CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1.

Slides:



Advertisements
Similar presentations
Additional CREs to address Stability Limits Beth Garza TAC June 26, 2008.
Advertisements

Congestion Revenue Rights Activity Calendar Update Donald House CMWG September 19, 2014.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
1 Commercial Operations Sub-Committee Update to TAC October 5, 2007.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee August 7, 2008.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
April 28, 2008 Constraint Competitiveness Tests, an Overview Congestion Management Working Group.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett.
COMS Nodal Commercial Systems Project Update COPs Meeting May 2007 By Bill Barnes and Justin Rasberry.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
ROS Meeting – 05/15/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 05/15/08.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 3, 2010.
CRR Model Building Process Bradley Bell CRR Engineer.
ERCOT, Market Analysis 2013 Annual Constraint Competitiveness Test (CCT) Study Results – Update for 8/27/12 CMWG 8/27/2012 ERCOT Public.
September 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Competitive Constraints/ Protocols 3.19 Presented to CMWG 10/14/2011 Steve Reedy, Manager, CRR.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
Congestion Management Working Group WMS update 11/7/2012.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Enterprise Data Warehouse Section 8 – Performance Monitoring.
Texas Nodal Market Implementation Metric Sub Group Readiness Advisor January 30, 2006.
Impact Analysis and Feasibility Study Review – NPRR164, NPRR169 and SCR752 Troy Anderson ERCOT Program Management Office January 15, 2009.
CMWG Update to WMS Report of CMWG Meetings of &
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
January 29, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott February 3, 2015 TAC Update to RMS 1.
Protocol Revision Subcommittee Tom Burke September 7, 2012.
Technical Advisory Committee (TAC) update to RMS Kathy Scott January 3, 2013Technical Advisory Committee 1.
October 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott October 16, 2013TAC Update to RMS 1.
Congestion Revenue Rights Activity Calendar Update Donald House CMWG October 23, 2015.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
ERCOT Guideline for Interim Updates to the Network Operations Model Excerpted from the “Modeling Expectations” whitepaper D.W. Rickerson.
Congestion Management Work Group Update WMS I Flores, S Reedy—ERCOT M Wagner--PSEG TX.
Harika Basaran 11/05/2014 TAC October 23, 2014 Meeting Update to Commercial Operations Subcommittee.
Model load frequency Discussion John Adams January 5, 2010 Nodal Advisory Task Force.
Technical Advisory Committee Presentation to the ERCOT Board of Directors September 16, 2008.
CMWG Update to WMS Report of CMWG Meeting of M. Wagner Edison Mission Marketing & Trading Thanks to ERCOT Staff for Graphics See ERCOT.
Constraints Competitiveness Tests (CCT) Results Analysis of 2010 SSWG Peak Summer Case Presented to CMWG 1/27/2010.
August 2012 Wholesale Market Operations Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach Market Support and Analysis.
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
1 TAC Report to the ERCOT Board November 14, 2006.
CMWG Update to WMS M Wagner Edison Mission Marketing & Trading.
1 Nodal Day Ahead Invoice Taskforce Update COPS, May 8, 2007.
Discussion on FGR Settlement Protocol Language David Maggio CMWG February 17, 2014.
1 Market Trials Open Market Participant Call Weekly Kick Off Aug 09, 2010.
CMWG Update to WMS Report of CMWG Meeting of
Retail Workshop ERCOT Nodal Update October 06, 2010.
11/3/2011 Technical Advisory Committee TAC Update Kyle Patrick.
Kenan Ögelman & Randa Stephenson TAC Leadership Retreat TAC Meeting September 5, 2013.
Network Operations Model Go-Live Decision Kenneth Ragsdale TAC July 1, 2010.
Texas Nodal Market Implementation Transition Planning Task Force Metric Framework Review Readiness Advisor January 24, 2006.
Technical Advisory Committee Presentation to the ERCOT Board of Directors July 15, 2008.
February 25, 2016 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 1, 2016 TAC Update to RMS 1.
PLWG Report to RPG January 21, 2014 Presented by John Moore, PLWG Chair.
CMWG Update to WMS Met 4/24 & 5/11 Continued Work on PRR 801 –Discussed outages as related to TCR Cases –ERCOT evaluates various outage combinations.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
1 Market Trials Update NATF January 5, 2010.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Texas Congestion Management Work Group Update For WMS Marguerite Wagner, PSEG Texas.
TAC Update Kyle Patrick. 2 Nodal ERCOT Program Update –Nodal Market Go-Live (Vote)- vote passed in which TAC certified full nodal systems for Dec 1, 2010.
Protocol Revision Subcommittee
Initial ERCOT Parking Deck Prioritization Recommendation
2011 Prioritization Update to Market Subcommittees
Initial ERCOT Parking Deck Prioritization Recommendation
September Protocol Transition Plan
Presentation transcript:

CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1

CCT Status Current Plan Issues Going Forward 2

Current Plan Use 2010 CSC/CRE Combinations as Competitive Constraints for last 15 days of January and going forward. –3.19(1) “Unless the Board approves changes, the “Competitive Constraints” are the contingency/limiting Transmission Element pairs that represent the Commercially Significant Constraints (CSCs) and Closely Related Elements (CREs), as those terms were defined in the ERCOT Protocols, immediately prior to Texas Nodal Market Implementation Date.” –3.19(2) “An appropriate subcommittee approved by TAC (“TAC Subcommittee”) may develop an alternative list through the analysis described below for determining Competitive Constraints.” –Not running CCT until DME issues are resolved –Non-Thermal CSCs 3

Issues DME Affiliations –Definition of Control –Designation of who is responsible to manage affiliation –NPRR needed 3.19 in protocols is logically inconsistent 4

Competitive Constraints – Going Forward I will work on a draft of an NPRR to clean up 3.19 –Goal to have submitted by December 16 th PRS IMM currently working on an NPRR to resolve DME issues 5

Outages in the CRR Model Nodal Operating Guides 5.5(6) Congestion Revenue Right (CRR) Network Model Outage determination uses network topology of the CRR Network Model identified by ERCOT. This must include Planned Outages of Transmission Elements approved by ERCOT at the time the CRR Network Model is being built and that demonstrate significant impact to the transfer capability during the effective period. ERCOT will consider including Outages in the CRR Network Model that are scheduled to occur in the relevant time period and meet one or more of the following criteria: 6