1 Fermi Gamma-ray Space Telescope Users Group Meeting December, 2013 Mission Status Update J. McEnery.

Slides:



Advertisements
Similar presentations
LANDSAT Program Update Tim Newman Coordinator, USGS Land Remote Sensing Program National Geospatial Advisory Committee December 3, 2014.
Advertisements

Quality, Improvement & Effectiveness Unit
A New Directive, a New Opportunity: How a New Policy Expands Communication at the National Center for Health Statistics Presented by Megan Cox Public Affairs.
Highlights from monitoring candidate gamma-ray binary systems with Fermi/LAT Thomas Glanzman (SLAC) and Richard Dubois (SLAC) on behalf of the Fermi Large.
Cxc CHANDRA X-RAY OBSERVATORY Press Events 39 Press Events 3 Space Science Updates - Perseus Cluster: Chandra "Hears" a Black Hole - RXJ : Star Being.
Experiences From The Fermi Data Archive Dr. Thomas Stephens Wyle IS/Fermi Science Support Center.
GOES-R Ground Segment Project Update American Meteorological Society Annual Meeting Atlanta, Georgia January 20, 2010 Vanessa Griffin Project Manager,
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status June 6, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status October 29, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray.
CXC Manager’s Status Report Chandra User Committee Meeting Roger J. Brissenden 25 June 2002.
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 5, 2007 Ken Fouts.
GLAST LAT Project – Collaboration MeetingAugust, 2005 Science Group Reports 1 GLAST Large Area Telescope: Collaboration Meeting August 26, 2005 Pulsar,
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Section Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review 7.2.
GLAST LAT Project 1S. Ritz DC1 Closeout Introduction February 2004 Steven Ritz Gamma-ray Large Area Space Telescope.
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
1 Arecibo Synergy with GLAST (and other gamma-ray telescopes) Frontiers of Astronomy with the World’s Largest Radio Telescope 12 September 2007 Dave Thompson.
LSST Scheduler status Francisco Delgado Sr. Software Engineer Telescope & Site.
1 Fermi Users Group FSSC News and Operations Support Chris Shrader, Fermi Science support Center NASA/GSFC Fermi Users Group Meeting Goddard Space Flight.
Van Allen Probes Spacecraft Operations July 29, 2015 Kristin Fretz
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
1 Fermi Gamma-ray Space Telescope Users Group Meeting 16 August, 2013 Mission Status Update J. McEnery.
1 Fermi Gamma-ray Space Telescope Users Group Meeting 20 July, 2012 Mission Status Update J. McEnery.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Presentation on GLAST Data Policies to Users Working Group October 22, 2003 GSFC Jonathan F. Ormes – Project Scientist Donald A. Kniffen - Program Scientist.
1 The VLBA and Fermi Dave Thompson NASA GSFC Fermi Large Area Telescope Multiwavelength Coordinator Julie McEnery NASA GSFC Fermi Project Scientist VLBA.
The GLAST Science Support Center’s Role in Supporting the User Community [24.10] Thomas E. Stephens (GSFC/L-3GSI) for the GLAST Science Support Center.
Serving Data to the GLAST Users Community Thomas E. Stephens (GSFC/RSIS) for the GLAST Science Support Center Abstract.
GLAST Science Support CenterAugust 9, 2004 Users’ Committee Meeting GSSC USER SUPPORT David Band – GSSC.
Swift HUG April Swift data archive Lorella Angelini HEASARC.
GLAST LAT Project GLAST Users Committee Meeting, 6-7 June Update on LAT Science Tools S. W. Digel Stanford Linear Accelerator Center Gamma-ray Large.
The RAPTOR (RAPid Telescopes for Optical Response) telescopes and GeV/TeV gamma-ray astronomy vestrandAspen Meeting---Galactic GeV/TeV sources.
1 GLAST The Gamma-ray Large Area Space Telescope Status of the Mission F.Longo see
1 Fermi Gamma-ray Space Telescope Users Group Meeting 28 August 2009 Mission Status Update J. McEnery, E. Hays.
BEN Scholars Program Wrap Up Presentation by Yolanda S. George, AAAS.
Alternative Observation Strategy for the Fermi Mission - A Recommendation.
S. Ritz 1 GLAST Science Policy Document Outline Action Item GUC Meeting June 2005 R. Brissenden S. Ritz Gamma-ray Large Area Space Telescope.
GLAST Science Support Center June 21, 2007 Getting Involved with GLAST GLAST Guest Investigator Program David Band, GSSC CRESST/GSFC/UMBC.
Proposal: staged delivery of Scheduler and OpSim V1 (2016) meet most of the SRD requirements – Deliver a system that can be extended with an improved scheduler.
Swift as a Rapid Wide Field Follow-up Instrument John Nousek & Jamie Kennea Penn State University Phil Evans University of Leicester International Workshop.
GLAST LAT Project 1S. Ritz Data Challenge Planning Overview Purpose Boundary conditions Plan: –scope and progression of data challenges –schedule summary.
Fermi Users Group Meeting Goddard Space Flight Center, February 6, 2009C. Shrader, NASA/GSFC 1 Fermi Users Group FSSC News Chris Shrader, Fermi Science.
The Search for Black Holes
Jim Hinton MPI-R, Bonn Stefan Funk for H.E.S.S., XXXXth Rencontres de Moriond – 15th of march 2005, La Thuile First results from the H.E.S.S. Galactic.
GLAST Science Support Center November 17, 2006 GUC Face-to-Face Meeting GLAST GI Program (with revised schedule) David Band, GSSC.
1 Fermi Gamma-ray Space Telescope Users Group Meeting 6 February 2009 Mission Status Update (since the phonecall) and Issues S. Ritz, J. McEnery.
Mission Status - S. Ritz 1 GLAST The Gamma-ray Large Area Space Telescope Mission Status DC2 Kickoff 1 March 2006 S. Ritz Gamma-ray Large Area Space Telescope.
Fermi Science Support Center September 26, 2008 FUG Face-to-Face Meeting Fermi GI Program Update David Band, FSSC CRESST/GSFC/UMBC.
Eastside Elementary School Parental Involvement Policy and Plan for Shared Student Success School Year Eastside Elementary School Shelia Cain,
1 Getting Involved with GLAST Workshop, CFA, 06/21/ C. Shrader, NASA/GSFC GLAST Data & Software Release plans + Science Support Center Services C.
Fermi Users Group Meeting Goddard Space Flight Center, August 28, 2009C. Shrader, NASA/GSFC 1 Fermi Users Group FSSC News Chris Shrader, Fermi Science.
1 Fermi Gamma-ray Space Telescope Large Area Telescope Multiwavelength Notes (mostly LAT) Dave Thompson Fermi LAT Multiwavelength Coordinator.
June 27-29, DC2 Software Workshop - 1 Tom Stephens GSSC Database Programmer GSSC Data Servers for DC2.
The Search for Black Holes
Fermi Gamma-ray Space Telescope Searches for Dark Matter Signals Workshop for Science Writers Introduction S. Ritz UCSC Physics Dept. and SCIPP On behalf.
Monitoring GLAST Operations: Building tracking displays for the LAT Instrument Science Operations Center By Christina Ketchum.
David Harnett Energy Engineer Environment Directorate Milton Keynes Council.
ISIS Project Status Report May 18, 2006 Prepared by MAXIMUS, Inc Education Systems Division for the ABT Committee.
The Invisible Universe Prof. Lynn Cominsky Sonoma State University.
GLAST Science Support Center May 8, 2006 GUC Meeting AI#28. SAE Release Schedule David Band (GSSC/JCA-UMBC) Julie McEnery (GSFC)
ESAC_3_24_05.ppt Gamma-ray Large Area Space Telescope – exploring the high-energy universe.
Fermi Gamma-ray Burst Monitor
& Eric P. Smith HST/JWST Program Scientist Astrophysics Division NASA Headquarters.
GLAST LAT ISOCNotes for Italian meeting, 15 december Notes about ISOC and the italian contributions Gamma-ray Large Area Space Telescope.
The GLAST Science Support Center
The Fermi Mission Liz Hays (NASA GSFC) Fermi Symposium 2017.
Fermi & ASDC Elisabetta Cavazzuti on behalf ASDC Team Fermi Meeting
Proposal for LAT Year 1 Data Release Plan
Data Challenge 2: Aims and Status
GLAST Large Area Telescope Instrument Science Operations Center
Presentation transcript:

1 Fermi Gamma-ray Space Telescope Users Group Meeting December, 2013 Mission Status Update J. McEnery

2 Some goals for this meeting Comments and feedback from the users group on: –Observation strategy How to handle PSR B1259 and Eta Car periastron passages –GI program Possible addition of INTEGRAL to the GI program –Senior review (covered yesterday) Of course, comments on suggestions on any aspect of the mission are welcomed!

3 Status Highlights Observations: –Almost exclusively in nominal data taking in survey mode –Nadir observations (for TGF observations) –Four target of opportunity observations Crab Sun GRB A Nova Cen SSR fill issues in August –Temporarily throttled GBM data, reworking operations procedures to prevent this in future. Safehold trip on October 22 due to exceeding limit on total ang. mom. –A false alarm - no actual spacecraft problem. Adjusted limit setting to prevent this from happening again. OIG audit of operating missions INTEGRAL have approached us to explore possibility of joint program

4 Flight Operations Team and Sustaining Engineering activities Update flight dynamics software –Model sunpoint and spin survey modes, so that data contacts can be scheduled in these modes –Improve modeling of yaw steering and antennae null regions Model SSR fill rate predictions, page FOT if potential problem is identified Revamp operations agreement to reflect post-launch changes in operations (especially ToO, non-standard survey and pointed observations) Engineering studies of modified observing strategy

5 Galactic Center observing strategy A galactic center observation that is also an all-sky survey –Implemented by interleaving slices of inertial point and survey mode observations Retains all-sky coverage every two orbits (but less evenly than before) Started on Dec 5, but interrupted by TOO request for Nova Cen, restarted on Tuesday survey Option 4 Two orbits

6 A minor wrinkle PSR B1259 reaches periastron in April/May 2014 Eta Car reaches periastron in summer 2014 Both are in a region of the sky disfavored by the new strategy, but timing of cycle 7 GI program is too late to allow observing proposals for these events. Consider transition back to regular survey mode, or modified modes favoring those regions?

7 High Level Data Releases P7 Reprocessed data (including updated diffuse model) LAT GRB summary table – grbs/ Additional catalogs posted to FSSC site – 2 nd pulsar catalog, >10 GeV catalog In the works (within a month or two) –GBM localization contours for GRB

8 LAT GRB Table

9 Multiwavelength Analysis workshops LIGO-Fermi meeting, March 2013 –Hands on analysis workshop between LIGO/VIRGO/GEO and Fermi-LAT/Fermi-GBM –Tutorials on how to use each other’s data, share how each collaboration responds to alerts –Very successful - plan to do this again. Continuing to work on joint analysis projects Fermi/VERITAS/HAWC, Feb 2014 –Planned to be an analysis workshop – Goal to optimize how we work together Joint analysis techniques Share operations experience etc

10 Public Outreach iPad App development continues Press releases –GRB130427A (science release) –Fermi’s 5 year anniversary Upcoming press releases –Black widow feature –Grav. lensed blazar observations

11 Questions?

12 backup