COPYRIGHT © 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED. Monitoring in TOSCA – Future Use Cases Presenter: Ifat Afek, Alcatel-Lucent September 2015.

Slides:



Advertisements
Similar presentations
1 First NIR Meeting Current NIR Address Request Process Overview and Proposal March 1st, Korea, Seoul.
Advertisements

Module 12: Enabling Business Activity Monitoring.
PagerDuty Integrations Rey Ong March Copyright © 2013 AppDynamics. All rights reserved. Business Value.
Making Fly Parviz Deyhim
GENI Experiment Control Using Gush Jeannie Albrecht and Amin Vahdat Williams College and UC San Diego.
Data Breach Notification Toolkit Mary Ann Blair Director of Information Security Carnegie Mellon University September 2005 CSG Sponsored by the EDUCAUSE.
TOSCA Monitoring Straw-man for Initial Minimal Monitoring Use Case Roger Dev CA Technologies April 24, 2015.
Improved software quality through semantic descriptions (Skutt) Karlstad University Dept. of Computer Science UML introduction A short introduction.
1 On Handling QoS Traffic in Wireless Sensor Networks 吳勇慶.
590ES1 Design of Plant Care System Mike Swift Steve Swanson Stefan Bjarni Sigurdsson.
Satzinger, Jackson, and Burd Object-Orieneted Analysis & Design
1 Introduction to Load Balancing: l Definition of Distributed systems. Collection of independent loosely coupled computing resources. l Load Balancing.
(OpenStack Ceilometer)
IS&T Project Management: How to Engage the Customer September 27, 2005.
Mobility in the Virtual Office: A Document-Centric Workflow Approach Ralf Carbon, Gregor Johann, Thorsten Keuler, Dirk Muthig, Matthias Naab, Stefan Zilch.
16.1 © 2004 Pearson Education, Inc. Exam Managing and Maintaining a Microsoft® Windows® Server 2003 Environment Lesson 16: Examining Software Update.
Cracow Grid Workshop 2003 Institute of Computer Science AGH A Concept of a Monitoring Infrastructure for Workflow-Based Grid Applications Bartosz Baliś,
Chapter 13 Starting Design: Logical Architecture and UML Package Diagrams.
TOSCA Topology and Orchestration Specification for Cloud Applications International Cloud Symposium October 10-12, 2012 Paul Lipton, VP Industry Standards,
TOSCA Monitoring Working Group Status Roger Dev August 10, 2015.
1 Jeremy Oakes – GlobalNOC/GMOC Specialized Support Technician.
Trimble Heavy & Highway Americas Order Fulfillment FAQ.
IEEE MEDIA INDEPENDENT HANDOVER DCN: Title:Performance Measurements for Link Going Down Trigger Date Submitted:
The National Grid Service User Accounting System Katie Weeks Science and Technology Facilities Council.
Words + picturesPicturesWords Day Day
University of Southern California Center for Systems and Software Engineering Approaching the Design Stages Pongtip Aroonvatanaporn November 25, /25/20091.
1 Quality Center 10.0 NOTE: Uninstall the current version of QC before downloading QC All QC 10.0 documents can be located on the BI Shared Services.
A Transport Framework for Distributed Brokering Systems Shrideep Pallickara, Geoffrey Fox, John Yin, Gurhan Gunduz, Hongbin Liu, Ahmet Uyar, Mustafa Varank.
Event Management & ITIL V3
TOSCA Monitoring Working Group Status Roger Dev June 17, 2015.
Information Grid Services in the Polish Optical Internet PIONIER Cezary Mazurek, Maciej Stroiński, Jan Węglarz.
Simple Workflow Access Protocol (SWAP) Keith Swenson July 14, 1998.
A Generic Solution for Warehousing Business Process Data Malu Castellanos Joint work with Fabio Casati, Umesh Dayal, Norman Salazar Dayal, Norman Salazar.
COPYRIGHT © 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED. Application Monitoring in TOSCA Presenter: Ifat Afek, Alcatel-Lucent Jan 2015.
Jordan Howell Frank Geiger. Table of Contents  Question  Overview of example  Packets  OSI Model  Network Layer  Data Link Layer  Physical Layer.
Scaling Policy Concepts Metrics – Periodically gather usage information about a component e.g. queue length, response time, memory usage Alerts (Conditions)
TOSCA Monitoring Reference Architecture Straw-man Roger Dev CA Technologies March 18, 2015 PRELIMINARY.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks WMSMonitor: a tool to monitor gLite WMS/LB.
07/09/04 Johan Muskens ( TU/e Computer Science, System Architecture and Networking.
 Apache Airavata Architecture Overview Shameera Rathnayaka Graduate Assistant Science Gateways Group Indiana University 07/27/2015.
OSes: 3. OS Structs 1 Operating Systems v Objectives –summarise OSes from several perspectives Certificate Program in Software Development CSE-TC and CSIM,
TOSCA Monitoring Straw-man for Initial Minimal Monitoring Use Case Roger Dev CA Technologies Revision 3 May 21, 2015.
**DRAFT** Blueprints Alignment (OpenStack Ceilometer) 4 March 2015 Ryota Mibu, NEC.
21-07-xxxx IEEE MEDIA INDEPENDENT HANDOVER DCN: xxxx Title: Subscription ID Scope Date Submitted: June, 14 th, 2007 Presented.
Tbox is a monitoring solution for all your computer systems Unifies and simplifies management of system surveillance Notifies you in the event of.
1 ALCATEL-LUCENT — PROPRIETARY AND CONFIDENTIAL COPYRIGHT © 2015 ALCATEL-LUCENT. ALL RIGHTS RESERVED. NFV transforms the way service providers architect.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Using GStat 2.0 for Information Validation.
Ceilometer + Gnocchi + Aodh Architecture
ASSL1 Modeling the Image- Processing Behavior of the NASA Voyager Mission with ASSL September 12, 2013 by Emil Vassev and Mike Hinchey 2013 NASA Annual.
Omniran CF00 1 Key Concepts of Fault Diagnostics and Maintenance Date: [ ] Authors: NameAffiliationPhone Hao WangFujitsu R&D
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF Agile Infrastructure Monitoring HEPiX Spring th April.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF Alarming with GNI VOC WG meeting 12 th September.
Collaboration diagrams. Deployment diagrams. Lesson 4.
TOSCA Monitoring Straw-man for Initial Minimal Monitoring Use Case Roger Dev CA Technologies Revision 2 May 1, 2015.
IHP Im Technologiepark Frankfurt (Oder) Germany IHP Im Technologiepark Frankfurt (Oder) Germany ©
G. Russo, D. Del Prete, S. Pardi Kick Off Meeting - Isola d'Elba, 2011 May 29th–June 01th A proposal for distributed computing monitoring for SuperB G.
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES Author etc Alarm framework requirements Andrea Sciabà Tony Wildish.
CERN - IT Department CH-1211 Genève 23 Switzerland t ASM and Oracle Service Availability Monitoring LCG 3D Workshop CERN, January 26 th,
Enabling Grids for E-sciencE Agreement-based Workload and Resource Management Tiziana Ferrari, Elisabetta Ronchieri Mar 30-31, 2006.
Agreement-based Grid Service Management (OGSI-Agreement) Editors: K. Czajkowski (USC/ISI), A. Dan, J Rofrano (IBM), S. Tuecke, ANL M. Xu (Platform) Asit.
AS Numbers - Again Geoff Huston APNIC October 2009
INSTANCE MODEL AD HOC GROUP UPDATES Alessandro Rossini Sivan Barzily March 2016.
EXAMPLE FORMULA DEFINITION 1.
SDN-O LCM for Mercury Release Key Points and Overview
Master Service Orchestrator (MSO)
Network instantiation
Dell Customer Support Service Dell Customer Support Service REACH AT Dell Support : Give a Ring on:
Starting Design: Logical Architecture and UML Package Diagrams
TOSCA Orchestration Paradigm
Presentation transcript:

COPYRIGHT © 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED. Monitoring in TOSCA – Future Use Cases Presenter: Ifat Afek, Alcatel-Lucent September 2015

2 COPYRIGHT © 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED. Monitoring Ad-Hoc Group Status First Minimal Use Case The group has reached a rough consensus about a first minimal use case for monitoring in TOSCA. See open.org/apps/org/workgroup/tosca/download.php/56276/Monitoring%20Presentati on%20To%20TC%20--% pptxhttps:// open.org/apps/org/workgroup/tosca/download.php/56276/Monitoring%20Presentati on%20To%20TC%20--% pptx The following areas should be further discussed Complex Metric Types Communication between the orchestrator and the monitoring tool Policies Error handling

3 COPYRIGHT © 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED. Complex Metric Types Current Definitions Normative Metric Types Concrete metrics (CPU/Memory/etc.) and abstract metrics (Availability) Metric definitions on node types Future Definitions Composite Metric Types: ­ Formulas, e.g.: (Space Free / Space Available * 100) ­ Aggregations, e.g.: average Space Free per hour Custom metric types, defined per application Metric Definitions on instances, e.g. different metrics for different Compute instances

4 COPYRIGHT © 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED. Orchestrator and Monitoring Tool Communication Current Definitions None, this issue is not referenced in the first minimal use case Is it part of the group’s charter? Future Definitions Initialization of the communication between the orchestrator and the monitoring tool How does the monitoring tool access the components? Protocol/credentials… Orchestrator notifies the monitoring tool about component creation/deletion/modification/errors Monitoring tool notifies the orchestrator about errors in metrics retrieval

5 COPYRIGHT © 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED. Policies Current Definitions Monitoring policy ­ Required in order to enable monitoring ­ Define what to monitor: only some of the components/metrics ­ Monitoring disposition: required/best effort/none Policies are WIP in TOSCA

6 COPYRIGHT © 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED. Policies Future Definitions Actions on threshold/state change: ­ Notification ­ Auto-scaling ­ Examples: ­ if cpu_utilization > 70% send notification ­ if (cpu_utilization > 80% and num_instances < 3) then scale-out Motivation ­ Policies are defined as a layer on top of the application definition ­ If you deploy applications, you need to monitor them and decide what to do in case there are problems ­ Policies may define abstract actions like “notification”, and each orchestrator may implement it differently (send , write to log, etc.)

7 COPYRIGHT © 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED. Error Handling Current Definitions None Future Definitions The monitoring tool notifies the orchestrator about errors in metrics retrieval Actions if a required metric is missing for a specific component