M.P. RupenEVLA Advisory Committee Meeting September 6-7, 2007 1 Correlator Test Plan Michael P. Rupen.

Slides:



Advertisements
Similar presentations
Test Builder & Test Executor Sonja Vrcic Socorro, December 12, 2007.
Advertisements

Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Cross Correlators Walter Brisken.
The Prototype Correlator Sonja Vrcic Socorro, 5. December, 2006.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
P. Dewdney Herzberg Institute of Astrophysics National Research Council Canada EVLA Corr Schedule & Risk Issues.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
P. Dewdney Herzberg Institute of Astrophysics National Research Council Canada The EVLA Correlator.
Introducing the EVLA NRAO Postdoctoral Symposium, 29 April-1 May 2009 Michael P. Rupen Project Scientist for WIDAR.
1 SAGE Committee Meeting – December 19 & 20, 2008 National Radio Astronomy Observatory EVLA Goals, Progress, Status, and Projections Rick Perley Mark McKinnon.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
Pre-OTS Testing in Penticton Sonja Vrcic Socorro, December 11, 2007.
Software Status Sonja Vrcic Socorro,
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
Sean M. Dougherty Dominion Radio Astrophysical Observatory Herzberg Institute of Astrophysics National Research Council Canada The WIDAR Correlator.
EVLA Correlator Prototype and OTS Testing B. Carlson EVLA Correlator S/W F2F Apr 3-4, 2006.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 9/25/2012Prototype Review Meeting.
2007Sep06 EAC Butler - Software Overview 1 Software Overview Bryan Butler.
EVLA Monitor & Control Transition System Software
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
14 June, 2004 EVLA Overall Design Subsystems II Tom Morgan 1 EVLA Overall Software Design Final Internal Review Subsystems II by Tom Morgan.
RupenEVLA Advisory Committee Meeting May 8-9, Scientific Oversight and Testing of Software Michael P. Rupen EVLA Project Scientist for Software.
Introduction to EVLA Software Bryan Butler. 2006Dec05/06EVLA M&C Transition Software CDR2 EVLA Computing (Terse) History The original EVLA Phase I proposal.
1 SAGE Committee Meeting – December 19 & 20, 2008 National Radio Astronomy Observatory Correlator Status and Growth of Capabilities Michael P. Rupen Project.
Configuration Mapper Sonja Vrcic Socorro,
M.P. RupenCorrelator Face-to-Face Meeting 31 Oct 2006 Output Formats Part II Michael P. Rupen.
RupenEVLA Advisory Committee Meeting May 8-9, Software Requirements Michael P. Rupen EVLA Project Scientist for Software rev. 3may06.
M.P. RupenCorrelator Connectivity Scheme Review 31 July Correlator Specifications Michael P. Rupen.
M.P. RupenCorrelator Connectivity Scheme Review 31 July Scientific Impact Michael P. Rupen.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
Bill SahrNSF Review May , EVLA Monitor & Control.
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.
Data Examination and Checking Programs--Requirements B. Carlson
Jan 2016 Solar Lunar Data.
Software Overview Sonja Vrcic
Interaction of SSS Software
EVLA Availability - or - When Can I Use It?
Monitor and Control Software
Average Monthly Temperature and Rainfall
EVLA Prototype Correlator (PTC)
PTC Setup at VLA B. Carlson
Software Requirements
Rick Perley National Radio Astronomy Observatory
Shared Risk Observing Claire Chandler EVLA SSS Review, June 5, 2009
Scientific Oversight and Testing of Software
VLA to EVLA Transition Plan
EVLA Advisory Committee Meeting
Science Commissioning
Software Requirements
EVLA Monitor & Control System
Gustaaf van Moorsel September 9, 2003
Software Requirements
Prototype Correlator Testing
Shared Risk Science with the EVLA
EVLA Advisory Committee Meeting, March 19-20, 2009
Observatory Science Operations
Observatory Science Operations
Prototype Correlator Tests on the Critical Path
Correlator Growth Path
EVLA Construction Status
EVLA Advisory Panel Mtg. System Overview
Presentation transcript:

M.P. RupenEVLA Advisory Committee Meeting September 6-7, Correlator Test Plan Michael P. Rupen

M.P. RupenEVLA Advisory Committee Meeting September 6-7, Testing the Prototype Correlator (PTC) Hardware testing at DRAO –Dec Jun 2008Dec Nov 2008 Critical Design Review –Jun 2008Nov 2008 Critical on-the sky tests at VLA –Aug Nov 2008Dec Apr 2009 Further systems integration at VLA –on-going (Butler) Commissioning of basic correlator setups –Jan Sep 2009Jun Feb 2010

M.P. RupenEVLA Advisory Committee Meeting September 6-7, Hardware tests at DRAO 2 Station Boards and 2 Baseline Boards (“Stage 2 Prototypes”) –StB, BlB Test & Verification Plans (15apr07, 19mar06) [check voltages, connections, etc.] –Mostly ad hoc testing –Develop test suites to check subsequent boards (push button pass/fail test) –Dec Feb 2008Dec Apr 2008

M.P. RupenEVLA Advisory Committee Meeting September 6-7, Hardware tests at DRAO Assemble 14 more StB, BlB ==> 16 of each, in racks –Check thermal emission and electricity requirements of full racks –Ad hoc tests: test vectors, phase models, CBE commands, … –Software required: real-time, Test Executor –Creates test suite, but probably one-off (doesn’t match setup at EVLA/eMERLIN) –Feb Jun 2008Jul Nov 2008 Critical Design Review at end of this stage

M.P. RupenEVLA Advisory Committee Meeting September 6-7, Prototype Correlator at VLA site Cables, racks already installed 12 Baseline Boards, 10 Station Boards 3/4 quad (12 sub-bands, 1.5 GHz/pol’n at 4 bits), 10 antennas –45 baselines, 3072 channels in “wideband” mode ==> 5 GB in 12 hours (10s integrations) –With maximum recirculation: 45 baselines, 750,000 channels

M.P. RupenEVLA Advisory Committee Meeting September 6-7, Initial setup at the site

M.P. RupenEVLA Advisory Committee Meeting September 6-7, DRAO tests at the site Subset of test suite for new correlator setup -- ensures hardware is ok, at the same level as in Penticton

M.P. RupenEVLA Advisory Committee Meeting September 6-7, NRAO Tests: in priority order 1)Critical on-the sky tests leading to signoff on final production order for correlator hardware 2)Further on-the-sky tests to check correlator software 3)Systems integration with EVLA M&C 4)EVLA hardware tests and exploration 5)Scientific/usage exploration Primary responsibility: NRAO; key DRAO personnel available (initially on-site) NOTE: some of this will be done in parallel NOTE: timescales depend on results (FTE allocation discussed in Chandler talk)

M.P. RupenEVLA Advisory Committee Meeting September 6-7, Critical On-the-Sky Tests Required before final procurement –Not done for any other correlator -- but this is the heart of the EVLA (due diligence) –Puts these on the critical path Critical ==> required tests prove the hardware works –Not intended to reveal all correlator software flaws –Not intended to cover all modes required for scientific use Documentation –May 2006: DRAO draft –Dec 2006: NRAO review –Aug 2007: NRAO re-write based on new connectivity scheme, revised schedule, revised definition of PTC (more capable, closer to final config.)

M.P. RupenEVLA Advisory Committee Meeting September 6-7, Critical On-the-Sky Tests The tests –Basic setup/connectivity checks –Delay tracking –Noise switching –First fringes –Strong source, known flux density (check corr’n coeff) –Deep integration on mostly blank field (corr offsets and other systematics) –Deep spectral line integration (bandpass stability) –Recirculation on narrow line(s) –Sub-band stitching (comes “for free”) Preference for D configuration (esp. in summer) Currently scheduled to take 4 months –Jul Nov 2008Dec Apr 2009

M.P. RupenEVLA Advisory Committee Meeting September 6-7, Further On-the-Sky Tests Intended to check correlator software, as well as less serious hardware flaws Examples: –Sub-band comparisons –Short, medium, long baselines –High dynamic range imaging –Closure tests –8-bit vs. 3-bit (apart from deep integrations) –Real-time RFI robustness & blanking –Pulsar modes –Phasing –7-bit re-sampling

M.P. RupenEVLA Advisory Committee Meeting September 6-7, Systems Integration Correlator setup: Carlson, Clark, Fort, Harland, Vrcic –Conversion from user inputs to definition of what to do –ObsPrep –Executor –VCI/Configuration Mapper Correlator output: Benson, DuPlaine, Golap, Greisen, Moellenbrock, Moeser, Pokorny –Correlator Backend (CBE) –Fast formatter –Data capture (including metadata) and archives –Filler –Data reduction path

M.P. RupenEVLA Advisory Committee Meeting September 6-7, EVLA Hardware Tests and Integration Samplers Wideband feeds & receivers Stability RFI response … See Chandler talk (performance verification)

M.P. RupenEVLA Advisory Committee Meeting September 6-7, Scientific/usage Exploration End-to-end checks of a representative subset of capabilities Verification & review of… –sub-band definition, tuning, stitching –CBE processing: calibration, averaging, smoothing, RFI excision, …

M.P. RupenEVLA Advisory Committee Meeting September 6-7, Scientific/usage Exploration Exploration of RFI environment Documentation & setup (ObsPrep) Calibration timescales and requirements Post-processing and pipelines …

M.P. RupenEVLA Advisory Committee Meeting September 6-7, Final Correlator Note that Prototype Correlator is now part of (and a significant part of) the “real” correlator