NAESB BPS Yasser Bahbaz– IDCWG Chair January 5 th, 2016.

Slides:



Advertisements
Similar presentations
2 Draft of proposed metrics for the WEQ BPS to conduct analysis and evaluation of the Parallel Flow Visualization pilot project. (PFV Pilot)
Advertisements

Flowgate Allocation Method Examples of Proportional Curtailment of FIRM PTP and GTL Houston, December 1-2, 2010.
Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.
Business Practices Subcommittee Update April 30, 2013.
Business Practices Subcommittee Update August 20, 2013.
Parallel Flow Visualization and Flowgate Allocations Equity Concerns of Non-Market Transmission Owners Equity Concerns of Non-Market Transmission Owners.
Commercial Implications of ERR Calculations Option 3 method vs. Transaction method.
First to Curtail – Last to Curtail Examples December 1 – 2, 2010 (Revised based on Requests/Suggestions During Review) 1.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair May 17 th, 2012.
Business Practices Subcommittee Update October 23, 2012 DRAFT.
Interchange Distribution Calculator Working Group (IDCWG) Update Jim Busbin IDCWG Chairman NAESB WEQ BPS Meeting Minneapolis, Minnesota November 10-11,
Parallel Flow Visualization/Mitigation Proposal
Business Practices Subcommittee Update August 17, 2010.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair November 9 th, 2011.
NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
Interchange Distribution Calculator Working Group (IDCWG) Update IDCWG October 12 th, 2011.
Road Map To Development September 2013 December 2013 February 2014 April 2014 July 2014 Data Submission WEQ 008 Assessment CO 283 Report GTL COs Draft.
E-Tag 1.8 An industry tutorial.
NAESB Coordinate Interchange
1 Credit for Redispatch Small Group Review of Unconstrained MFs NAESB BPS Meeting December 14-15, 2011.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair September 13 th, 2012.
Business Practices Subcommittee Update October 26, 2010.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair April 4 th, 2012.
White Paper on the Future of Congestion Management IDC Granularity Task Force Standing Committee Meetings July 20-22, 2004.
Business Practices Subcommittee Update February 2, 2010.
Business Practices Subcommittee Update February 1, 2011.
Business Practices Subcommittee Update April 30, 2012.
North American Energy Standards Board Upadate Presented by Bob Harshbarger.
Dynamic Schedule e-tagging Requirements Criterion WECC-087 (formerly INT-008) ISAS Report January 2012.
Overview Seams Coordination Process. 2 Introduction Midwest ISO Non-profit organization that manages the reliable flow of electricity across much of the.
Dynamic Transfers Bob WECC MIC Meeting “The Last Hurrah!”
FERC Order minute Scheduling.
FEBRUARY 27, 2013 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS Parallel Flow Visualization Overview 1.
IDCWG Update. September 2013 December 2013 February 2014 April 2014 July 2014 Data Submission WEQ 008 Assessment CO 283 Report GTL CO’s Draft CO’s Development.
Pseudo-Tie Reservations
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Thursday, January 19, :00 to 4:00 p.m. EST 4 th Quarter
UFMP methodology changes in the updated webSAS February 2015 A video presentation reviewing the webSAS UFMP methodology changes going into effect March.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
Business Practices Subcommittee
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Thursday, December 2, :00 to 3:00 p.m. EDT.
Business Practices Subcommittee Update May 4, 2010.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
Reload PFV September 12, Reload PFV  Concern that need to be addressed:  The RC need to have an option in PFV to allow gradual reload of markets.
Flowgate Allocation Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
Parallel Flow Visualization Project NERC ORS Meeting May 4, 2011.
Business Practices Subcommittee Update Executive Committee Meeting October 20, 2015.
NAESB WHOLESALE ELECTRIC QUADRANT BUSINESS PRACTICES SUBCOMMITTEE ACTIVITIES UPDATE TO JOINT ELECTRIC SCHEDULING SUBCOMMITTEE JANUARY 5, 2012 BY ED SKIBA.
Standards Review Subcommittee Update August 17, 2010.
2013 Wind Conference. Congestion Management & Communication Processes CJ Brown.
Generator Prioritization Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
Interchange Distribution Calculator Working Group (IDCWG) Update Yasser Bahbaz IDCWG Chair BPS Update September 13 th, 2011.
Business Practices Subcommittee Update Executive Committee Meeting April 29, 2014.
Business Practices Subcommittee Update Executive Committee Meeting August 18, 2015.
Parking Lot Item 19. BPS Bert Bressers 10/31/2011 Firm rights of resources that have a Firm priority to what load (Sink area granularity)
Business Practices Subcommittee Update August 16, 2011.
Business Practices Subcommittee Update Executive Committee Meeting February 23, 2016.
NAESB BPS UPDATE TO EXECUTIVE COMMITTEE AUGUST 21, 2012 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS PARALLEL FLOW VISUALIZATION PROJECT 1.
1 Parallel Flow Visualization Goals NAESB BPS Meeting September 15-16, 2010.
RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR.
Interchange Distribution Calculator Working Group (IDCWG) Update
Business Practices Subcommittee Update
Interchange Distribution Calculator Working Group (IDCWG) Update
Business Practices Subcommittee Update
Business Practices Subcommittee Update
Pseudo-tie business procedure
Enhanced Curtailment Calculator (ECC)
UFMP methodology changes in the updated webSAS
Two-Tier Firm Curtailment Overview
NERC Congestion Management
Pseudo-tie business procedure
Presentation transcript:

NAESB BPS Yasser Bahbaz– IDCWG Chair January 5 th, 2016

 Provide a high level design of IDC Change Order designing implementation of WEQ -008 Standards in IDC  Share Change Order Implementation time line and projected Parallel Trials date

 Method to Submit Intra BA Transactions *  Tag Second Networks Transmission Service ◦ Transactions *  Intra BA NIT and PTP  Generator Priority Schedules *  Dynamic Schedules*  Pseudo Tie Arrangement *  TLR Log Access  Seams Agreements – GTL Priority Overrides  Real Time Visualization  Credit for Re-dispatch *  Gen-To-Load Reload Process – Shortfall / Excess *  Curtailment Process in IDC

 Designation in the Book of Flowgate by BA  Can only be updated or set during the IDC model upload  Any priority submitted in conflict with designation will be accepted but not used in Congestion Management Process

 Intra BA PTP Transactions  Relief allocated must be given by curtailing the transaction  Gen-to-Gen aggregate type TDF calculation  Intra BA NITS  Relief allocated to transactions may be provided via GTL  Gen-To-Load TDF calculation

 Gen priorities must be submitted no later than 20 minutes prior to TLR to be used in congestion management process for current hour  LSE’s or BA’s may submit priorities for generators at MW blocks for each TSP  Default of Firm priority applies to those generators with no priorities submitted.  Default of Zero priority applies to those generators with a partial MW priority submitted

 Real Time MW’s associated with the Dynamic transaction may be submitted by the entity.  The designated real time MW’s will replace the transaction profile for Congestion Management purposes  TDF calculation impact will follow that similar to all interchange transactions ◦ Gen-to-Gen impact calculation, with the Gen being as granular as the Source or Sink specify

 Tagging the pseudo tie MW’s ◦ Designation of resource is needed ◦ If MW’s of resource exceed allocation priority on the transaction, priority of Zero is assumed ◦ TDF is Gen-to-Gen Aggregate ◦ Relief allocated to the transaction may be provided from GTL of the BA  Generation Prioritization of the Pseudo Tie ◦ Gen priority submitted on the pseudo tied generation is less than the output of the resource, MW’s remaining default to priority of Zero.

 IDCWG agreed to implement two options, only one of which may be triggered at a time during testing and (maybe) Trials.  Neither Options are that lined out in the white paper.  IDCWG’s position is methodology specified in white paper does not address reliability.

 Option 1- ◦ No credit for over-relief (or exceedance) and using only previous hour as basis for initials ◦ Entities may only be credited for that following hour for a MW up to relief requested amount.  Option 2 – ◦ Conditional Rolled-over credit for over-relief  Entities may only be credited for instructed curtailment that they may provide  If entity provides more relief than instructed, they are be credited for additional MW’s up to any shortfall that materialized during that hour from other BA’s.

 Shortfall / Exceedance calculation specified in the white paper and how it’s incorporated in the TLR process was also modified by IDCWG to ensure that this incents right behavior but also ensures reliability of the system.  White paper mentioned that any exceedance or shortfall calculation as highest or lowest sample of the hour respectively, should apply to hour + 2 as credit or discredit.

 IDCWG proposed the following methodology in the Change Order ◦ Shortfall is calculated as the aggregate shortfall for the duration of the TLR event of all four 15-minute GTL calculation comparing GTL Actual to GTL Target ◦ Once a reload is triggered for a GTL product, BA’s maybe reloaded pro-rata on GTL Actual adjusted by a term that is directly correlated by their TLR event performance.

 Entities with an accumulated net shortfall will see GTL reload that is adjusted down pro-rata to the shortfall accumulated  Entities with no shortfall during the TLR event will see a reload towards their unconstrained system at a faster rate during that reload hour.  IDCWG thinks this incents good behavior without jeopardizing system reliability.

 IDCWG is implementing what was specified in the standards and the white paper – for the most part.  Credit for Re-dispatch and Shortfall/Exceedance items were big topics at IDCWG.  These two require a delicate balance between reliability and equity and if addressing one more heavily than the other may cause operations concern.  IDCWG believes that it found a balance for incenting or penalizing non-performers in a way that impacts reliability and give the RC’s a better handle and confidence in system control from a congestion management standpoint.

September 2013 May 2015 July 2015 November 2015 November 2016 CO 283 Data Submission WEQ 008 Assessment & OATI’s estimate of the project cost CO 283 Report PFV CO’s Draft PFV CO’s Development Key Assumptions: -Agreement for funding of the Change Orders required and IDC Association support of the CO’s development Current State: CO Evaluation in progress

March 2017 June 2017 August 2017 Testing Testing Result Report Implement CO’s Start of Field Trial Period