ALMA Integrated Computing Team Coordination & Planning Meeting #1 Santiago, 17-19 April 2013 ICT Group planning: Scheduling Jorge Avarias ICT Scheduling.

Slides:



Advertisements
Similar presentations
Company Confidential | © 2011 GrapeCity Inc. GRAPECITY BUSINESS SOLUTIONS GrapeCity Telemarketing Software for Microsoft Dynamics CRM.
Advertisements

© 2010 Wipro Ltd - Confidential SGSN Automation Testing Using TTCN3 Authors: Jyothi Gavara Nikhil Rahul Ekka.
Software Delivery. Software Delivery Management  Managing Requirements and Changes  Managing Resources  Managing Configuration  Managing Defects 
© 2005 by Prentice Hall Chapter 4 System Testing & Implementation Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F. George Joseph.
1 CMSC 132: Object-Oriented Programming II Software Development I Department of Computer Science University of Maryland, College Park.
Data Structures and Programming.  John Edgar2.
By Steven Campbell and Erik Boone.  Sharing projects by putting them into a central repository.  Checking out copies of projects from the repository.
System Implementation. System Implementation and Seven major activities Coding Testing Installation Documentation Training Support Purpose To convert.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
Data Management Subsystem: Data Processing, Calibration and Archive Systems for JWST with implications for HST Gretchen Greene & Perry Greenfield.
LSST Scheduler status Francisco Delgado Sr. Software Engineer Telescope & Site.
50mm Telescope ACS Course Garching, 15 th to 19 th January 2007 January 2007Garching.
ALMA Integrated Computing Team Coordination & Planning Meeting #2 Santiago, January 2014 ASDM relational database Rafael Hiriart / Jorge Avarias.
A Scheduling Algorithm with Dynamic Priorities Status Presentation Matias Mora Klein UTFSM Computer Systems Research.
Magnetic Field Measurement System as Part of a Software Family Jerzy M. Nogiec Joe DiMarco Fermilab.
Andreas Horneffer Status of MKSP LOFAR Observations.
T Project Review ITSUPS Implementation
ALMA Integrated Computing Team Coordination & Planning Meeting #2 Santiago, January 2014 Control Group Planning Rafael Hiriart, Control Group Lead.
1 Advanced topics in OpenCIM 1.CIM: The need and the solution.CIM: The need and the solution. 2.Architecture overview.Architecture overview. 3.How Open.
ALMA Integrated Computing Team Coordination & Planning Meeting #1 Santiago, April 2013 Relational APDM & Relational ASDM models effort done in online.
The ALMA TelCal subsystem Dominique Broguière, Institut de RadioAstronomie Millimétrique (IRAM) TelCal Phasing meeting – Grenoble -10/12/2012.
Doug Tody E2E Perspective EVLA Advisory Committee Meeting December 14-15, 2004 EVLA Software E2E Perspective.
ALMA Integrated Computing Team Coordination & Planning Meeting #1 Santiago, April 2013 ICT Group Planning: Control Rafael Hiriart ICT Control Group.
Study for Migration from CVS to SubVersion (SVN) Gunter Folger CERN/PH/SFT.
Scheduling Blocks: a generic description Andy Biggs (ESO, Garching)
Interactive CARA Simulation Prof. Insup Lee. Hierarchical EFSM Specification for CARA.
Observation Scheduling Review of SSS Software Readiness for SRO, June 5, 2009 Bryan Butler EVLA Computing Division Head.
ALMA Integrated Computing Team Coordination & Planning Meeting #4 Santiago, November 2014 Telescope Calibration Planning Dominique Broguière.
 Profile  Need  Objectives  Features  System work flow  Expected outcome  Implementation  Conclusion.
Construction 2 BTNC-ILA ISDM Group 3. Agenda Diagram Risk Testing Progress Next Plan Demo.
Testing the dynamic per-query scheduling (with a FIFO queue) Jan Iwaszkiewicz.
LSST Scheduler construction plan Francisco Delgado Sr. Software Engineer Telescope & Site.
T Project Review Sotanorsu I3 Iteration
Orientation Workshop on Product Development & Management Functions Workshop 1: Introduction to the Orientation Workshops March 29, 2007 The DSA Project.
Software Phase V Testing and Improvements to Test Procedures S. Corder and L.-A. Nyman April 18, 20131ICT Planning Meeting, Santiago.
Observing Modes from a Software viewpoint Robert Lucas and Philippe Salomé (SSR)
Integrated Monitoring Dashboard SEAP/BTIS/DB&I/Mar Integrated Monitoring Dashboard An Innovative Monitoring Approach Proposal by BTIS/DB&I.
ALMA Integrated Computing Team Coordination & Planning Meeting #1 Santiago, April 2013 Telescope Calibration Planning Dominique Broguiere.
ALMA Integrated Computing Team ICT Coordination and Planning Meeting #2 Santiago January 2014 Alarm system A.Caproni.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Status of MeteoSwiss 18 September 2008 COSMO GM 2008.
CERN IT Department CH-1211 Genève 23 Switzerland t Internet Services Job Priorities update Andrea Sciabà IT/GS Ulrich Schwickerath IT/FIO.
ES Slowdown, Optimization, Testing. Plan for shutdown: Timeline April: Focus on resolution of major outstanding issues: – Bulk data deployment  stable.
ALMA Integrated Computing Team Coordination & Planning Meeting #1 Santiago, April 2013 Acceptance Manager Transition Steve Scott.
Proposal: staged delivery of Scheduler and OpSim V1 (2016) meet most of the SRD requirements – Deliver a system that can be extended with an improved scheduler.
Lightning talk about Project Tracker (protrack) IRM meeting on Kyoko Nakamura.
WG 6 and Support Activities Overview Status Report Reference Version and Implementation WG Coordinator and Project Leader: Ulrich Schättler.
Configuration database status report Eric van Herwijnen September 29 th 2004 work done by: Lana Abadie Felix Schmidt-Eisenlohr.
A Fault-Tolerant Scheduling Algorithm for Real-Time Periodic Tasks with Possible Software Faults Ching-Chih Han, Kang G. Shin, and Jian Wu.
OSG Area Coordinator’s Report: Workload Management Maxim Potekhin BNL May 8 th, 2008.
ALMA Integrated Computing Team Coordination & Planning Meeting #3 Socorro, June 2014 Online system tools and Control's scope expansion Rafael Hiriart.
T EST T OOLS U NIT VI This unit contains the overview of the test tools. Also prerequisites for applying these tools, tools selection and implementation.
11/01/2012B.Couturier - Core Software Workshop 1 Software Development Infrastructure Main Topics Development tools Build and Release tools Tracking/Management.
ALMA Integrated Computing Team Coordination & Planning Meeting #1 Santiago, April 2013 Release Manager and Acceptance Manager Roles J. Ibsen/ R.
HSC Queue Mode Implementation Plan ~ Stage I, II, III ~ Tae-Soo Pyo Subaru Telescope /01/15.
AWIPS Governance What are we Governing? –EDEX/CAVE plugins developed for an operational AWIPS system Out of Scope: GFE Smart inits and tools, µengine.
T Project Review Sotanorsu I2 Iteration
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
APEX Audit System PHONE:
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
ALMA Software Scheduling subsystem Planning for cycle5 onwards
From delivery to acceptance
Get to know SQL Manager SQL Server administration done right 
Simulation Requirements
LCGAA nightlies infrastructure
DBA Coordination Group Update José Parra
IS IT EFFECTIVE TO RUN ONLINE DATING BACKGROUND CHECKS YOURSELF?
AUTOMATED SESSION PLANNING. In the present world, everything has become automated. By, a click everything is being processed. But the preparation of the.
Definitions of Done Every team’s definition of done will be different
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
Support Activities and WG 6 Overview Status Report
Presentation transcript:

ALMA Integrated Computing Team Coordination & Planning Meeting #1 Santiago, April 2013 ICT Group planning: Scheduling Jorge Avarias ICT Scheduling Group Lead

Scheduling Group Overview People  Jorge Avarias (also participating in Control group)  In Practice 0.5 FTE  Eventually 1 FTE will be allocated Responsibility  Scheduling Group is in charge to develop the software.  Help to achieve optimizations.  DSO defines background (algorithms, training mechanisms, weather forecasting, calculation formulas, etc).

Scheduling software parts Scheduling Array online component  Online queue OMC Scheduling Panel  To queue SchedBlocks into an array  Check information related to ObsProject/SB Scheduling Updater  Converts APDM ObsProject/ObsProgram/SB into relational scheduling model. Dynamic Scheduling Algorithm (DSA) Planning Mode Simulator (APRC simulator)

Deliveries since 2012 Coordination Meeting Bookkeeping.  Scheduling writes to state archive the exec status for a SB observed. Check for calibrators and change status of the SchedBlocks accordingly.  Plug-in for the state system and Scheduling updater checker.  Still missing the python script to check in calibrator catalog. Cycle 1 version of Planning Mode Simulator. Refactoring of Scheduling Updater – performance improvements. 1-Day Planning Simulator.  DAO to access to the weather forecast from APEX. New Selectors for DSA.

Current Planning Process New features are mainly concentrated on DSA and simulators. Bi-weekly scheduling meeting is the main discussion point to decide priorities and planning.  DSO representatives participate in the meeting (Masao and occasionally Andreas and Baltasar)

Upcoming features “Recession” period:  Improvements in usability of the Scheduling Panel After “recession”:  DSA improvements  Simulator improvements  Receiver band management?

ICT-CPM April 2013 Current testing status Scheduling has unit tests covering ~30% of the written code for the online system.  This doesn't include DSA parts (selectors and scorers), APDM model conversion, DB connections. Unit Tests are run after every commit to subversion is done. Every new feature and change done to scheduling includes a new unit test, if possible. Integration and performance tests are run manually.

ICT-CPM April 2013 Current testing status