Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Linepack ‘Park and Loan’ Quantity - Influencing Factors Review Group 291 – July 2010.
Exercise Opus Findings Gas Customer Forum 10 th March 2008.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Flow Variations at Entry Transmission Workstream Martin Watson 1 st November 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Gas Balancing Alert Transmission Workstream – Oct 2005 Ritchard Hewitt.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Information provision for winter 09/10 Jenny Phillips – GNCC Strategy & Support Manager.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
OPNs & LDZ Demand Forecasts Chris Shanley & Nick Reeves.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
2005/06 Safety Monitors Presentation to Gas Transmission Workstream, 5 January 2006.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Supply Point Register 7th December 2011
Review of System Alerts
Transmission Workgroup 7th July 2011
UNC Modifications 061 & 062 – An Overview
Review of System Alerts
Development of Firm Monitor & GBA
Enhanced information provision and revision of the Gas Balancing Alert for Winter 2009 July 2009.
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Options for the Development of a Demand Side Response Mechanism
Open Letter - Summary of Responses
Presentation transcript:

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Development of Firm Monitor & GBA Transmission Workgroup – 1 December 2011

2 Agenda  Firm Monitor  GBA

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Development of Firm Monitor Transmission Workgroup – 1 December 2011

4 Firm Monitor  National Grid has an UNC obligation to:  Calculate and publish Preliminary Firm monitor info in May  Calculate and publish “Final” Firm monitor info by October  The Firm Monitor represents the level of storage required to support all “firm” demand in a severe (1 in 50) winter It is published for information only

5 Why Change?  Gas Year 2011/12: all DN connected load classified as Firm  Subsequent increase in the level of storage space to meet firm load  Increase in space requirement from 32% in 2010/11 to 94% in 2011/12  Change discussed at the Gas Forum, DSWG, the Small Suppliers Forum, Transmission Workgroup and with specific Shippers

6 Options  Do nothing  Firm Monitor space requirement will rise above 100% sometime (2012/13?)  Will be breached each year  Change calculation methodology  What demand do we use?  Remove requirement  Not used by majority of industry  Storage information is published on the web

7 Proposed Option  Remove requirement to publish firm monitor (in UNC).  Requirement for safety monitor will remain Next Steps  Aim to have change in place for winter 2012/13  Raise modification in January 2012

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Development of GBA Transmission Workgroup – 1 December 2011

9 What Is a Gas Balancing Alert (GBA) A GBA has two triggers, day ahead (no discretion) or within day (discretion) Or Expectation on the market to respond by increasing supply or initiating a demand side reduction. National Grid have a UNC obligation (V 5.9) to alert system users to a EOD supply/demand imbalance via a Gas Balancing Alert (GBA)

10 D-1 and Within Day GBA specific issues within scope for review Issues to be addressed in respect of specific GBA type :  Day Ahead GBA;  rename to a day ahead notification;  aligning UNC with the calculation methodology undertaken by National Grid NTS during the GBA;  ability for National Grid NTS to recall a GBA notice.  Within Day GBA;  ability for NGG to signal a within day issue;  review trigger methodology;  ability for National Grid NTS to recall a GBA notice.

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Ability to Signal Within Day Issue Transmission Workgroup - 1 December 2011

12 Within Day Issue ? Safety Limit

13 Within-Day Linepack Variance

14 Yearly Profile Comparison

15 Within Day Warning Conclusions  Increasing volatility in within day linepack variation  Market is not incentivised to manage within day issues  National Grid are best placed to manage within day issues  Could inform the industry that NGG will be taking action to resolve within day issue

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. GBA Trigger Methodology Transmission Workgroup - 1 December 2011

17 The GBA trigger level is National Grids view of total system supply for the winter period Consists of NSS and Storage Day Ahead GBA Trigger Level 1. Non Storage Supplies (NSS) A view of likely NSS supplies are produced by National Grid in advance of the winter period and are published externally in the Winter Outlook document. NSS supplies are assessed monthly throughout the winter period as actual supply data is recorded. Any significant deviations away from the prevailing NSS assumption can reduce or increase the NSS value, leading to changes in the GBA trigger level. 2. Storage Supplies Any storage facility with two or more days deliverability, at assumed maximum rates, will be included in the GBA day ahead trigger level. Storage sites without GBA qualifying deliverability will not be included in the GBA trigger level, and the trigger level will be reduced by the maximum deliverability for those sites. We believe this process is both Transparent & Predictable.

18  Maintain current methodology  Initial trigger is an incident that will reduce supplies by 25mcm/d, leading to an EOD supply demand imbalance  Issuing of a GBA is at NGG discretion  Supply trigger only, no demand shock trigger  Does not take into consideration start of day position Within Day GBA Trigger Methodology - Options

19 Within Day GBA Revised Trigger Methodology – Options  Full NGG discretion  Pros  No restrictive trigger (25mcm loss of supply)  Additional information to the industry on ‘why’  Cons  Methodology for determining a GBA is opaque

20 Within Day GBA Revised Trigger Methodology – Options  Extend day ahead methodology to within day  Pros  No restrictive trigger (25mcm loss of supply)  Provides a more real-time view of supply  Common methodology across timescales  Cons  Difficulty in determining the level of supply

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Additional information provision Transmission Workgroup - 1 December 2011

22 Additional information provision  Publication of NSS breakdown with supporting notes when changed  Publication of projected EOD supply deficit  Additional information via ANS message

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Next Steps Transmission Workgroup - 1 December 2011

24 Day ahead & Within Day GBA Proposed changes :  Day Ahead GBA;  rename to a notification;  aligning UNC with the calculation methodology undertaken by National Grid NTS during the GBA;  ability for National Grid NTS to recall a GBA notice;  Publication of additional information.  Within Day GBA;  propose new trigger methodology;  ability for National Grid NTS to recall a GBA notice;  no within day name change proposed. Any industry concerns?

25 Day ahead & Within Day GBA  Raise modification in January 2012  Aim to implement any changes for winter 2012/13