E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 1 Status of Cryomodule-A for S1-Global at KEK Eiji Kako (KEK, Japan)

Slides:



Advertisements
Similar presentations
E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 1 Low Power RF Tests (3) in S1-G.
Advertisements

E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Operational Results from STF-VTS and Cryomodule Tests at KEK Eiji Kako (KEK, Japan)
KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
E. Kako (KEK) Webex Meeting in May 24th, Status and Disassembly Plan of S1-G Cryomodule.
Progress and Plan for Superconducting RF Cavity RF Group.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
Cost comparison of tuners H. Hayano, KEK AWLC14
Cavity Integration summary H. Hayano April 25, 2008 ILC-SCRF
1.3 GHz FNAL Dressed Cavity S-1 Global Deliverable to KEK 7 July 2009.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
1 Eiji Kako (KEK) in cooperation with Japanese Industries IPAC-2010 Satellite Workshop, Kyoto, May 23, A Satellite Workshop at IPAC Superconducting.
S1 Global Module Cavity String Assembly Workflow Tug Arkan January 15, 2010.
E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 1 Final Results of KEK Cavities for S1-Global Eiji Kako (KEK, Japan)
Status of cavity fabrication facility at KEK H. Hayano, KEK Cavity Industrialization Study at KEK Superconducting RF Cavity Technology and Industrialization.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
E. KAKO (KEK) 2011' May 15 S1-Global Test 1 Fact Test Schedule of S1-Global Cryomodule (June, 2010 – Feb. 2011)
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 1 Eiji Kako (KEK, Japan) Cavity Test Plan in S1-Global Cryomodule.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
28/Jul/ Test Results of the International S1-Global Cryomodule Kirk.
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
LCWS13 at Tokyo, 2013 Nov. 121Eiji Kako (KEK, Japan) Status of STF2 Input Couplers Eiji KAKO (KEK, Japan)
Refurbished Booster RF John Reid October 24, 2012.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 1 Cavity string assembly at KEK for S1-Global Eiji Kako (KEK, Japan)
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 1.
E.Kako (KEK) 2009.Dec. 26 1 S1-Global Cryomodule Overview No connection No beam tube No gate-valve Closed by Blind Flange Gate-valve Pumping system Pumping.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Definition of Work Area H. Hayano, KEK EDR-KOM-cavity at DESY Issues of Cavity and Cavity Package, Work Package discussion.
ALCPG11 1 Comparison of Tuner Performance in S1-G Cryomodule Rocco Paparella, on behalf of S1-Global team.
On S1Global Writeup S1G Writeup Meeting Nobu Toge 1.
E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 1 Summary of Low Power RF Tests in S1-G Cryomodule E. Kako, H. Hayano, S. Noguchi,
Check the component list with FNAL solid model Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Detail plan of S1-Global H. Hayano (KEK),
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
C.MADEC - TTC meeting E-XFEL cryomodule assembly : prototyping phase at Saclay.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
S1G Experiment Schedule Plan
ILC10 Beijing Global Design Effort
CW couplers; KEK injector couplers Eiji Kako (KEK, Japan)
Brad Schoenrock Advisors Dave Meidlinger Matthias Liepe
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
MLC Schedule Plan Proven in-house expertise and infrastructure for fabrication, assembly, and testing cryomodules Confident in our technical expertise.
S1-G cryomodule assembly status
Definition of work flow for string DESY Example on critical operation
S1-G Webex meeting Global Design Effort
Magnetic shields inside and outside LHe tank in S1-Global cryomodule assembly at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
KEK injector cryomodule
IHEP Cryomodule Status
Construction and First Coo-down Test of cERL Injector Cryomodule
Cryomodule Assembly Plan
TTC meeting, Milano Global Design Effort
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 1 Status of Cryomodule-A for S1-Global at KEK Eiji Kako (KEK, Japan)

E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 2 He Jacket Welding of 4 KEK cavities at MHI-Kobe 2010, Jan. 29 MHI-05 MHI-07 MHI-06 MHI-09

E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 3 Delivery of 4 MHI Cavities at KEK Four MHI cavities (MHI-05, 06, 07, 09) arrived at KEK in 16th, February. MHI-06 MHI-05 MHI-07 MHI-09

E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 4 Preparation of Cavity Support Posts Class-1000 Clean Room (19th, February)

E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 5 Cleaning of Cavities with Car Washer Entrance of Clean Room (23rd, February)

E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 6 Installation on Support Posts Class-1000 Clean Room (23rd, February) MHI-07 Cavity

E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 7 Preparation of Cavity String Assembly MHI-05 MHI-06 MHI-07 MHI-09 23rd, February 2010’ Class-1000 Clean Room

E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 8 Schedule: String Assembly of KEK Cavities Feb. 22 ~ ; class-1000 clean room Cleaning and setting of 4 KEK cavities Cleaning and disassembly of 4 input couplers Preparation of Gate-valve, Taper & 3 Bellows Mar. 01 ~ ; class-10 clean room String assembly of 4 KEK cavities Leak check, Ar gas slow leak up to 1 atm Mar. 08 ~ ; outside of clean room Slide-Jack tuner assembly, Align. of 4 cavities Mar. 15 ~ ; outside of clean room Tuner drive check, RF meas. (fo, Qext, stroke)