Abstract Due to a change in demand, high voltage transmission circuits can become overloaded. Overloads are resolved by the dispatch of power based on.

Slides:



Advertisements
Similar presentations
Companies can suffer numerous problems due to poor management of resources and careless decisions. In real-world decision- making, many organizations lack.
Advertisements

Problem Statement Key Project Requirements Input Page Schedule & Resources Output Page System Testing Conclusion The general problem lies with residents.
Abstract A pacemaker helps to control one of the most critical organs of the human body, the heart. Due to the level of importance of the pacemaker’s correct.
Energy Saving Climate Control System (ESCCS) Team: Sean Jacobs, Brad Nissenbaum, Colin Tracy Advisor: Professor Anderson.
Academic Advisor: Prof. Ronen Brafman Team Members: Ran Isenberg Mirit Markovich Noa Aharon Alon Furman.
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
PROPOSED APPROACH A clear, aesthetically pleasing casing shall be used. Two digital displays: standard and binary. Components shall be fixed onto a printed.
Least Cost System Operation: Economic Dispatch 1
Figure 1 Personal Efforts Estimated Resources Financial Budget and Other Resources Table 1 Project Requirements Design Objective Concise, non-intimidating,
Optimization of the Microelectronics Fabrication Lab Process Abstract The laboratory component of the microelectronics fabrication class is an important.
EE 491 Project Presentation May07-04 – PDA Based UAS Remote Video Terminal Team Members: Devin Carney Jonathan Farmer Matt Henkes Rene Rios Faculty Advisor:
Chapter 5 Engineering Tools for Electrical and Computer Engineers.
May Team Information Client Department of Electrical and Computer Engineering, Iowa State University Faculty Advisor Professor Gary Tuttle Team Members.
 Fiber optic network in ring topology  Custom software implementing a Time Division Multiplexing (TDM) scheme  Documentation summarizing conclusions.
Project: May Project Team Members: Edward McDowell, EE Richard Mott, EE / Econ Faculty Advisors: Dr. John.
Job Offer/Continuing Education Evaluation Labor CostsHoursRate($10.30/Hr) Luke195 $ 2, Stephanie175 $ 1, Matt185 $ 1, Randy205 $ 2,
Abstract Other Resources Financial Resources Project Schedule Personnel Efforts Item DescriptionCost STK300 Microcontrollerdonated (Kanda) GM28 Cellular.
ISU Alumni Association Online Store Abstract The Iowa State University Alumni Association desires a complete overhaul of their online store. The current.
Pump Controller Team Number: May06-12 Team Members Dwayne Stammer CprE Francois Munyakazi EE Dan Paulsen CprE/EE Faculity Advisor Nicola Elia Client Viking.
General Background Senior design project May03-16, Fuel Cell Project, involves providing our client, MidAmerican Energy, a report containing a detailed.
Project Ongo-08a Information Software is required that would Provide mathematical problems that will improve student’s problem solving skills Provide teachers.
Abstract Evidence can be the key to convicting someone of a crime, or acquitting a person of charges brought against them. To make sure the evidence is.
Wind Turbine Design and Implementation Phase III Senior Design May Team Andrew Nigro (EE) Chad Hand (EE) Luke Rupiper (EE) Ryan Semler (EE) Shonda.
Problem Statement Automotive and heavy equipment applications use sensors on machines to report temperatures, pressures, speeds, etc. to a central embedded.
Macintosh Print Controller Team SDMay03-08Advisor Dr. James Davis Abstract The Macintosh Print Controller project attempts to solve a process productivity.
Problem Statement Expanding the capabilities of an auto repair paint drying system that uses newly developed ultraviolet (UV) light activated paint. This.
Design Objectives The design should fulfill the functional requirements listed below Functional Requirements Hardware design – able to calculate transforms.
Attack Tool Repository and Player for ISEAGE May06-11 Abstract Today’s world is changing shape as it increases its dependency on computer technology. As.
When buying a product in today’s marketplace, an individual is faced with the challenge of remembering an abundance of information about the product that.
Project Web Site: Client: Jim Walker Advisor: Professor Ajjarapu Abstract.
Expert System Job Offer Evaluation Software May Abstract The project’s focus is to decide what criteria should be used to determine which job offer.
A growing problem with university classrooms is the inability to effectively and efficiently record classroom attendance. The solution to this problem.
IntroductionResources Requirements Approach and Considerations Summary Abstract E agle Bluff is an environmental learning center, which has the goal to.
Preservation of human life is of the utmost importance. Whatever can be done to further this cause should be effectively implemented. It is the goal of.
Abstract Evidence can be the key to convicting someone of a crime, or acquitting a person of charges brought against them. To make sure evidence is carefully.
Abstract Introduction End Product & Deliverables Resources Project Requirements Team Members: Faculty Advisors: Client: Team Members: Faculty Advisors:
© Property of ERCOT /17/20041 RTCA, CAM, and SFT Presented by: John Adams November 17, 2004.
Greater Des Moines Energy Center Combined Cycle Plant Diagram of a Combined Cycle Generator Abstract Combined-cycle generating units are being incorporated.
Abstract The goal of our project is the continued restoration of the 8.5 meter dish at the Fick observatory in Boone, IA. Before restoration began, the.
Abstract Inexpensive ultrasonic tape measures are available that can only measure perpendicular distances to fairly large, flat surfaces. Complex environments.
D R A T D R A T ABSTRACT Every semester each department at Iowa State University has to assign its faculty members and teaching assistants (TAs) to the.
Introduction ProjectRequirements Project Requirements In a previous senior design project, a wireless front-end was added to Iowa State University’s Teradyne.
Abstract Reiman Gardens is looking to provide more educational material on their website. They are seeking a web program that provides an enjoyable experience.
1 The Requirements Problem Chapter 1. 2 Standish Group Research Research paper at:  php (1994)
OSCAR Octagonal Speech Controlled Autonomous Robot ME Seth Alberty Henry Venes EE Matt FrerichsHuy Nguyen Daniel HumkeDavid Staab Daniel MarquisFahad Wajid.
Alternative Energy Evaluation May06-16 Team Members: Steve ChebuharEE Anhtuan DinhEE Ryan FerneauCprE Justin JorgensenEE Client : Professor Ralph Patterson.
Estimated Resources Closing Summary Other Resources Financial Resources Project Schedule Computer Engineers William Hoang Gavin Ripley David Hawley Justin.
HardSSH Cryptographic Hardware Key Team May07-20: Steven Schulteis (Cpr E) Joseph Sloan (EE, Cpr E, Com S) Michael Ekstrand (Cpr E) Taylor Schreck (Cpr.
An essential part of any business is being able to track inventory and sales. In order for a business to be successful, the inventory control system must.
CMSC 2021 Software Development. CMSC 2022 Software Development Life Cycle Five phases: –Analysis –Design –Implementation –Testing –Maintenance.
Development Processes Chapter Study Questions Q1: How are business processes, IS, and applications developed? Q2: How do organizations use business.
OSCAR Octagonal Speech Controlled Autonomous Robot Team Ongo01 Motion Control & End Effector Frerichs, Matt – EE Moudin, Alex – ME Shedek, Tom – ME Wajid,
Problem Statement The goal of this project is to complete the basic automated functions of the Dream Green putting surface. The objective is to produce.
Abstract Parking your vehicle in the garage is a task that most of us take for granted. We head home from work or school, raise the garage door and drive.
ELVIS Educational Laboratory Virtual Instrumentation Suite: Phase II Abstract Problem Statement The goal of this project is to convert the EE 201 labs.
In today’s world of ever-increasing energy prices and environmental concerns, alternative energy sources are constantly being researched. This project.
LIGHTNING PROTECTION OF TRANSMISSION AND DISTRIBUTION LINES Team Members Eric Nelson, EE – Project LeaderDavid Dieterich, EE Tim Conrad, EE – Com. CoordinatorSam.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Abstract It is the goal of this project to create a traffic sign that will stand out amongst all of the other distractions that drivers face. The manner.
Project Management PTM721S
Microcontroller Enhancement Design Project
Economic Dispatch of Combined-Cycle Units
Software Support Framework
Systems Analysis and Design
Integration of Combined-Cycle Units into Economic Dispatch Computation
Staff Scheduling at USPS Mail Processing & Distribution Centers
Garage Parking Indicator
Engineering Tools for Electrical and Computer Engineers
Automated Printed Circuit Board Development
Integration of Combined Cycle Units into Economic Dispatch Computation
Presentation transcript:

Abstract Due to a change in demand, high voltage transmission circuits can become overloaded. Overloads are resolved by the dispatch of power based on hand calculations performed by a reliability coordinator. The project team will develop a software application that receives data from a power network and recommends a change for the network to control overloads in an economically minded manner. Optimal results will allow for power to be dispatched at the lowest cost to the client while protecting the network from overloaded transmission lines. Tien Huynh EE Zakaria Joundi EE Bryan Pauls EE Mark Scheibe EE Matt Mitchell Project Schedule Gantt Chart Personnel Efforts Financial Requirements Introduction Resources and Schedule Resources and Schedule The project team will develop a software application that provides the most economic dispatch of power to correct for overloaded high voltage transmission circuits. A program will be written that utilizes Microsoft Excel as its interface and will output which generating units to increase or decrease power output from. MidAmerican Energy will benefit from this project by receiving the least expensive combination of generator output power modifications in order to maintain system reliability. Closing Summary Team Members Client Professor Jim McCalley Faculty Advisor Webpage Project Requirements Project Requirements Design Objectives Must output the most economical dispatch solution by supplying which generators should increase or decrease their power output and the cost of the change Must obtain the solution within five minutes of the detected overload Functional Requirements The solution must be the most economical solution available based on economic dispatch analysis using linear programming The program must supply the solution within five minutes of the detected overload, consisting of data acquisition, algorithm computations, and display of the final dispatch solution The program must allow for manual input of the generation shift factors in matrix form Design Constraints The program solves for a 20,000 bus/50 generator system Need 100% accuracy for generator redispatch assignments There is a 5% tolerance for the amount of power increased and decreased during redispatch The software shall utilize Microsoft Excel as the interface Measurable Milestones Understand the problem as defined to the team by MidAmerican Energy Design the algorithm upon which the program will be based Implement the algorithm developed and test it based on a small scale system model Test the algorithm on the full scale system as given to the team by MidAmerican Energy Give the end-product to the client for use Dec05-03 Problem Statement General Problem Statement The MidAmerican reliability coordinator currently adjusts generator levels to fix overloaded transmission circuits and does not look at the economic impact of these shifts in generation. General Problem Solution Create a program to identify the most economically attractive shift in generation that will relieve the overloaded circuits. Operating Environment Inside a climate controlled working environment at MidAmerican EnergyUser MidAmerican Energy reliability coordinatorUses Determine most economical redispatch of generation to correct the overloaded transmission circuits Help economically dispatch generators during non-overload situationsAssumptions MidAmerican will supply previous network data to help design and test the algorithm Network data shall include the eastern interconnection of 20,000 buses Incremental heat rate curves shall be piece-wise linearLimitations Software shall use Microsoft Excel as the interface MidAmerican generators shall only be considered when shifting generation Power transfer distribution factors (PTDF’s) can be manually inputted into the program in matrix form Expected End-Product The end-product shall function within Microsoft Excel Documentation shall accompany the end-product to provide an explanation of how to use and maintain the software PowerPoint presentation to demonstrate how to properly enter data and run the end- product Frequently asked questions and a troubleshooting guide will also accompany the end- product ItemW/O LaborWith Labor Bound project plan $ Poster $ Labor at $10 per hour: Huynh, Tien$1, Joundi, Zakaria$1, Pauls, Bryan$1, Scheibe, Mark$1, Total $ 85.00$ 7, Proposed Approach Proposed Approach Proposed Approach Research optimization and economic dispatch Create algorithm to compute the chosen method of optimization Test algorithm Technologies Considered Visual Basic Application programming language for software application Microsoft Excel (required by the client) MatLab for mathematical modeling Testing Considerations Unit testing – test each fundamental block of the algorithm Integration testing – units will be tested as they are integrated together System tests – show the overall functionality of system and conformity to the client’s specifications Client test – on-site testing of the program by the customer Corrective Actions for Relieving Overloads in a Transmission System Manually load user inputsRun algorithm Output solution Input power transfer distribution factors Block diagram of proposed program References: Pictures from midamericanenergy.com and energyquest.ca.gov Other Resources None required