LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL1 LARP Cable R&D FY05 & FY-06 Plans D.R. Dietderich, LBNL Geneva, IL October 5-6, 2005 bnl – fnal – lbnl.

Slides:



Advertisements
Similar presentations
May 9, 2012D. R. Dietderich, LARP CM-18 Cable Fabrication Plans and Experience D.R. Dietderich Lawrence Berkeley National Laboratory bnl - fnal- lbnl -
Advertisements

Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
LARP MSM Conductor, Cable and Procurement - A. Ghosh1 Strand, Cable and Procurement BNL -FNAL - LBNL - SLAC Magnet Systems Meeting Jan 09, 2014.
1 LARP Magnet Program G. Ambrosio Many slides from (with a few modifications): Jim Kerby for the LARP Magnet Collaboration 25 October 2006 Rad-Hard Insulation.
Outline: Goals for the cable development at CERN. Main parameters of the cable. Cable development work for a cable width of 15.1 mm and for a cable width.
Oct , 2013, CDP D.R. Dietderich LARP Conductor & Cable Review 1 Conductor Development Program Support for LARP and HiLumi LARP- HiLumi Conductor.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
DOE Review of LARP – February 17-18, 2014 QXF Conductor and Cable Arup K. Ghosh Feb
Collaboration Mtg, St Charles, IL 10/5-6, 2005 A. Ghosh1 Conductor R&D Plan Arup K. Ghosh BNL.
MQXF RRP® Strand for Q1/Q3 A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Status of MQXF Conductor LARP Update
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
RRP & PIT Deformation & RRR Comparison: M. Brown, C. Tarantini, W. Starch, W. Oates, P.J. Lee, D.C. Larbalestier ASC – NHMFL – FSU M2OrA – 05 06/30/15.
QXF Cable Status D.R. Dietderich Conductor Working Group Video Meeting, Sept. 17, 2014.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
Quality assurance of the QXF- Q2 Nb 3 Sn cable mass production C. Scheuerlein, 6 November 2014 HL-LHC/LARP International Review of the Superconducting.
1 SIS 300 Dipole Low Loss Wire and Cable J. Kaugerts, GSI TAC, Subcommittee on Superconducting Magnets Nov15-16, 2005.
ASC 2014Nb 3 Sn Block Coil Dipoles for a 100 TeV Hadron Collider – G. Sabbi 1 Performance characteristics of Nb 3 Sn block-coil dipoles for a 100 TeV hadron.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Large Hadron Collider Accelerator Research Program Dimensional Changes of Nb 3 Sn Cables during Heat Treatment LBNL: Ian Pong Dan Dietderich.
15 Th November 2006 CARE06 1 Nb 3 Sn conductor development in Europe for high field accelerator magnets L. Oberli Thierry Boutboul, Christian Scheuerlein,
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
LARP Collaboration Meeting, April 26-28, 2006Gian Luca Sabbi HQ Design Study (WBS ) LARP Collaboration Meeting April 26-28, 2006 N. Andreev, E.
D.R. Dietderich Frascati, Italy Nov , 2012 RRP-NbSn Conductor for the LHC Upgrade Magnets RRP-Nb 3 Sn Conductor for the LHC Upgrade Magnets A. K.
Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh1 LARP Strand: Specifications, Procurement and Measurement Plans.
1st FNAL-CERN Collaboration Meeting Fermilab, May 13, 2011
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
16 T Dipole Design Options: Input Parameters and Evaluation Criteria F. Toral - CIEMAT CIEMAT-VC, Sept. 4th, 2015.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
HE-LHC, 10/14/2010GianLuca SabbiUS LARP Magnet Development LHC Accelerator Research Program Magnet Development GianLuca Sabbi for the US LARP collaboration.
E. Todesco OUTPUT OF THE CABLE REVIEW E. Todesco and the QXF team CERN, Geneva Switzerland CERN, 10 th December 2014 QXF design review, CERN.
LARP CM17, 11/16/2011Magnet Systems Overview – G. Sabbi 1 Magnet Systems Overview GianLuca Sabbi LARP Collaboration Meeting 17 November 16, 2011 BNL -
Outline: Strand R&D and strand procurement and inventory. Main parameters of the cable without a core. Results obtained during the cable development without.
24 Th January Status of the Conductor Development Status of the manufacturing for Alstom Status of the manufacturing for SMI L. Oberli.
Next Steps in Magnet R&D Steve Gourlay LBNL EuCARD Workshop on a High Energy LHC Malta October 14, 2010.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
1 Cable Functional Specification March Conductor Working Group Arup K. Ghosh (BNL)
29 th September 2009 EuCARD-WP7 HFM Conductor specification and procurement Luc OBERLI CERN, TE-MSC-SCD.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
Discussion about the technical specification of the Nb-Ti strand and Rutherford cable for the MCBXF corrector magnets.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
LARP Collaboration Meeting 15 Nov 1-3, 2010 A2C- Materials Working Group Arup Ghosh (coordinator), Emanuela Barzi, Dan Cheng, Dan Dietderich, Soren Prestemon,
LHC Performance Workshop 2012Nb 3 Sn IR Magnets – G. Sabbi 1 New Magnets for the IR How far are we from the HL-LHC Target? BNL - FNAL - LBNL - SLAC GianLuca.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
LARP DOE Review July 13-14, 2009Materials – Conductor Support - A. Ghosh1 LARP DOE Review July , 2009 FNAL 2.4 Materials – Conductor Support Arup.
Conductor Requirements for Magnet Designers DOE- Conductor Development Program Daniel R. Dietderich Superconducting Magnet Program Office of Science ICFA.
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
QXF Cable with Annealed Wire D.R. Dietderich QXF Working Group Video Meeting, Feb. 12, 2014.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
Procurement of Nb 3 Sn strand, cable fabrication, and quality control for the U.S. Hi-Lumi LHC Accelerator Upgrade Project Lance Cooley, Fermilab L3 manager.
Lessons learnt from CERN experience
MQXF cable with RRP wires for Q2
Development of Nb3Sn (and Bi-2212) strands in preparation for the FCC
11 T cable development and procurement strategy at CERN
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
Development of High Current Nb3Sn Rutherford Cables for NED and LARP
CERN Conductor and Cable Development for the 11T Dipole
To be presented at Nb3Al R&D Review,
Procurement of Nb3Sn strand for coils assembled at CERN
EuCARD2 WP 10.2 HTS Conductor
MQXF cable with RRP wires for Q2
Presentation transcript:

LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL1 LARP Cable R&D FY05 & FY-06 Plans D.R. Dietderich, LBNL Geneva, IL October 5-6, 2005 bnl – fnal – lbnl – slac US LHC Accelerator Research Program

LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL2 Conductor Development Program Long Range Goals –J c = 3000 A/mm 2 –D eff = 40 microns or less –Piece length > 10,000 m –Heat treatment < 400 hr –Cost: < $1.50/kA-m (12 T) Progress (FY05) –J c >3000 A/mm 2 –(RRR>100, Is~1150A) –Practical demos in progress – 3,000-4,000m –150 hr –$ 5.50/kA-m (RRP)

LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL3 Oxford Wire and Number of Element Number of elements in each ring: –1, 6, 12, 18, 24, 30, 36 Sum of rings –1, 7, 19, 37, 61, 91, 127 –HD-1 was 54/61(50% Cu) –New R&D 60/61 (40%Cu), 90/91 (40%Cu), 84/91 50%) 126/

LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL4 CDP Inventory of Nb 3 Sn +12kg Nb/NbTi Rod

LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL5 HEP R&D Conductor Sub-element study (High-Sn core, Nb-Ta alloy rods) Stack Delivery Date Quantity Magnet –84/91Oct. 1415kg (30kg) SR-01 –108/127Oct. ?(30kg) ? –198/217Sept.½ kg(15kg) Doping study (High-Sn core, Nb/NbTi rods) –84/91Nov. 30 ?(30kg) ? 0. 7 m m

LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL6 CDP Orders for LARP Quantity Delivery Date Stack Magnet 33kgat LBNL 54/61 SR-01? 35kgNov /61 ? 35kgNov /91? 90kgMar. 0684/91 or 54/61? High-Sn Core and NbTa alloy rods

LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL7 Strand for SR-01& LR-01 Plan A if both SR and LR are to be made from same type of conducgtor Billet 8220 with a 54/61 stack: –Billet 8220 Properties for HT at 650C for 48h J c ~3,000A/mm 2 at 12T, 4.2K I s ~1150A RRR>170 –TQ-type cable made with RRP Extracted strands being HT at BNL –HT is 635C for 48h and 96h Once stability of extracted strand is known make decision about billet configurations

LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL8 Strand for SR-01& LR-01 cont. Plan B if SR and LR can be made from different types of conductor Use 84/91stack for SR-01 if it meets LARPS criteria of RRR and Is. –Since Oxford is having processing issues with the 84/91 LR-01 made not be made from the same material

LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL9 Cabling Tasks for FY-05 Proto-type cable for TQ to establish TQ cable parameters –26, 27, 28 Strands –Keystone Angles of 1.0 and 1.3 degrees Cable for TQ magnets –Practice: 3 UL + 3 UL extra (2 UL remain at FNAL) –Production: 10+ UL Cable for SQ-02

LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL10 Final TQ Cable 1.Fabricate cable slightly over size 2.Anneal at 200 o C for 4h 3.Re-roll to decreasing thickness by  m to compact cable to make it more mechanically stable

LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL11 FY-06 Magnet Cable

LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL12

LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL13 End

LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL14 FY-06 R&D Effort New Strand –TQ or SQ prototyping –Develop cabling parameters Residual twist in cables Fully keystoned narrow cables Core cables

LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL15 TQ Candidate Strands in CDP/HEP Inventory XXXX 54/ %>50April or May delivery CDP/HEP R&D CDP/HEP Purchase

LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL16 Possible Strand for TQ1a Conductor needed: 25kg minimum Jc (12T, 4.2K): 2,000-3,000A/mm 2 RRR: >50 Stability Current I s (4.2K): >650A Strand /91 stack

LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL17 Conductor Properties