1 ILD Workshop purpose and scope Yasuhiro Sugimoto May 23,

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

5 th ILD Workshop Orsay, 23 rd -25 th May 2011 D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC) F. Arteche, C. Esteban - ITA Strip FTD Readiness for.
Keynote Workshop Charge Akiya Miyamoto, KEK 16-April-2009 ILD Software Workshop.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Slides for Project Review 15 Dec ILD Future Colliders ILC, ILC-CLIC & Detectors ILD  VTX,LCTPC,CALICE.
RD’s Report (update since LCWS08 in Chicago) 2009/4/171TILC09 S.Yamada Sakue Yamada April Tsukuba.
4th Meeting of the Washington Group on Disability Statistics Fourth meeting of the WG: objectives and agenda Jennifer H. Madans U.S.A.
Trigger and online software Simon George & Reiner Hauser T/DAQ Phase 1 IDR.
The Charter: Selling Your Project Alex S. Brown, PMP Mitsui Sumitomo Insurance Group, USA Session TLM02.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
 k0k0 ++ -- -- p ILC Technical Design Report Physics and Detectors – Detailed Baseline Design Juan A. Fuster Verdú, IFIC-Valencia PAC Meeting, KEK.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
Charge to the SiD Workshop Andy White University of Texas at Arlington.
MEXT Review Process in Japan 2014/7/16 Y. Sugimoto 1.
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
F. Richard LAL/Orsay CLIC-ILC connections on Detectors PAC Paris meeting October 20, 2008.
RD’s Report Sakue Yamada Aug. 24, 2011 Institute Mumbai 2011/8/241Sakue ILCSC, Mumbai.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
Status of ILC detector/physics activity Sakue Yamada Apr. 24, /4/241Sakue
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
Request for Proposal (RFP)
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Collaboration Meeting 1: Oxford Introduction Discussion J. C. Sheppard.
Software Common Task Group Meeting Akiya Miyamoto 6-June-2011.
Report from Software Workshop before TILC09 (16-April) Akiya Miyamoto, KEK 21-April-2009 ILD Meeting.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
Nick Walker AD&I WebEx Meeting TeV Upgrade Study AD&I WebEx Meeting Nick Walker 1 Brief summary of ALCPG’11 discussions.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
1 FPCCD VTX Work Plan Y. Sugimoto 2010/1/22. 2 FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size chip; ~6mm.
1 ILD meeting LAL M. Joré – Integration status Matthieu Joré – 25 th of May ILD integration status and open issues.
Software Common Task Group Report Akiya Miyamoto ILC PAC POSTECH 3 November 2009.
ILD Vertex Detector Y. Sugimoto 2012/5/24 ILD
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
RD’s Report Sakue Yamada May 23, /05/231 Sakue
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
ILD meeting Thursday May 30, 2013 Ties Behnke, Yasuhiro Sugimoto.
Accelerator Systems TAG Leaders’ Meeting PM Report –Planning for ALCPG –TDR preparations: Area System Baseline Technical Reviews –Recent e+ workshop experience.
Summary of MC requests for DBD benchmarks ILD Workshop, Kyushu University May 23,
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Report from SB2009 Working Group Akiya Miyamoto 8-July-2010 DESY ILD Software and Integration Workshop.
PCAP Close Out Feb 2, 2004 BNL. Overall  Good progress in all areas  Good accomplishments in DC-2 (and CTB) –Late, but good.
Goals and Aims for Software Development for ILD Steve Aplin Linear Collider Software Meeting 2 nd Febuary 2012.
H. MAINAUD DURAND CFS TDR design status Survey & alignment MDI meeting, 16/03/2012.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
ITIL Project Change Management Workshop 7 February 2007
Global Design Effort Close-Out Points EDR time-scale (2010) –No demonstrations to ILC-like RF unit –3(?) CMs constructed at FNAL – not RDR baseline –2(?)
TDR Technical Editorial Board Webex meeting, 16 th Dec 2011 Report from the Chair (John) Technical Editing reports (Benno, Maura) Review of TDR Outlines.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
ILD status report Yasuhiro Sugimoto KEK for the ILD concept group
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
Brief summary of discussion at LCWS2010 and draft short term plan
Goal of the workshop To define an international roadmap towards colliders based on advanced accelerator concepts, including intermediate milestones, and.
Strategy Ties Behnke
Preparations for the SiD Workshop at Fermilab, April 9-11
Introduction to the Workshop
The DBD: Outline and Scope
ILD Optimisation: towards 2012 University of Cambridge
Workshop charge F. Richard for the WWS-OC
Presentation transcript:

1 ILD Workshop purpose and scope Yasuhiro Sugimoto May 23,

2 This workshop This workshop was originally planned to be held at KEK Accident of Fukushima Daiichi Nuclear Power Plant after 3.11 earthquake made governments of several countries advise our colleagues not to go to Japan We decided to change the venue from KEK to LAL Many thanks to Roman and LAL people for undertaking the workshop host and preparing it in short time

3 Where we are Detailed Baseline Design report (DBD) should be submitted by the end of 2012 “Realism” is required for design of sub-detectors, detector integration, cost estimate, and the simulation model Realistic design of sub-detectors and integration are getting their shape, but still on the way For mass production of the simulation data, physics analysis, and writing DBD, development of the simulation software has to be frozen 13 months before the deadline meeting in ALCPG11) >1 month is necessary to implement baseline into simulation  Simulation baseline has to be completely fixed by coming autumn So it’s time now to start defining the software baseline

4 Tentative ILD roadmap Finalize procedure Define options/alternatives Define software baseline Detector R&D has to be continued beyond 2012 towards construction-ready design (TDR)

5 Purpose of the workshop The purpose of this workshop is to accelerate effort towards DBD by –Reviewing status and plan of activities –Defining ILD software baseline –Planning for DBD Agenda includes –Reports from RD and GDE PM –Survey of detector R&D activity relevant to ILD –Review of physics analysis –CFS discussion –Discussion on MDI/Integration issues –Discussion on costing methodology –Review of software tools –Discussion and definition of ILD software baseline –Discussion on the next step

6 Software baseline For the purpose of mass production of simulation data for physics analysis, it is inevitable to define “one” design in the simulator  Software baseline Requirement from software group on the Software baseline –Debugged MOKKA driver exists –Reconstruction code with demonstrated performance exists For other options not part of the software baseline but part of the hardware baseline, full simulation and reconstruction should be done to demonstrate the performance with less amount of data samples

7 Hardware options Baseline, options, and alternatives –ILD will not attempt to exclude sub-detector technologies (as long as they are applicable to ILD) or make a down-selection –If a sub-detector technology satisfies certain criteria, it will be considered as one of the sub-detector “options” of ILD –Sub-detector technologies which are not demonstrated to satisfy the criteria but still seems promising will be categorized as “alternatives” The hardware review process will start late 2011 or early 2012 (?) Detector “hardware baseline” which includes several sub-detector options will be defined in Q3 of 2012 (?)

8 Agenda Introduction Sub-detectors

9 Agenda Sub-detectors CLIC

10 Agenda Analysis/Background Webex available

11 Agenda Tuesday afternoon: Parallel session AnalysisCFS

12 Agenda AnalysisCFS

13 Agenda Detector Integration Software/Simulation Costing Discussion

14 Topics to be clarified in this WS Simulation baseline Timeline of the large scale production –Readiness of software tools –1 TeV machine parameter –Output from LHC –European strategy meeting State of the analysis –Benchmark processes are properly covered? State of the sub-detector design –Any missing part of the design studies? State of the detector design/integration –Some issues to be agreed upon Procedure of hardware review (?)