13 Regression Analysis If we can control the invoice #, we can control the unapplied cash

14 Other Analysis Used ANOVA method Found statistically significant difference between Atlanta and old CED/SWD Atlanta Avg 71 % CEDAvg 85 % SWDAvg 86 % More errors / discrepancies in Atlanta than Houston Better Results

15 Researched results, Atlanta vs. Houston n Detailed process review, each location n Process same in each area n Houston began doing audits August 2003 n No formal lease training available n Lack of tenure/experience in Order Coordination area n Number of processing centers for leases: n Atlanta: 11 locations n Houston: 4 locations n Less is better n Allows for more consistency in process

16 Recommendations n Process Changes: n Generate invoice after OC validation of funding n Fix errors found during validation prior to IOSC receiving deal n Address/eliminate backlog in credit/rebill area n Fewer locations for lease processing n IT Changes: n Automate upload of Oracle invoice # to CLAS system n Fix Oracle “glitch” causing multiple invoice #’s n Training: n No formal lease training n Too few “Subject Matter Experts” n Existing training: not process orientated

17 Next Steps n Continued data collection, based on information received 10/16/03 n Details of invoice number issues n % of deals requiring funding change after Oracle invoice generated n Due 10/27/03 n Complete detailed statistical analysis (10/31/03) n Begin Improve Phase (November)

18 Conclusion Questions & Discussion