NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 1 NuMI Target Status, Testing, Support Module At NBI’02: Beam test results of Medium.

Slides:



Advertisements
Similar presentations
Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
Advertisements

NuMI High-power Targetry fpr Future Accelerators Workshop September 8-12, 2003 NuMI Target: Today and Tomorrow Jim Hylen, Nikolai Mokhov / FNAL Page 1.
2 nd Oxford-Princeton High Power Target Workshop Nov. 6-7, 2008 Extrap. 0.3 Mw targ. to 2Mw Jim Hylen / FNAL Page 1 Extrapolating NuMI 0.3 MW targeting.
 NT-01: Developed internal water leak after a few weeks of operation (may have been related to a beam incident). Managed internal water leak using helium.
Neutrinos from Stored Muons STORM Target Station Conceptual Design 15-April-2013 Kris Anderson Fermilab/Accelerator Division/Mechanical Support Department.
The Current T2K Beam Window Design and Upgrade Potential Oxford-Princeton Targetry Workshop Princeton, Nov 2008 Matt Rooney.
NO A Target Part I: Status Part II: Alternative Target Material Mike Martens NOvA Collaboration Meeting January 21, 2011.
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities I.Target Hall We expect to move NT-05 to.
Special Report NuMI Target Updates Special Report NuMI Target Updates Status Update I.Target Hall Target module ready to accept new target General target.
NUMI NuMI Hot Handling Jim Hylen (FNAL) NBI02 March 13, 2002 Page 1 NuMI Target Hall Radioactive Component Handling NuMI Target Hall Utilizes Three Basic.
LBNE Target Hall Instrumentation Bob Zwaska January 27, 2010.
The JPARC Neutrino Target
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
NBI March 2002 The MiniBooNE Horn Ioanis Kourbanis For The MiniBooNE Collaboration.
S.Kopp: NuFact ’02, Imperial College, London 1 The NuMI Neutrino Beam I. Status of 0.4MW Beam II. Potential for 1.6MW II. What’s it Good For? Sacha E.
NuMI NBI2006 September 6, 2006 NuMI Horns Experience Jim Hylen / FNAL Page 1 NuMI Horns Experience Horns were put in target hall June st run with.
JHF2K neutrino beam line A. K. Ichikawa KEK 2002/7/2 Overview Primary Proton beamline Target Decay Volume Strategy to change peak energy.
NuMI Horn Construction and Testing
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
NuMI Run II meeting Nov. 4, 2004 NuMI Target Hall Jim Hylen Page 1 NuMI Target Hall Status / Plan 8 slide introduction to target hall 9 slide list of status.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
LAGUNA/LBNO WP4: secondary beam line status report M. Calviani, P. Velten, A. Ferrari, I. Efthymiopoulos, C. Lazaridis (CERN) + M. Zito, V. Galymov (CEA),
Ff f f f “Conventional” neutrino beams: Target requirements Phil Adamson 13 th January 2012.
NuMI Target Hall Performance/Plans Jim Hylen DOE Tevatron Operations Review March 27, 2007.
Debbie Harris Sacha Kopp, Commissioning Workshop 1    Beam Monitoring Hadmon will see remnant protons Muon Monitors see whatever escapes beam.
NuMI NBI2006 September 6, 2006 NuMI Target Experience Jim Hylen / FNAL Page 1 Experience with the NuMI Target Max. Proton/spill Max. Beam Power Integrated.
NuMI 2 nd High Power Targetry Workshop October 2005 NuMI Target Status and Future Pat Hurh Page 1 NuMI Target Status and Design Study for Proton Driver.
Q&A on T2K construction of beam line near detectors budget collaboration (contribution from each) T2KK.
November 18, 2002Richard Talaga1 Target Hall Instrumentation NuMI Neutrino Beam Devices Instrumentation Review Instrumentation &Communication Overview.
Comissioning the NuMI Beam at Fermilab with Ion Chamber Arrays D. Indurthy, R. Keisler, S. Kopp, S. Mendoza, M. Proga, Z. Pavlovich, R. Zwaska Department.
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
NuMI NBI03 November 7-11, 2003 FNAL thin beam windows Jim Hylen / FNAL Page 1 FNAL experience with thin beam windows Issue is: Survival of window in high.
Current Status and Possible Items around ‘neutrino beam’ Horn Target Remote maintenance tools Decay volume window and collimator muon monitor Many items.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
120 GeV Targeting Neutrino beams utilizing 120 GeV protons from Project X Main Injector Jim Hylen Fermilab AAC meeting August 8, 2007 With thanks to Patrick.
NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
UKNF 12 January 2005 Target Studies J R J Bennett RAL.
MARS15 RESULTS FOR THE LBNE-BLIP IRRADIATION TEST LBNE-BLIP Irradiation Test Meeting Fermilab February 19, 2010 Nikolai Mokhov FermilabAccelerator Physics.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
J-PARC neutrino experiment Target Specification Graphite or Carbon-Carbon composite cylindrical bar : length 900mm, diameter 25~30mm The bar may be divided.
NuMI Horn Alignment Cross-hair System NuMI Horn Alignment Cross-hairs Target Hall Instrumentation Review November 18, 2002 David Ayres Argonne National.
GRAN SASSO’S HADRON STOP Temperature’s behaviour under specified beam conditions Barbara Calcagno.
NUMI Flexible Joint/Floating Clamp WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 10, 2001.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
The Lead Glass Detector Overview, Experience and Direction.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
NuMI Hadron and Muon Monitoring Robert Zwaska University of Texas at Austin NBI 2003 November 10, 2003 Fermilab UTexas -- AustinUWisconsin.
Target Proposal Feb. 15, 2000 S. Childress Target Proposal Considerations: –For low z target, much less power is deposited in the target for the same pion.
MARS15 Studies of Impact of LBNF Target/Horn Optimization on the Hadron Absorber 6 th High Power Targetry Workshop Merton College, Oxford April 12, 2016.
High Power Target Experience with T2K Chris Densham T2K Beamline Collaboration including RAL / KEK / Kyoto.
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
120 GeV Targeting Overview Neutrino beams utilizing 120 GeV protons from Project X Main Injector Jim Hylen Accelerator Physics and Technology Workshop.
Beamline for the LBNE Project Heidi Schellman for the LBNE collaboration.
1.2 MW LBNE Horns Cory F. Crowley Fermi National Accelerator Lab September 25, th International Workshop on Neutrino Beams and Instrumentation Cory.
LBNE 2.4MW Absorber NBI 2014 Presented by Brian Hartsell Contributions by: Kris Anderson, Yury Eidelman, Jim Hylen, Nikolai Mokhov, Igor Rakhno, Salman.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
Bob Zwaska IHEP - LBNF Beamline Meeting: Hadron Monitor 27 June 2016 NuMI Hadron Monitor.
News and brief overview of Beamline plans for the next few months
IHEP group Shashlyk activity towards TDR
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
Conventional Neutrino Beams Day 2
Beam Tests of Ionization Chambers for the NuMI Neutrino Beam Monitoring System MINOS.
Presentation transcript:

NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 1 NuMI Target Status, Testing, Support Module At NBI’02: Beam test results of Medium Energy style target (graphite fin clamped by aluminum cooling plates) Design shown of Low Energy target (graphite soldered to Stainless water pipes) At NBI’03: Low Energy target construction complete Vibration testing of target in progress Design complete of target carrier (assembly begun) which allows remotely changing neutrino beam energy Outlook: Install target in target hall – June 2004 Measure hadron production using (spare) target in MIPP/E907 experiment - Fall 2004 Commission NuMI with beam – December 2004

NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 2 NuMI target collaboration IHEP Protvino design team V.Garkusha, V.Zarucheisky F.Novoskoltsev, S.Filippov, A.Ryabov, P.Galkin, V.Gres, V.Gurov, V.Lapygin, A.Shalunov, A.Abramov, N.Galyaev, A.Kharlamov, E.Lomakin, V.Zapolsky FNAL design team J.Hylen, K.Anderson FNAL beam test J.Morgan, J.Hylen, H.Le, A. Kulik, P. Lucas, G. Koizumi ANL vibration test R.Wagner Energy deposition calculations done with MARS Target construction done at IHEP

NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 3 NuMI target types (Low Energy refers to neutrino spectrum, not beam power) Low Energy Target must fit in horn this is what we have built Medium Energy Target easier, more robust Graphite (POCO ZXF-5Q) is target material

NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 4 Different spectra obtained by changing target and moving 2 nd horn L.E. gives MINOS best match to current SuperK  m 2

NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 5 Reasonable High Energy beam can be produced by just moving LE target “Semi-beams” Full Beams Just moving LE target New target, move horn 2

NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 6  spectra moving off-axis Future off-axis experiment in Minnesota? Off-axis experiment probably prefers M.E. configuration 2 GeV beam off-axis L.E. M.E.

NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 7 Low Energy Target Construction Graphite Fin Core 2 int. len. Water cooling tube also provides mechanical support Aluminum vacuum tube

NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 8 Target – Internal Monitoring Narrow – location checked by scanning beam across edge. Sense by: (i) charge (delta-rays) knocked out (wire connected to target) (called Budal) (ii) scattered beam into cross hairs ionization chamber (BLM) Casing of target fin electrically insulated from base. Wire strung from case to top of module. When moving, can sense if case touches horn by short to “ground”.

NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 9 Will use Helium instead of vacuum for high beam power running Aluminum vacuum tube is insulated from water cooling to allow Budal monitor to work. At design beam power, conduction from tube through helium to water pipe is important. (downstream end still reaches 190 deg C). Can still use vacuum for low power beam alignment scans

NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 10 NuMI target vibration testing Target tip vibration induced by: Pulsing horn < 0.01 mm (Target does not touch horn 2.5 mm clearance) Air flow similar to target hall ~ 0.06 mm Air flow with target out of horn ~ 0.5 mm (need to redo with outer tube in place) Water flow (not measured yet) Target in L.E. location in horn

NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 11 Target Temperature (Calculation) - lots of headroom NuMI beam design parameters: 0.4 MW beam power 120 GeV/c proton beam 4x10 13 protons per 8.6  sec beam spill 1.87 sec repetition rate 1 mm RMS circular beam spot size

NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 12 Target dynamic stress calculation Safety factor of 3.8 at fin center Safety factor of 2.2 at curved edge of fin Note fin is in 2 cm segments to prevent stress buildup

NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 13 Radiation Damage is still the big uncertainty Most radiation damage info is from reactor neutrons In this example, graphite self- destructs at ~ 2x10 20 n/mm 2 Highest radiation density in NuMI target is proton spot near entrance ~ 0.5x10 20 p/mm 2 / year NuMI target test accumulated 0.023x10 20 p/mm 2 with no visible damage Target longevity uncertain – will gain experience in 2005 Radiation Damage and Life-time Evaluation of RBMK Graphite Stack, XA , P.A.Platonov, O.K.Chugunov, V.N.Manevsky, V.I.Karpukhin, Russian Research Center Kurchatov Institute

NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 14 Baffle Protects beamline elements (e.g. target water lines) from mis-steered proton beam that could do damage in a single pulse Graphite encapsulated in aluminum tube 150 cm long, 6 cm diamter 11 mm diameter hole for beam Air-cooling boosted by pin radiators Scraping of a few percent of beam here would affect neutrino spectrum Detect scraping by temperature rise

NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 15 Target station in pictures (10% of ) Shielding Blocks 1 of 3 Support modules 1 of 2 focusing horns Target with motion system

NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 16 Target and Horn hang from support/shielding modules Water tank Baffle Target Target/Baffle Module Horn 1 Module Horn 1 Carrier

NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 17 Target / Baffle can be remotely moved 2.5 m along beam direction, 20 cm vertically, +/- 8mm horzontally Drive motors Baffle Target Shielding / Support Module T/B Carrier Vertical motion gets target out of way for beam scan of horn cross hairs

NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 18 Target/Baffle Carrier Target Water lines compress like spring Baffle Dirt on screw drive test – no problem Support shafts move whole carrier for transverse motion but motion along beam uses ball screw below module to push/pull cradle Rollers

NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 19 NuMI Target Summary At NBI’02: Beam test results of Medium Energy style target (graphite fin clamped by aluminum cooling plates) Design shown of Low Energy target (graphite soldered to Stainless water pipes) At NBI’03: Low Energy target construction complete Vibration testing of target in progress Design complete of target carrier (assembly begun) which allows remotely changing neutrino beam energy Outlook: Install target in target hall – June 2004 Measure hadron production using (spare) target in MIPP/E907 experiment - Fall 2004 Commission NuMI with beam – December 2004