State of the Practice (2009) Architecture Stakeholder Forum 10 June 2009 UAP Auditorium Diliman, Quezon City, Metro Manila for the PRC Professional Regulatory.

Slides:



Advertisements
Similar presentations
The Chemical Engineering Law of 2004
Advertisements

Building on Our Core Values Building on Our Core Values © 2003 by the AICPA The Sarbanes-Oxley Act.
Towards a Better Appreciation of Architects & R.A. No (The Only PH Law on the Practice of the State-regulated Profession.
Republic of the Philippines Department of Public Works and Highways (DPWH) Office of the Secretary National Building Code Review Committee (NBCRC) and.
Lobbying and interest representation EU institutions must operate in an OPEN fashion (principle stated in article 1 of the Treaty on EU) Lobbying and.
Extending the Hands of Justice to the Victims of IR & TIP (for OE)
1 The Development of Corporate Governance in Hong Kong Paul M Y Chow Chief Executive Hong Kong Exchanges and Clearing Limited Presented at the AIA Luncheon,
THE ROADMAP FOR ARCHITECTURE
The 2008 Canberra Accord and the Future of Architectural Education in the PH TRIPARTITE MEETING (PRBoA, IAPOA-UAP & CODHASP) TRIPARTITE MEETING (PRBoA,
What are the Main ARCHITECTURAL PLANS/ DOCUMENTS
Internal Auditing and Outsourcing
MYTHS and FACTS About the Practices of the Regulated Professions of Architecture and Civil Engineering in the Philippines 04 December 2007 UAP-IAPOA Balangkasan.
(Official Position of the Philippine Civil Engineers)
How R.A. No. 9266, its IRR and Derivative Regulations Affect the Practice of Architecture (Pertinent Provisions & Relation to Other Laws) 21 September.
Guidelines for Conducting Training and Procedures Reporting Safety Loss Loss Control Committee Meetings.
AFAS & GATS in a nutshell Ar Armando N. ALLÍ, apec ar
Accounting Reform and Development in China FENG Shuping Assistant Minister, Ministry of Finance People's Republic of China.
CSI: Laws, Rules and Regulations that Govern the Practice and as All These Relate to the Full Implementation & Enforcement of R.A. No (The Architecture.
Diversified Experience in Architecture (DEA) Logbook Filing
Best Practices in Conducting a TECHNICAL Feasibility Study ( TFS ) for a Public-Private Partnership ( PPP ) Infrastructure Project (unabridged version)
Preparing PH Registered & Licensed Architects (RLAs) for GATS The Professional Regulatory Board of Architecture ( PRBoA ) Ar Armando N. ALLÍ, apec ar Ar.
APGNS Continuing Professional Development & Competency Assurance Program (CPD) David C. Carter, P.Geo, FGC. November 13, 2013.
Green Courts and Environmental Protection in Thailand: Perspectives on the Map Ta Phut Case SRISUWAN JANYA ( ทษ. บ., ศศ. บ., นบ., ศศ. ม., วท. ม., พปป.)
(The National Building Code)
Click to edit Master text styles – Second level Third level – Fourth level » Fifth level グリーンアクセスプロジェクト Green Access Project Principle 10 and Access to.
Framework for Regulation May Outline of Presentation 1.Background – Initiation of the Framework – Purpose of the Framework Framework Review.
A REPORT ON GOVERNMENT IMPLEMENTATION OF THE 1999 SUMMIT RESOLUTIONS : 26 TH MARCH 2003 A review and revision of legislation COMBATING CORRUPTION A review.
The Implementation & Enforcement of R.A. No (as of August 2009) Delivered at a UAP-IAPOA Induction/ Oath-taking Ceremony August 2009 for the PRC.
Capital Markets Authority September 20, 2013 Turkish-Arab Capital Markets Forum 1.
Immigration Consultants and the IRB Lois D. Figg, Assistant Deputy Chairperson, Refugee Protection Division 1 November 2007 IRB/CISR 528 (02/07)
Pro-Active RLAs* Must Now Take the Legal Offensive *Registered and Licensed Architects 05 September 2009 PRC Professional Regulatory Board of Architecture.
PRBoA(rchitecture) Milestones ( ) 10 Feb 2011.
THE AUDIT BOARD OF INDONESIA : FIGHTING AGAINST CORRUPTION 10 th ASOSAI RESEARCH PROJECT MEETING Dec , 2012 SHENZHEN CITY - CHINA.
Discussion of Ethics & Campaign Finance Reform Packet Presented by Thomas B. Drage, Jr., County Attorney, and Dana Crosby, Assistant County Attorney June.
The Case of Estonia New Code of Ethics for Officials Anneli Sihver, Ministry of Finance 2 October 2015.
Copyright © 2008 by the Actuarial Board for Counseling and Discipline A Presentation by Michael Toothman, June 5, 2008 Actuarial Board for Counseling and.
Get the Facts Right! And Do What is Right! (A RLA’s* Generic Briefing Material for Government Officials/ Public Sector and for Clients/ the Private Sector.
BOA Chairman Joel L. Tan-Torres QUALITY ASSURANCE REVIEW PROGRAM.
Get the Facts Right! And Do What is Right! (A RLA’s* Generic Briefing Material for Government Officials/ Public Sector and for Clients/ the Private Sector.
Vice-Principal Conference NAHT Thursday 12 th November 2009.
Presenters: Promoting Regulatory Excellence Anne-Marie Ryan An Bord Altranais- the Nurses and Midwives Board of Ireland Connecting the Dots II: The European.
Licensing and Library Legislation: The Philippine Experience Thelma S. Kim Regional Conference on Libraries, Archives and Museums in conjunction with the.
Name: Lukas Kokelaar Felipe Montanares Subject: English Miss: Ángela Chaparro Date: 27/09/15.
Issues & Concerns of the PRBoA  As presented by the  Professional Regulatory Board of Architecture (PRBoA)  on 30 June 2012.
How Can Competition Benefit Our Daily Lives 04 November 2014 Diamond Hotel, Manila Ruth U. Tan Office for Competition Department of Justice State of Competition.
Mutual Recognition Arrangement for Accountancy Services Background and what CPAs should do to Prepare for this 3A series release 1 December 2015 BoA Chairman.
IAEA International Atomic Energy Agency Arusha, Tanzania Uganda Dr. Akisophel Kisolo Project Counterpart 2 – 5 December 2013 RAF9038 Final Coordination.
Local Planning, Design, Construction & Development, Land & Building Use and the Laws that Govern Such Activities and as All These Relate to the Full Implementation.
Getting the Facts Right (A RLA’s* Briefing Material for Government Officials/ Public Sector and for Clients/ the Private Sector) *Registered and Licensed.
The role and responsibilities of the EITI Board Members Lima, 23 February 2016 Christian Fr. Michelet.
FORMATION OF COMPANY. Steps for formation of a company  Electronic filing of form  Incorporation of company  Certificate of incorporation  Promoter.
Building on Our Core Values Building on Our Core Values © 2003 by the AICPA The Sarbanes-Oxley Act.
REPUBLIC of the PHILIPPINES. Philippine Legal System Government Structure Three (3) branches of the government: EXECUTIVE LEGISLATIVE JUDICIARY.
REPUBLIC OF ALBANIA PUBLIC PROCUREMENT AGENCY Eighth Regional Public Procurement Forum May, 22-25, 2012 Tirana
CAREER PLANNING. License to practice for nurses Definition of license legal document given by the government that permits a person to offer to the public.
The revised Professional Qualifications Directive
Sa wat dee krap. Pom cheu Ar
4 Social Responsibility of Business and Government
4 Social Responsibility of Business and Government
NEGOTIATING BILATERAL LABOR AGREEMENTS FOR MIGRANT DOMESTIC WORKERS: THE PHILIPPINE EXPERIENCE THE 10TH ASEAN FORUM ON MIGRANT LABOUR October.
The Sarbanes-Oxley Act
Recognition and enforcement of foreign judgments and arbitral awards in Russia Roman Zaitsev, PhD, Partner 05/09/2018.
4 Social Responsibility of Business and Government
IMPLEMENTATION OF THE SOUTH AFRICAN LANGUAGE PRACTITIONERS COUNCIL ACT, 2014 (Act No. 8 of 2014) PRESENTED TO THE SELECT COMMITTEE ON EDUCATION & RECREATION.
The Optional Protocol Module 8.
REGIONAL NETWORK FOR CIVIL ORGANIZATIONS ON MIGRATION – RNCOM
              Country Report The 33rdARCASIA Council Meeting October 28-November 2, 2012 Bali, Indonesia  “Architects leading the Culture of Green.
MODERN BAR ASSOCIATION CONFERENCE
Paolo Valente UNECE Statistical Division
EITI - Grievance mechanisms
Presentation transcript:

State of the Practice (2009) Architecture Stakeholder Forum 10 June 2009 UAP Auditorium Diliman, Quezon City, Metro Manila for the PRC Professional Regulatory Board of Architecture (PRBoA) Arch. Armando N. ALLÍ, fuap, hfpia, aaif, apec ar Chairman, PRBoA (Presenter) PRBoA

PRBoA About 50,000 Direct Architecture Stakeholders ! 23,500 Registered Architects(RAs) compared with 110,000 Registered Civil Engineers (CEs) ; (14,000) RLAs with valid PRC ID cards; (8,000) IAPOA Members compared with 63,000 Members Claimed by the PICE ; 4,000 Apprentices; 13,000 Students (including irregular enrollees) ; 70 Schools; 10,000 Under the Radar (persons with knowledge of architecture and working with non-architects or doing something else); and about 150,000 Dependents/Workers PRBoA About 50,000 Direct Architecture Stakeholders ! 23,500 Registered Architects(RAs) compared with 110,000 Registered Civil Engineers (CEs) ; (14,000) RLAs with valid PRC ID cards; (8,000) IAPOA Members compared with 63,000 Members Claimed by the PICE ; 4,000 Apprentices; 13,000 Students (including irregular enrollees) ; 70 Schools; 10,000 Under the Radar (persons with knowledge of architecture and working with non-architects or doing something else); and about 150,000 Dependents/Workers _____________________________________________________________________________________________________________________________________________________________________ State of the Practice (2009) 10 June 2009 Architecture Stakeholder Forum for the PRC PRBoA (Archt. Armando N. ALLI, fuap, hfpia, aaif, apec ar, PRBoA Chairman as Presenter)

PRBoA Organizations of Stakeholders! 8,000 UAP-IAPOA Members (Natural Persons/ NPs, including CoF, GA & SA ); (2,000) PIA Members (NPs); (200) AAIF Members (NPs); 60 CODHASP Members (Juridical Persons/ JPs); Alumni Associations; Student Associations; and No Association of Architectural Firms (to succeed the CCAPP which folded up in late 2006). PRBoA Organizations of Stakeholders! 8,000 UAP-IAPOA Members (Natural Persons/ NPs, including CoF, GA & SA ); (2,000) PIA Members (NPs); (200) AAIF Members (NPs); 60 CODHASP Members (Juridical Persons/ JPs); Alumni Associations; Student Associations; and No Association of Architectural Firms (to succeed the CCAPP which folded up in late 2006). _____________________________________________________________________________________________________________________________________________________________________ State of the Practice (2009) 10 June 2009 Architecture Stakeholder Forum for the PRC PRBoA (Archt. Armando N. ALLI, fuap, hfpia, aaif, apec ar, PRBoA Chairman as Presenter)

PRBoA R.A. No & IRR are in full effect! NO Temporary Restraining Order (TRO); NO Writ of Preliminary Injunction; and NO Question on the Constitutionality of ANY of its Provisions or of its Implementing Rules & Regulations (IRR) Note: Sec. 302 of P.D. No (the 1977 NBCP) Reconfirmed in June 2009 by the National Printing Office and the Malacañang Records Office as Authentic & Un-amended PRBoA R.A. No & IRR are in full effect! NO Temporary Restraining Order (TRO); NO Writ of Preliminary Injunction; and NO Question on the Constitutionality of ANY of its Provisions or of its Implementing Rules & Regulations (IRR) Note: Sec. 302 of P.D. No (the 1977 NBCP) Reconfirmed in June 2009 by the National Printing Office and the Malacañang Records Office as Authentic & Un-amended _____________________________________________________________________________________________________________________________________________________________________ State of the Practice (2009) 10 June 2009 Architecture Stakeholder Forum for the PRC PRBoA (Archt. Armando N. ALLI, fuap, hfpia, aaif, apec ar, PRBoA Chairman as Presenter)

PRBoA Secs & 4 of the 2004 Revised IRR of P.D. No (1977 NBCP) are in full effect! These limit the signing and sealing of architectural plans only to registered & licensed architects (RLAs). NO Temporary Restraining Order (TRO); NO Writ of Preliminary Injunction (The May 2005 Injunction secured by the PICE was lifted/ dissolved in Jan 2009). PRBoA Secs & 4 of the 2004 Revised IRR of P.D. No (1977 NBCP) are in full effect! These limit the signing and sealing of architectural plans only to registered & licensed architects (RLAs). NO Temporary Restraining Order (TRO); NO Writ of Preliminary Injunction (The May 2005 Injunction secured by the PICE was lifted/ dissolved in Jan 2009). _____________________________________________________________________________________________________________________________________________________________________ State of the Practice (2009) 10 June 2009 Architecture Stakeholder Forum for the PRC PRBoA (Archt. Armando N. ALLI, fuap, hfpia, aaif, apec ar, PRBoA Chairman as Presenter)

PRBoA R.A. No. 9266’s Regulation Stream IRR in full effect since 01 Dec 2004; and Code of Ethics in effect since Standards of Practice about 10% revised; need to fast-track this effort; Some Guidelines & derivative regulations already issued by the PRBoA & PRC; & Manual of Procedure (MoP)* for crafting. * Note: The MoP shall give direct instructions to RLAs as to how to react when confronted with certain practice situations or conditions. The MoP shall be based on the collective experiences and actions of RLAs to guide other RLAs. PRBoA R.A. No. 9266’s Regulation Stream IRR in full effect since 01 Dec 2004; and Code of Ethics in effect since Standards of Practice about 10% revised; need to fast-track this effort; Some Guidelines & derivative regulations already issued by the PRBoA & PRC; & Manual of Procedure (MoP)* for crafting. * Note: The MoP shall give direct instructions to RLAs as to how to react when confronted with certain practice situations or conditions. The MoP shall be based on the collective experiences and actions of RLAs to guide other RLAs. _______________________________________________________________________________________________________._____________________________________________________________ State of the Practice (2009) 10 June 2009 Architecture Stakeholder Forum for the PRC PRBoA (Archt. Armando N. ALLI, fuap, hfpia, aaif, apec ar, PRBoA Chairman as Presenter)

PRBoA Strengths (S) & Weaknesses (W) of RLAs & their practice: R.A. No & its IRR (S); Stakeholders all willing to cooperate with the PRBoA and with each other (S); Visible Lack of Government Support that Created Many Difficulties in R.A. No Implementation & Enforcement (W); Limited Numbers of RLAs and Architectural Firms; and Negative Perception of RLA Role (W). PRBoA Strengths (S) & Weaknesses (W) of RLAs & their practice: R.A. No & its IRR (S); Stakeholders all willing to cooperate with the PRBoA and with each other (S); Visible Lack of Government Support that Created Many Difficulties in R.A. No Implementation & Enforcement (W); Limited Numbers of RLAs and Architectural Firms; and Negative Perception of RLA Role (W). _____________________________________________________________________________________________________________________________________________________________________ State of the Practice (2009) 10 June 2009 Architecture Stakeholder Forum for the PRC PRBoA (Archt. Armando N. ALLI, fuap, hfpia, aaif, apec ar, PRBoA Chairman as Presenter)

PRBoA Opportunities (O) for RLAs & their practice: Make full use of (capitalize on) the full effectivity of the pertinent laws/ IRRs and the recent favorable Court Decisions; RLAs as Constructors/ Builders; Borderless & Electronic Practices; Specializations; and Large Number of Aspirants. PRBoA Opportunities (O) for RLAs & their practice: Make full use of (capitalize on) the full effectivity of the pertinent laws/ IRRs and the recent favorable Court Decisions; RLAs as Constructors/ Builders; Borderless & Electronic Practices; Specializations; and Large Number of Aspirants. _____________________________________________________________________________________________________________________________________________________________________ State of the Practice (2009) 10 June 2009 Architecture Stakeholder Forum for the PRC PRBoA (Archt. Armando N. ALLI, fuap, hfpia, aaif, apec ar, PRBoA Chairman as Presenter)

PRBoA Fast Facts on Aspirants & Practitioners: 1) over the 9-year period 1998 through 2006, there were 19,060 graduates of the B.S. Arch. program; 2) 32.19% (6,136) of the said graduates were female; 3) for the year 2007, the POEA reported that there were 420 architects or town planners who left for work overseas i.e. 28 countries; KSA(rabia) had the highest number of such OFWs with 173 (41.19%); 4) 9.05% (38) of the said professional OFWs were female; 5) for the year 2007, the POEA also reported that there were 965 draftsmen who left for work overseas i.e. 24 countries (but those headed for jobs requiring architectural skillsets were not identified); KSA had the highest number of such OFWs with 455 (47.15%); and 6) 8.39% (81) of the said sub-professional OFWs were female. PRBoA Fast Facts on Aspirants & Practitioners: 1) over the 9-year period 1998 through 2006, there were 19,060 graduates of the B.S. Arch. program; 2) 32.19% (6,136) of the said graduates were female; 3) for the year 2007, the POEA reported that there were 420 architects or town planners who left for work overseas i.e. 28 countries; KSA(rabia) had the highest number of such OFWs with 173 (41.19%); 4) 9.05% (38) of the said professional OFWs were female; 5) for the year 2007, the POEA also reported that there were 965 draftsmen who left for work overseas i.e. 24 countries (but those headed for jobs requiring architectural skillsets were not identified); KSA had the highest number of such OFWs with 455 (47.15%); and 6) 8.39% (81) of the said sub-professional OFWs were female. _____________________________________________________________________________________________________________________________________________________________________ State of the Practice (2009) 10 June 2009 Architecture Stakeholder Forum for the PRC PRBoA (Archt. Armando N. ALLI, fuap, hfpia, aaif, apec ar, PRBoA Chairman as Presenter)

PRBoA Threats (T) to RLAs & their practice: GOVERNMENT ; MEDIA; BIG BUSINESS; OTHER PROFESSIONALS; FOREIGN CONSULTANTS/ BPO Firms; UNREGISTERED PERSONS; (including persons with some knowledge of architecture e.g. students, apprentices, etc. ) RLAs themselves, Apathy, Complacency, etc. PRBoA Threats (T) to RLAs & their practice: GOVERNMENT ; MEDIA; BIG BUSINESS; OTHER PROFESSIONALS; FOREIGN CONSULTANTS/ BPO Firms; UNREGISTERED PERSONS; (including persons with some knowledge of architecture e.g. students, apprentices, etc. ) RLAs themselves, Apathy, Complacency, etc. _____________________________________________________________________________________________________________________________________________________________________ State of the Practice (2009) 10 June 2009 Architecture Stakeholder Forum for the PRC PRBoA (Archt. Armando N. ALLI, fuap, hfpia, aaif, apec ar, PRBoA Chairman as Presenter)

PRBoA 2-Year Due Process Flow of CRIMINAL Complaints for R.A. No Violations: 1) Criminal Complaint filed at the PRC; 2) PRBoA establishes prima facie finding; 3) Complaint Endorsed to DoJ Secretary; 4) after review, DoJ Secretary endorses to either the NBI or Local Prosecutor/ Fiscal; 5) Local Fiscal investigates and either files information with the Court (if there is probable cause) or reverse-endorses the complaint to either the DoJ Secretary or the PRC/ PRBoA (in case of no finding of probable cause) i.e. NO CASE FILED AFTER 2 YRS PRBoA 2-Year Due Process Flow of CRIMINAL Complaints for R.A. No Violations: 1) Criminal Complaint filed at the PRC; 2) PRBoA establishes prima facie finding; 3) Complaint Endorsed to DoJ Secretary; 4) after review, DoJ Secretary endorses to either the NBI or Local Prosecutor/ Fiscal; 5) Local Fiscal investigates and either files information with the Court (if there is probable cause) or reverse-endorses the complaint to either the DoJ Secretary or the PRC/ PRBoA (in case of no finding of probable cause) i.e. NO CASE FILED AFTER 2 YRS _____________________________________________________________________________________________________________________________________________________________________ State of the Practice (2009) 10 June 2009 Architecture Stakeholder Forum for the PRC PRBoA (Archt. Armando N. ALLI, fuap, hfpia, aaif, apec ar, PRBoA Chairman as Presenter)

PRBoA Urgent and Special Concerns: 1) legal initiatives to fully implement and enforce R.A. No e.g. addressing the continuing illegal practices by firms and individuals, acts by other state-regulated professions to co-opt the practice of architecture, etc.; 2) formalization of the integration of the profession, the IAPOA structure/ organization and its relationship with the other architectural organizations; 3) the Standards of Professional Practice; 4) the GATS, APEC Architect Registry and ASEAN MRA; 5) the CPE/ CPD program; 6) laws directly affecting the practice (P.D. No. 1096, R.A. No. 9514, B.P. No. 344, P.D. No. 957, B.P. No. 220, R.A. No. 9184, R.A. No. 7160, etc.) and their IRRs/ derivative regulations; 7) the B.S. Architecture curriculum; 8) relations with the allied professions; 9) media campaign for the architectural profession; and 10) new appointments to the PRBoA. PRBoA Urgent and Special Concerns: 1) legal initiatives to fully implement and enforce R.A. No e.g. addressing the continuing illegal practices by firms and individuals, acts by other state-regulated professions to co-opt the practice of architecture, etc.; 2) formalization of the integration of the profession, the IAPOA structure/ organization and its relationship with the other architectural organizations; 3) the Standards of Professional Practice; 4) the GATS, APEC Architect Registry and ASEAN MRA; 5) the CPE/ CPD program; 6) laws directly affecting the practice (P.D. No. 1096, R.A. No. 9514, B.P. No. 344, P.D. No. 957, B.P. No. 220, R.A. No. 9184, R.A. No. 7160, etc.) and their IRRs/ derivative regulations; 7) the B.S. Architecture curriculum; 8) relations with the allied professions; 9) media campaign for the architectural profession; and 10) new appointments to the PRBoA. _____________________________________________________________________________________________________________________________________________________________________ State of the Practice (2009) 10 June 2009 Architecture Stakeholder Forum for the PRC PRBoA (Archt. Armando N. ALLI, fuap, hfpia, aaif, apec ar, PRBoA Chairman as Presenter)

PRBoA 2009 Architecture Stakeholders’ Fora: June at the UAP-IAPOA (Preliminaries); c. August at the PIA (continuance of the June Forum and possible agreement on the final draft of the Standards of Professional Practice ); and c. November for possible hosting by the AAIF (continuance of the August Forum). PRBoA 2009 Architecture Stakeholders’ Fora: June at the UAP-IAPOA (Preliminaries); c. August at the PIA (continuance of the June Forum and possible agreement on the final draft of the Standards of Professional Practice ); and c. November for possible hosting by the AAIF (continuance of the August Forum). _____________________________________________________________________________________________________________________________________________________________________ State of the Practice (2009) 10 June 2009 Architecture Stakeholder Forum for the PRC PRBoA (Archt. Armando N. ALLI, fuap, hfpia, aaif, apec ar, PRBoA Chairman as Presenter)

Thank You and a Pleasant Morning to You All! PRBoA ____________________________________________________________________________________________________________________________________ State of the Practice (2009) 10 June 2009 Architecture Stakeholder Forum for the PRC PRBoA (Archt. Armando N. ALLI, fuap, hfpia, aaif, apec ar, PRBoA Chairman as Presenter)